Optimal production run in an imperfect production process with maintenance under warranty and product insurance

被引:11
作者
Ghosh, Prasanta Kumar [1 ,4 ]
Manna, Amalesh Kumar [2 ,5 ]
Dey, Jayanta Kumar [3 ]
Kar, Samarjit [1 ]
机构
[1] Natl Inst Technol, Dept Math, Durgapur 713209, West Bengal, India
[2] Univ Burdwan, Dept Math, Burdwan 713104, India
[3] Mahishadal Raj Coll, Dept Math, Mahishadal 721628, West Bengal, India
[4] YS Palpara Mahavidyalaya, Dept Math, Purba Midnapore 721458, West Bengal, India
[5] Univ Engn & Management, Dept Basic Sci & Humanities, Kolkata 700160, West Bengal, India
关键词
Imperfect production; Reworked; Machine maintenance; Warranty; Insurance policy; PRODUCTION-INVENTORY MODEL; PRODUCTION SYSTEM; PREVENTIVE MAINTENANCE; REPLACEMENT POLICY; OPTIMAL PRICE; LENGTH; TIME; REWORK; SOLD; BREAKDOWNS;
D O I
10.1007/s12597-023-00628-1
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In the business world, product warranty and insurance plays an important role by increasing the demand of the product to maximizing the average profit or minimizing the average cost in a manufacturing system. Also, the customers' demand depends on several factors, viz. quality, selling price, payment strategies, warranty and insurance of the product. This paper develops an imperfect production inventory model with preventive machine maintenance, rework, warranty and insurance coverage on the accidentally damaged part(s) of the product. The concerned production system can randomly shift from an in-control state to an out-of-control state at any time during a production run, and the time elapsed while the production process stays in the in-control state is assumed to be exponentially distributed. The rates of producing reworkable defective items in the in-control state and out-control states are different. The demand rate of the customers is considered as the product's selling price and warranty period dependent. To attract customers and increase the demand for the product, the manufacturer offers an insurance policy on the damageable part(s) of the product within the warranty period. The main aim of this study is to find the optimal production time, selling price for the different warranty periods of the product, which maximizes the profit per unit business period. To examine the validity of the proposed model, two numerical examples are considered and solved with the help of MATHEMATICA software. Finally, the effects of warranty and insurance policies on the products are analyzed, based on the numerical examples.
引用
收藏
页码:720 / 752
页数:33
相关论文
共 53 条
  • [1] [Anonymous], 2014, J UNCERTAIN ANAL APP, DOI DOI 10.1186/2195-5468-2-9
  • [2] Multi-item imperfect production inventory model in Bi-fuzzy environments
    Bera A.K.
    Jana D.K.
    [J]. OPSEARCH, 2017, 54 (2) : 260 - 282
  • [3] Production lot sizing with process deterioration and machine breakdown under inspection schedule
    Chakraborty, Tulika
    Giri, B. C.
    Chaudhuri, K. S.
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2009, 37 (02): : 257 - 271
  • [4] Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages
    Chen, Cheng-Kang
    Lo, Chih-Chung
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 2006, 44 (3-4) : 319 - 331
  • [5] Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period
    Chen, Cheng-Kang
    Lo, Chih-Chung
    Weng, Tzu-Chun
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 259 (02) : 401 - 412
  • [6] Cheung KL, 1997, NAV RES LOG, V44, P257, DOI 10.1002/(SICI)1520-6750(199704)44:3<257::AID-NAV2>3.0.CO
  • [7] 2-7
  • [8] Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    Chiu, Singa Wang
    Wang, Shan-Ling
    Chiu, Yuan-Shyi Peter
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (02) : 664 - 676
  • [9] Studying the effect of stochastic breakdowns, overtime, and rework on inventory replenishment decision
    Chiu, Yuan-Shyi Peter
    Wu, Cheng-Sian
    Wu, Hua Yao
    Chiu, Singa Wang
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2021, 60 (01) : 1627 - 1637
  • [10] Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
    Chiu, Yuan-Shyi Peter
    Chen, Kuang-Ku
    Cheng, Feng-Tsung
    Wu, Mei-Fang
    [J]. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2010, 59 (02) : 919 - 932