Influence on construction waste of the lean-building information modelling interaction

被引:2
作者
Karatas, Ibrahim [1 ]
Budak, Abdulkadir [1 ]
机构
[1] Osmaniye Korkut Ata Univ, Dept Civil Engn, Karacaoglan Campus, Osmaniye, Turkiye
关键词
Building Information Modelling (BIM); built environment; construction; construction management; waste; waste management & disposal; BIM; VARIABILITY; PERFORMANCE; PRINCIPLES; THINKING; CRASHES;
D O I
10.1680/jensu.22.10018
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This study aims to determine which types of waste that occur during the construction phase are influenced and reduced by lean principles and building information modelling (BIM) functions. A survey study was conducted and analysed with multiple correspondence analysis. It was seen that waiting, overprocessing and overproduction wastes are reduced by lean principles. It was determined that the visualisation features of lean principles and BIM functions reduce inventory and defect production wastes. It was figured out that BIM functions reduce unnecessary transportation waste by using technologies. It is hoped that the findings of this study will help construction managers quickly determine which lean principles and/or BIM functions to be used at the construction site to reduce waste more effectively.
引用
收藏
页码:242 / 255
页数:14
相关论文
共 69 条
[1]   Application of lean manufacturing tools and techniques for waste reduction in Nigerian bricks production process [J].
Aka, Adefemi ;
Isah, Abubakar Danladi ;
Eze, Chukwudum J. ;
Timileyin, Owolabi .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (03) :658-679
[2]   Barriers to Adopting Lean Construction in the Construction Industry-The Case of Jordan [J].
Al Balkhy, Wassim ;
Sweis, Rateb ;
Lafhaj, Zoubeir .
BUILDINGS, 2021, 11 (06)
[3]  
Alpar R., 2013, Uygulamali Cok Degiskenli Istatistik Yontemler, Detay Yayincilik Dorduncu baski
[4]   Investigating conflicts of expert contractors using the last planner system in building information modeling process [J].
Amany, Adib ;
Taghizade, Katayoon ;
Noorzai, Esmatullah .
JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2020, 18 (06) :1381-1402
[5]  
Andujar-Montoya M.D., 2019, WIT T BUILT ENV, V192, P1
[6]  
[Anonymous], 2010, Multiple Correspondence Analysis
[7]  
Aravindh M.D., 2022, Asian J. Civ. Eng, V23, P741, DOI [10.1007/S42107-022-00453-9, DOI 10.1007/S42107-022-00453-9, 10.1007/s42107-022-00453-9]
[8]  
Arayici Y., 2012, Virtual Reality-Human Computer Interaction, P179, DOI DOI 10.5772/51052
[9]   A quantitative, evidence-based analysis of correlations between lean construction and building information modelling [J].
Arayici, Yusuf ;
Tokdemir, Onur Behzat ;
Kassem, Mohamad .
SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2023, 12 (05) :975-1001
[10]   The practical relationship between continuous flow and lean construction in SMEs [J].
Avelar, Wallace ;
Meirino, Marcelo ;
Tortorella, Guilherme Luiz .
TQM JOURNAL, 2020, 32 (02) :362-380