Multi-project scheduling under uncertainty and resource flexibility: a systematic literature review

被引:8
作者
Aghileh, Marzieh [1 ,3 ]
Tereso, Anabela [1 ,3 ]
Alvelos, Filipe [1 ]
Monteiro Lopes, Maria Odete [2 ]
机构
[1] Univ Minho, ALGORITMI Res Ctr, LASI, Guimaraes, Portugal
[2] Inst Politecn Viseu, Mech Engn & Ind Management Dept, Viseu, Portugal
[3] Univ Minho, ALGORITMI Res Ctr LASI, P-4800058 Guimaraes, Portugal
来源
PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL | 2024年 / 12卷 / 01期
关键词
Multi-project scheduling; resource-constrained multi-project scheduling problem (RCMPSP); uncertainty; resource flexibility; systematic literature review (SLR); PRIORITY RULES; ALGORITHM; OPTIMIZATION; MANAGEMENT; COST; TIME;
D O I
10.1080/21693277.2024.2319574
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A Systematic Literature Review (SLR) on the Resource-Constrained Multi-Project Scheduling Problem (RCMPSP), Uncertainty, and Resource Flexibility (human resource) is presented in this study. The main purpose is to help scholars with an overview of existing techniques and to identify new research directions. After applying exclusion criteria, 107 papers were analysed (2013-2023). The methodology adopted for this SRL is PRISMA. Based on the results, the approaches proposed to solve the RCMPSP were classified and the main findings were presented. The results show that the main focus of the existing research has been devoted to approximate algorithms. Genetic algorithms (GAs) and priority rules (PRs) are the most representative approximate algorithms, with 39% and 18%, respectively. At the same time, mixed integer programming (MIP) (9%) and branch & bound (B&B) algorithms (4%) are the most used exact algorithms. This analysis provides a vivid roadmap for future research based on the collected papers.
引用
收藏
页数:33
相关论文
共 120 条
[1]   Simultaneous scheduling of multiple construction projects considering supplier selection and material transportation routing [J].
Abdzadeh, Behnam ;
Noori, Siamak ;
Ghannadpour, Seyed Farid .
AUTOMATION IN CONSTRUCTION, 2022, 140
[2]   Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations [J].
Afruzi, E. Nabipoor ;
Aghaie, A. ;
Najafi, A. A. .
SCIENTIA IRANICA, 2020, 27 (01) :361-376
[3]   Optimization of time, cost and quality in critical chain method using simulated annealing [J].
Taheri Amiri M.J. ;
Haghighi F.R. ;
Eshtehardian E. ;
Abessi O. .
International Journal of Engineering, Transactions B: Applications, 2017, 30 (05) :627-635
[4]   Multi-project Time-cost Optimization in Critical Chain with Resource Constraints [J].
Amiri, Mohammad Javad Taheri ;
Haghighi, FarshidReza ;
Eshtehardian, Ehsan ;
Abessi, Ozeair .
KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (10) :3738-3752
[5]   Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem [J].
Asta, Shahriar ;
Karapetyan, Daniel ;
Kheiri, Ahmed ;
Ozcan, Ender ;
Parkes, Andrew J. .
INFORMATION SCIENCES, 2016, 373 :476-498
[6]  
Ben Issa Samer, 2021, International Journal of Production Economics, V232, P172, DOI [10.1016/j.ijpe.2020.107936, 10.1016/j.ijpe.2020.107936]
[7]   A survey in the resource-constrained project and multi-project scheduling problems [J].
Ben Issa, Samer ;
Tu, Yiliu .
JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) :117-138
[8]  
Besikci U., 2013, INT C IND ENG SYSTEM
[9]   Resource dedication problem in a multi-project environment [J].
Besikci, Umut ;
Bilge, Umit ;
Ulusoy, Gunduz .
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) :206-229
[10]   Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates [J].
Bredael, Dries ;
Vanhoucke, Mario .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 308 (01) :54-75