Target value design: guidelines for implementation in the real estate market in Brazil

被引:1
作者
Oliva, Carolina Asensio [1 ]
Granja, Ariovaldo Denis [1 ]
Picchi, Flavio Augusto [1 ,2 ]
机构
[1] Univ Estadual Campinas UNICAMP, LAGERCON Lab Construct Management Res, Campinas, Brazil
[2] Lean Inst Brasil, Sao Paulo, Brazil
基金
巴西圣保罗研究基金会;
关键词
TVD; target value design; real estate market; adapted model; SCIENCE;
D O I
10.1080/17452007.2023.2281366
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the current construction industry scenario, several constraints - schedule, scope, cost - impact the quality of products delivered. From the clients' and users' perspectives, there is a need to incorporate innovative methods for value management in the sector. Delivering products with more added value often runs into investor restrictions and difficulties imposed by a fragmented product development process, representing obstacles to collaboration among stakeholders, especially in the real estate context. These characteristics demand a proactive design process focusesed on value delivery. One of them is Target Value Design (TVD), which has emerged as a viable solution to solve the poor performance in construction. Most TVD applications reported are cases where the owner sets the goals based on the available budget and desired functionalities. This research aims to develop a TVD model adapted for real estate projects, specifically for products with units for sale. In this context, one single company combines different roles, acting as developer and contractor and being responsible for sales to final users. The market, and not the owner, defines the target value and cost. The study was developed in Brazil, where this arrangement is very common, but can provide insights into other countries with similar characteristics. For this purpose, this research adopted the Design Science Research (DSR) strategy, which seeks to explain, describe, explore, or prescribe solutions for real-life problems. Focus Groups technique helped to develop and validate the artifact through learning cycles. As a result, the research proposes a TVD-adapted model and guidelines for implementation in the real estate market.
引用
收藏
页码:1323 / 1334
页数:12
相关论文
共 38 条
  • [1] AIA T. A. I. O. A., 2007, Integrated project delivery: A guide
  • [2] Ansari SL., 1997, Target costing: The next frontier in strategic cost management
  • [3] Ballard G, 2004, 12 ANN C INT GROUP L, P1
  • [4] Ballard G., 2011, Lean Construction Journal, P79
  • [5] Caixeta M. C. B. F., 2009, Integrated Project development, construction management, and healthcare buildings maintenance-In Portuguese, P57
  • [6] Cooper R., 1997, Target Costing and Value Engineering
  • [7] Denerolle Stephane., 2013, The application of Target Value Design to the design phase of 3 hospitals projects
  • [8] Do D., 2015, Proc. 23rd Ann. Conf. of the Intl. Group for lean construction, P277
  • [9] Do D., 2013, Target Value Design as a method for controlling project cost overruns
  • [10] Do Doanh., 2014, 22nd Annual Conference of the International Group for Lean Construction, eds, V1, P171