Scheduling jobs with general linear deterioration to minimize total weighted number of late jobs

被引:5
作者
Feng, Yifu [1 ]
Geng, Xin-Na [2 ]
Lv, Dan-Yang [2 ]
Wang, Ji-Bo [2 ]
机构
[1] Anqing Med Coll, Anqing, Anhui, Peoples R China
[2] Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China
关键词
Scheduling; Branch-and-bound algorithm; Total weighted number of late jobs; Deteriorating job; DEPENDENT PROCESSING TIMES; RESOURCE-ALLOCATION; TARDY JOBS;
D O I
10.1007/s11590-023-02039-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper deals with a single-machine scheduling problem with a general linear deterioration effect. The goal is to determine the job schedule such that the total weighted number of late jobs is minimized. We present three properties, one heuristic algorithm and a lower bound to speed up the search process of the branch-and-bound algorithm. In addition, some complex heuristics (including tabu search and simulated annealing algorithms) are proposed as solutions to this problem. The computational results show that the proposed algorithms are effective and efficient.
引用
收藏
页码:1217 / 1235
页数:19
相关论文
共 48 条
  • [31] Permutation flowshop scheduling with simple linear deterioration
    Sun, Lin-Hui
    Ge, Chen-Chen
    Zhang, Wei
    Wang, Ji-Bo
    Lu, Yuan-Yuan
    [J]. ENGINEERING OPTIMIZATION, 2019, 51 (08) : 1281 - 1300
  • [32] Optimization of scheduling problems with deterioration effects and an optional maintenance activity
    Sun, Xinyu
    Liu, Tao
    Geng, Xin-Na
    Hu, Yang
    Xu, Jing-Xiao
    [J]. JOURNAL OF SCHEDULING, 2023, 26 (03) : 251 - 266
  • [33] Single-machine scheduling with deteriorating effects and machine maintenance
    Sun, Xinyu
    Geng, Xin-Na
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 3186 - 3199
  • [34] Approaches to Solving Scheduling with Due-Window Assignment and Deterioration Effects
    Teng, Fei
    Luo, Si-Wen
    Lv, Dan-Yang
    Wang, Ji-Bo
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (02)
  • [35] Heuristic and exact algorithms for single-machine scheduling problems with general truncated learning effects
    Wang, Ji-Bo
    Zhang, Li-Han
    Lv, Zheng-Guo
    Lv, Dan-Yang
    Geng, Xin-Na
    Sun, Xinyu
    [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2022, 41 (08)
  • [36] RESOURCE ALLOCATION SCHEDULING WITH DETERIORATING JOBS AND POSITION-DEPENDENT WORKLOADS
    Wang, Ji-Bo
    Lv, Dan-Yang
    Wang, Shi-Yun
    Jiang, Chong
    [J]. JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2023, 19 (03) : 1658 - 1669
  • [37] Group scheduling with deteriorating jobs and allotted resource under limited resource availability constraint
    Wang, Ji-Bo
    Liang, Xi-Xi
    [J]. ENGINEERING OPTIMIZATION, 2019, 51 (02) : 231 - 246
  • [38] Research on m-machine flow shop scheduling with truncated learning effects
    Wang, Ji-Bo
    Liu, Feng
    Wang, Jian-Jun
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2019, 26 (03) : 1135 - 1151
  • [39] Single-machine scheduling problems with precedence constraints and simple linear deterioration
    Wang, Ji-Bo
    Wang, Jian-Jun
    [J]. APPLIED MATHEMATICAL MODELLING, 2015, 39 (3-4) : 1172 - 1182
  • [40] Single machine group scheduling with time dependent processing times and ready times
    Wang, Ji-Bo
    Wang, Jian-Jun
    [J]. INFORMATION SCIENCES, 2014, 275 : 226 - 231