A mathematical model for optimal turnaround maintenance planning and scheduling for a network of plants in process industry supply chain

被引:0
作者
Duffuaa, Salih [1 ,2 ]
Idris, Mohamed [3 ]
Kolus, Ahmet [1 ,2 ]
Al-Turki, Umar [4 ]
机构
[1] King Fahd Univ Petr & Minerals, Dept Ind & Syst Engn, Dhahran 31261, Saudi Arabia
[2] King Fahd Univ Petr & Minerals, Interdisciplinary Res Ctr Smart Mobil & Logist, Dhahran 31261, Saudi Arabia
[3] Prince Sultan Univ, Dept Engn Management, Riyadh, Saudi Arabia
[4] King Abdulaziz Univ, Dept Ind Engn, Jeddah, Saudi Arabia
关键词
Maintenance scheduling; Turnaround planning; Mathematical programming; Supply chain; Petrochemical process; OPTIMIZATION; SHUTDOWN;
D O I
10.1016/j.compchemeng.2023.108477
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Turnaround (TAM) is a periodic maintenance in which plants are shutdown to conduct inspections, repairs, preventive maintenance and overhauls. The shutdown periods range from three to four weeks and prolonging this period is expensive and therefore requires effective planning. The primary purpose of this paper is to develop a mathematical programming model to coordinate and plan TAM for several plants in an integrated supply chain network. A secondary objective is to develop a heuristic algorithm for solving the model when the network has large number of plants. The model and the algorithm are developed, tested and applied on a case study petrochemical supply chain. The exact algorithm takes 8.3 times the time of the heuristic. In addition the heuristic algorithm provides near optimal solution in much shorter time. The developed model provides a tool to plan TAM for several plants in an integrated supply in an optimal fashion.
引用
收藏
页数:9
相关论文
共 32 条
  • [1] Al-Turki U., 2013, C MAINT PERF MEAS MA
  • [2] Al-Turki UM., 2014, INTEGRATED MAINTENAN, P25, DOI [10.1007/978-3-319-06290-7_3, DOI 10.1007/978-3-319-06290-7_3]
  • [3] Medium-term maintenance turnaround planning under uncertainty for integrated chemical sites
    Amaran, Satyajith
    Zhang, Tong
    Sahinidis, Nikolaos V.
    Sharda, Bikram
    Bury, Scott J.
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2016, 84 : 422 - 433
  • [4] Long-term turnaround planning for integrated chemical sites
    Amaran, Satyajith
    Sahinidis, Nikolaos V.
    Sharda, Bikram
    Morrison, Matt
    Bury, Scott J.
    Miller, Scott
    Wassick, John M.
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2015, 72 : 145 - 158
  • [5] Arts R.H.P.M., 1998, J QUAL MAINT ENG, V4, P6
  • [6] BenDaya M, 2009, HANDBOOK OF MAINTENANCE MANAGEMENT AND ENGINEERING, P1
  • [7] Maintenance optimization with duration-dependent costs
    Bohlin, Markus
    Warja, Mathias
    [J]. ANNALS OF OPERATIONS RESEARCH, 2015, 224 (01) : 1 - 23
  • [8] Optimal maintenance scheduling of a gas engine power plant using generalized disjunctive programming
    Castro, Pedro M.
    Grossmann, Ignacio E.
    Veldhuizen, Patrick
    Esplin, Douglas
    [J]. AICHE JOURNAL, 2014, 60 (06) : 2083 - 2097
  • [9] Asset maintenance optimisation approaches in the chemical and process industries - A review
    Chin, Hon Huin
    Varbanov, Petar Sabev
    Klemes, Jiri Jaromir
    Benjamin, Michael Francis D.
    Tan, Raymond R.
    [J]. CHEMICAL ENGINEERING RESEARCH & DESIGN, 2020, 164 : 162 - 194
  • [10] Duffuaa S. O., 2004, Journal of Quality in Maintenance Engineering, V10, P184, DOI 10.1108/13552510410553235