A hybrid metaheuristic method for solving resource constrained project scheduling problem

被引:10
|
作者
Shuvo, Ohiduzzaman [1 ]
Golder, Swajan [1 ]
Islam, Md Rafiqul [1 ]
机构
[1] Khulna Univ, Comp Sci & Engn Discipline, Khulna 9208, Bangladesh
关键词
Chemical reaction optimization; NP-hard; Resource constrained project scheduling problem; Makespan; CHEMICAL-REACTION OPTIMIZATION; PARTICLE SWARM OPTIMIZATION; ALGORITHM; FORMULATION;
D O I
10.1007/s12065-021-00675-x
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Resource constrained project scheduling problem (RCPSP) is a renowned variant of the scheduling problem. RCPSP is very important in production and management but computationally hard. It is widely used in many fields like job shop scheduling, flow shop scheduling, transactional planning, wireless communication etc. The objective of solving RCPSP is to obtain minimum makespan maintaining all constraints. There are some exact, approximate, heuristic and metaheuristic algorithms which were proposed to solve this problem. RCPSP is an NP-hard problem. Chemical reaction optimization (CRO) is a population based metaheuristic method to solve such problems and it shows better performance comparing with some other existing algorithms. CRO explores the large search space both locally and globally using its four operators. Genetic algorithm (GA) is also a nature inspired algorithm which is used to solve various optimization problems. In this paper, we are proposing a hybrid metaheuristic approach that integrates chemical reaction optimization (CRO) and genetic algorithm (GA) named CRO-GA to solve RCPSP. We have redesigned the basic operators of CRO and GA to find out the solutions. An additional operator called priority based selection operator is used in CRO to adjust with GA. Our proposed method is compared with other related approaches such as adaptive particle swarm optimization (A-PSO), multi agent optimization algorithm (MAOA), artificial bee colony (ABC), genetic algorithm (GA) which are state of the art for the RCPSP. The experimental results show that our proposed methodology gives better results than other existing algorithms to solve RCPSP with less computational time.
引用
收藏
页码:519 / 537
页数:19
相关论文
共 50 条
  • [41] Solving the resource-constrained multi-project scheduling problem with an improved critical chain method
    Tian, Min
    Liu, Ren Jing
    Zhang, Guang Jun
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2020, 71 (08) : 1243 - 1258
  • [42] A HYBRID METAHEURISTIC FOR SOLVING SINGLE MACHINE SCHEDULING PROBLEM
    Serbencu, Adrian
    Minzu, Viorel
    Cernega, Daniela
    Serbencu, Adriana
    ICINCO 2009: PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 1: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2009, : 68 - 74
  • [43] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
    Paweł B. Myszkowski
    Marek E. Skowroński
    Łukasz P. Olech
    Krzysztof Oślizło
    Soft Computing, 2015, 19 : 3599 - 3619
  • [44] Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem
    Zhang, Lieping
    Luo, Yingxiong
    Zhang, Yu
    JOURNAL OF CONTROL SCIENCE AND ENGINEERING, 2015, 2015
  • [45] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Olech, Lukasz P.
    Oslizlo, Krzysztof
    SOFT COMPUTING, 2015, 19 (12) : 3599 - 3619
  • [46] Using Metaheuristic for Solving the Resource-Constrained Deliveryman Problem
    Ha-Bang Ban
    Duc-Nghia Nguyen
    SOICT 2019: PROCEEDINGS OF THE TENTH INTERNATIONAL SYMPOSIUM ON INFORMATION AND COMMUNICATION TECHNOLOGY, 2019, : 63 - 68
  • [47] An Effective Hybrid Algorithm Based on Particle Swarm Optimization with Migration Method for Solving the Multiskill Resource-Constrained Project Scheduling Problem
    Quoc, Huu Dang
    The, Loc Nguyen
    Doan, Cuong Nguyen
    APPLIED COMPUTATIONAL INTELLIGENCE AND SOFT COMPUTING, 2022, 2022
  • [48] Solving resource-constrained construction scheduling problems with overlaps by metaheuristic
    Bozejko, Wojciech
    Hejducki, Zdzislaw
    Uchronski, Mariusz
    Wodecki, Mieczyslaw
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (05) : 649 - 659
  • [49] A dynamic resource constrained project scheduling problem
    Villela da Silva, Andre Renato
    Ochi, Luiz Satoru
    INTERNATIONAL JOURNAL OF DATA MINING MODELLING AND MANAGEMENT, 2013, 5 (04) : 370 - 379
  • [50] A New Resource Constrained Project Scheduling Problem
    Liu, Xiaoxiang
    Jiang, Weigang
    Xie, Jianwen
    Jia, Yitian
    2009 ASIA-PACIFIC CONFERENCE ON INFORMATION PROCESSING (APCIP 2009), VOL 1, PROCEEDINGS, 2009, : 476 - +