A critical review of studies on renegotiation within the public-private partnerships (PPPs) scheme

被引:11
作者
Feng, Xiaowei [1 ]
Cao, Jiming [1 ]
Wu, Guangdong [2 ]
Duan, Kaifeng [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai, Peoples R China
[2] Chongqing Univ, Sch Publ Policy & Adm, Chongqing, Peoples R China
基金
中国国家自然科学基金;
关键词
Public-Private Partnerships (PPPs); Review; Renegotiation; INCOMPLETE CONTRACTS; CONCESSION CONTRACTS; EMPIRICAL-ANALYSIS; ROAD CONCESSION; TRANSPORT PPPS; LATIN-AMERICA; INFRASTRUCTURE; FRAMEWORK; PROJECTS; MODEL;
D O I
10.1108/ECAM-09-2021-0790
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Frequent renegotiations within public-private partnership (PPP) have been recognised and affect project efficiency. Literature has focussed on diverse issues associated with renegotiation within PPP, especially in Latin America and Europe. However, a systematic summary what they have already provided appears lacking. Thus, the paper aims to conduct a critical review of publications concerning PPP renegotiation and explore the status quo, future interests and gaps in research. Design/methodology/approach This study carried out a four-phase literature review research framework to identify the quality PPP-renegotiation articles published from 2003 to 2020. Assessing the full articles for eligibility by providing a structured summary including: background; objectives; data sources; study appraisal; results; limitations; conclusions and implications of key findings. After that, filtering papers associated with PPP renegotiation in terms of the structured summary, and a total of 60 research papers were selected in the database of web of science and Scopus for review. Findings Methods adopted by researchers, research topics and theoretical foundations of PPP renegotiation research in different disciplines were identified through content analysis. Amongst the popular research topics identified were renegotiation factors, the outcomes with renegotiations, the framework to deal with renegotiations and contract design dealing with renegotiation based on rigid or flexible contracts. Originality/value This study contributes to the current body of PPP knowledge by revealing the research trend in the past 20 years. It also points out the directions that the renegotiations of PPP research may go towards in the future. Moreover, this study is very valuable in understanding how governments and concessionaires effectively handle renegotiations.
引用
收藏
页码:3674 / 3695
页数:22
相关论文
共 67 条
[1]   Winners and losers in tolled motorway renegotiations: an empirical evaluation of the Spanish pioneers [J].
Albalate, Daniel ;
Bel-Pinana, Paula .
PUBLIC MONEY & MANAGEMENT, 2016, 36 (05) :365-372
[2]   Renegotiations of Water Concessions: Empirical Analysis of Main Determinants [J].
Andrade, Isabel ;
Cruz, Carlos Oliveira ;
Sarmento, Joaquim Miranda .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2018, 144 (11)
[3]  
Athias L., 2007, Theory and Evidence from Infrastructure Concession Contracts
[4]   Are public private partnerships that rigid? And why? Evidence from price provisions in French toll road concession contracts [J].
Athias, Laure ;
Saussier, Stephane .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2018, 111 :174-186
[5]   PPP Renegotiation Framework based on Equivalent NPV Constraint in the Case of BOT Project: Incheon Airport Highway, South Korea [J].
Bae, Deog Sang ;
Damnjanoic, Ivan ;
Kang, Dong Hun .
KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (04) :1473-1483
[6]   Trust in megaprojects: A comprehensive literature review of research trends [J].
Ceric, Anita ;
Vukomanovic, Mladen ;
Ivic, Ivona ;
Kolaric, Sonja .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2021, 39 (04) :325-338
[7]   THE ANALYSIS OF BOT STRATEGIES BASED ON GAME THEORY - CASE STUDY ON TAIWAN'S HIGH SPEED RAILWAY PROJECT [J].
Chen, Tien-Chien ;
Lin, Yu-Cheng ;
Wang, Lung-Chuang .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (05) :662-674
[8]   PRETIA EX MACHINA - PRICES AND PROCESS IN LONG-TERM-CONTRACTS [J].
CROCKER, KJ ;
MASTEN, SE .
JOURNAL OF LAW & ECONOMICS, 1991, 34 (01) :69-99
[9]   THE EFFICIENCY OF INCOMPLETE CONTRACTS - AN EMPIRICAL-ANALYSIS OF AIR-FORCE ENGINE PROCUREMENT [J].
CROCKER, KJ ;
REYNOLDS, KJ .
RAND JOURNAL OF ECONOMICS, 1993, 24 (01) :126-146
[10]   Exogenous Determinants for Renegotiating Public Infrastructure Concessions: Evidence from Portugal [J].
Cruz, Carlos Oliveira ;
Marques, Rui Cunha .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (09) :1082-1090