Determining the Safe Distance for Mining Equipment Operation When Forming an Internal Dump in a Deep Open Pit

被引:22
作者
Bazaluk, Oleg [1 ]
Anisimov, Oleh [2 ]
Saik, Pavlo [3 ]
Lozynskyi, Vasyl [3 ]
Akimov, Oleksandr [4 ]
Hrytsenko, Leonid [2 ]
机构
[1] Guangdong Univ Petrochem Technol, Belt & Rd Initiat Inst Chinese European Studies BR, Maoming 525000, Peoples R China
[2] Dnipro Univ Technol, Dept Surface Min, UA-49005 Dnipro, Ukraine
[3] Dnipro Univ Technol, Dept Min Engn & Educ, UA-49005 Dnipro, Ukraine
[4] Interreg Acad Personnel Management, UA-03039 Kiev, Ukraine
关键词
open pit; reclamation; overburden rocks; dump slope; safety factor; dragline; SENSITIVITY-ANALYSIS; GEOMECHANICAL MODEL; LAND RECLAMATION; SLOPE STABILITY; COAL-MINE; MANAGEMENT; DEPOSIT; BALANCE;
D O I
10.3390/su15075912
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In the surface mining of mineral deposits, land resources suitable for agricultural purposes are inappropriately spent in large volumes. When mining deep open pits, overburden rocks are mainly transported to the surface. The optimal solution for reducing the area of disturbed lands is the placement of overburden rocks in internal dumps in the open pit. This is especially suitable when mining a mineral deposit with several open pits where at least one of them is depleted. Therefore, it is important to assess the feasibility of building an internal dump, based on the stability parameters of its slopes and the safe distance for placing mining equipment within its boundaries, which was the focus of this research. Numerical modeling with Slide 5.0 software was used to determine the stability of the dump slope inside the open pit and the safe distance from the upper slope edge for placing mining equipment. This reflected the geomechanical situation occurring within the boundaries of the dump formed in the open-pit field with a high degree of reliability. It was determined that the maximum standard safety factor values of the open-pit slopes are within the limits when the overburden rocks border on the hard bedrock (Ks.s.f = 1.2). Under the condition where the dump slope bordered on sedimentations represented by clays, loams, and sands with a strength of 2-3 on the Mohs scale, the safety factor decreased by 22%. It was determined that the minimum safe distance from the outer contour of the dragline base to the upper edge of a single-tier dump was 15.5 m with a safety factor of 1.21. The maximum safe distance values in the range of 73.5-93 m were concentrated within the boundaries of sections 5-9, with a safety factor from 1.18 to 1.28. When the dragline was located within the boundaries of section 7, the dump construction works should be conducted only if the dump exist for up to 3 years. Based on the identified parameters, on the example of using the ESH-11/70 walking dragline, a technological scheme of its operation was developed with the allocation of safe boundaries for its placement when forming an internal dump. The results obtained are useful for the development of projects for the reclamation of depleted open pits.
引用
收藏
页数:18
相关论文
共 61 条
[1]   SLOPE STABILITY ANALYSIS OF WASTE DUMP IN SANDSTONE OPEN PIT OSIELEC [J].
Adamczyk, Justyna ;
Cala, Marek ;
Flisiak, Jerzy ;
Kolano, Malwina ;
Kowalski, Michal .
STUDIA GEOTECHNICA ET MECHANICA, 2013, 35 (01)
[2]  
Anisimov O., 2015, THEOR PRACT SOLUT MI, V1, P243, DOI [10.1201/b19901-43, DOI 10.1201/B19901-43]
[3]  
[Anonymous], 2019, E3S Web of Conferences, V123, DOI 10.1051/e3sconf/201912301004
[4]  
[Anonymous], 2007, 7302007812007 SOUN M
[5]  
Babets Yevheniy, 2021, E3S Web of Conferences, V280, DOI 10.1051/e3sconf/202128011002
[6]   Rapid and robust slope failure appraisal using aerial photogrammetry and 3D slope stability models [J].
Bar, Neil ;
Kostadinovski, Michael ;
Tucker, Michael ;
Byng, Glen ;
Rachmatullah, Rully ;
Maldonado, Arturo ;
Poetsch, Markus ;
Gaich, Andreas ;
McQuillan, Alison ;
Yacoub, Thamer .
INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2020, 30 (05) :651-658
[7]   Innovative Activities in the Sphere of Mining Process Management [J].
Bazaluk, Oleg ;
Ashcheulova, Oleksandra ;
Mamaikin, Oleksandr ;
Khorolskyi, Andrii ;
Lozynskyi, Vasyl ;
Saik, Pavlo .
FRONTIERS IN ENVIRONMENTAL SCIENCE, 2022, 10
[8]   Forecasting Underground Water Dynamics within the Technogenic Environment of a Mine Field. Case Study [J].
Bazaluk, Oleg ;
Sadovenko, Ivan ;
Zahrytsenko, Alina ;
Saik, Pavlo ;
Lozynskyi, Vasyl ;
Dychkovskyi, Roman .
SUSTAINABILITY, 2021, 13 (13)
[9]   Sustainable Underground Iron Ore Mining in Ukraine with Backfilling Worked-Out Area [J].
Bazaluk, Oleg ;
Petlovanyi, Mykhailo ;
Lozynskyi, Vasyl ;
Zubko, Serhii ;
Sai, Kateryna ;
Saik, Pavlo .
SUSTAINABILITY, 2021, 13 (02) :1-17
[10]  
Bitimbayev M., 2022, ENG J SATBAYEV U, V144, P48, DOI [10.51301/ejsu.2022.i1.08, DOI 10.51301/EJSU.2022.I1.08]