Scheduling jobs with general linear deterioration to minimize total weighted number of late jobs

被引:5
作者
Feng, Yifu [1 ]
Geng, Xin-Na [2 ]
Lv, Dan-Yang [2 ]
Wang, Ji-Bo [2 ]
机构
[1] Anqing Med Coll, Anqing, Anhui, Peoples R China
[2] Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China
关键词
Scheduling; Branch-and-bound algorithm; Total weighted number of late jobs; Deteriorating job; DEPENDENT PROCESSING TIMES; RESOURCE-ALLOCATION; TARDY JOBS;
D O I
10.1007/s11590-023-02039-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper deals with a single-machine scheduling problem with a general linear deterioration effect. The goal is to determine the job schedule such that the total weighted number of late jobs is minimized. We present three properties, one heuristic algorithm and a lower bound to speed up the search process of the branch-and-bound algorithm. In addition, some complex heuristics (including tabu search and simulated annealing algorithms) are proposed as solutions to this problem. The computational results show that the proposed algorithms are effective and efficient.
引用
收藏
页码:1217 / 1235
页数:19
相关论文
共 48 条
  • [11] Common Due Window Assignment Scheduling with Proportional Linear Deterioration Effects
    Huang, Xue
    Yin, Na
    Liu, Wei-Wei
    Wang, Ji-Bo
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2020, 37 (01)
  • [12] Bicriterion scheduling with group technology and deterioration effect
    Huang, Xue
    [J]. JOURNAL OF APPLIED MATHEMATICS AND COMPUTING, 2019, 60 (1-2) : 455 - 464
  • [13] Scheduling linear deteriorating jobs to minimize the number of tardy jobs
    Jafari, Abbasali
    Moslehi, Ghasem
    [J]. JOURNAL OF GLOBAL OPTIMIZATION, 2012, 54 (02) : 389 - 404
  • [14] Single-machine common flow allowance scheduling with aging effect, resource allocation, and a rate-modifying activity
    Ji, Min
    Yao, Danli
    Yang, Qinyun
    Cheng, T. C. E.
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2015, 22 (06) : 997 - 1015
  • [15] Slack Due-Window Assignment Scheduling Problem with Deterioration Effects and a Deteriorating Maintenance Activity
    Jia, Xue
    Lv, Dan-Yang
    Hu, Yang
    Wang, Ji-Bo
    Wang, Zhi
    Wang, Ershen
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2022, 39 (06)
  • [16] Karp Richard M., 1972, InComplexity of Computer Computations, P85, DOI DOI 10.1007/978-1-4684-2001-2_9
  • [17] OPTIMIZATION BY SIMULATED ANNEALING
    KIRKPATRICK, S
    GELATT, CD
    VECCHI, MP
    [J]. SCIENCE, 1983, 220 (4598) : 671 - 680
  • [18] Parallel-batching scheduling of deteriorating jobs with non-identical sizes and rejection on a single machine
    Kong, Min
    Liu, Xinbao
    Pei, Jun
    Zhou, Zhiping
    Pardalos, Panos M.
    [J]. OPTIMIZATION LETTERS, 2020, 14 (04) : 857 - 871
  • [19] A Truncated Sum of Processing-Times-Based Learning Model for a Two-Machine Flowshop Scheduling Problem
    Lai, Kunjung
    Hsu, Peng-Hsiang
    Ting, Ping-Ho
    Wu, Chin-Chia
    [J]. HUMAN FACTORS AND ERGONOMICS IN MANUFACTURING & SERVICE INDUSTRIES, 2014, 24 (02) : 152 - 160
  • [20] FUNCTIONAL EQUATION AND ITS APPLICATION TO RESOURCE ALLOCATION AND SEQUENCING PROBLEMS
    LAWLER, EL
    MOORE, JM
    [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1969, 16 (01): : 77 - 84