Mechanism and Control of Asymmetric Floor Heave in the Gob-Side Coal Roadway under Mining Pressure in Extra-Thick Coal Seams

被引:3
|
作者
Wang, Deqiu [1 ]
Zheng, Yun [2 ]
He, Fulian [1 ]
Song, Jiayu [1 ]
Zhang, Jianlong [1 ]
Wu, Yanhao [1 ]
Jia, Pengpeng [1 ]
Wang, Xiaohui [1 ]
Liu, Baoping [1 ]
Wang, Feifei [1 ]
Zhang, Yajiang [1 ]
Tao, Kai [1 ]
机构
[1] China Univ Min & Technol Beijing, Sch Energy & Min Engn, Beijing 100083, Peoples R China
[2] North China Inst Sci & Technol, Sch Safety Engn, Langfang 065201, Peoples R China
基金
中国国家自然科学基金;
关键词
mining pressures; gob-side coal roadway; asymmetric floor heave; failure mechanism; cooperative control; FACE; LONGWALL;
D O I
10.3390/en16134948
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Due to their tense mining succession relationship, gob-side roadways may undergo significant deformation under multi-mining pressure. In this article, many methods, such as on-site research, a theoretical analysis, a numerical simulation and an industrial experiment, are used to research the mechanism of asymmetric floor heave in a gob-side coal roadway affected by mining pressure during the mining of extra-thick coal seams. Our main research is as follows: (1) By monitoring the floor deformation in the roadway on site, it is concluded that the roadway floor shows asymmetry, indicating that the floor displacement near the coal pillar side is relatively large. (2) Based on a lateral overburden structure model of the roadway, the calculation formulas of the horizontal vertical stress caused by the roadway excavation and the excavation of the upper working face are derived separately, and the vertical stress coupling curves on both sides of the roadway during the mining of the upper working face are obtained through a numerical simulation. It is concluded that the cause of the asymmetric floor heave in the roadway is an uneven distribution of vertical stress. (3) The numerical simulation shows a symmetrical distribution of the floor displacement curve during the roadway excavation with a max. displacement of 49.5 mm. The floor displacement curve during the mining of the upper working face is asymmetric with a max. displacement of 873 mm at a distance of 1 m from the central axis near the coal pillar side. The range of the plastic zone in the roadway gradually expands with the mining of the upper working face, and the maximum depth of floor failure is 5.5 m. (4) According to the cooperative control principle of "roof + two sides + floor", an asymmetric floor heave joint control scheme of "floor leveling + anchor cable support + concrete hardening" is proposed. The floor deformation monitoring results indicate that the max. floor heave at the measurement point near the coal pillar in the roadway is 167 mm, and the floor heave is effectively controlled.
引用
收藏
页数:19
相关论文
共 50 条
  • [31] A case study of floor failure characteristics under fully mechanised caving mining conditions in extra-thick coal seams
    Zhang, Pingsong
    Ou, Yuanchao
    Sun, Binyang
    Liu, Chang
    JOURNAL OF GEOPHYSICS AND ENGINEERING, 2020, 17 (05) : 813 - 826
  • [32] Research on mechanism and control of asymmetric deformation of gob side coal roadway with fully mechanized caving mining
    Xu, Xuhui
    He, Fulian
    Li, Xiaobin
    He, Wenrui
    ENGINEERING FAILURE ANALYSIS, 2021, 120
  • [33] Mechanism and Control Methods of Roof Deformations in Gob-Side Entry Retention by Roof Cutting Under Medium-Thick Coal Seams
    Yang, Xiaojie
    Mao, Wenbin
    Wang, Eryu
    Sun, Yue
    Wang, Jiamin
    He, Manchao
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (01) : 265 - 282
  • [34] Mechanism and Control Methods of Roof Deformations in Gob-Side Entry Retention by Roof Cutting Under Medium-Thick Coal Seams
    Xiaojie Yang
    Wenbin Mao
    Eryu Wang
    Yue Sun
    Jiamin Wang
    Manchao He
    Geotechnical and Geological Engineering, 2020, 38 : 265 - 282
  • [35] Surrounding rock control mechanism and its application of gob-side driving entry in extra thick coal seam
    Faculty of Resource & Safety Engineering, China University of Mining & Technology , Beijing
    100083, China
    不详
    100083, China
    不详
    037003, China
    Meitan Xuebao, 4 (825-832):
  • [36] Gob-side entry driving with small-coal-pillar for Carboniferous extra thick coal seam under Jurassic coal pillar
    Hongfei Duan
    Lijuan Zhao
    Arabian Journal of Geosciences, 2022, 15 (10)
  • [37] Mechanical analysis of floor deformation and floor heave control technology for gob-side entry retaining in medium thick coal seam with shallow cover depth
    Yan, Chaochao
    Zhang, Guoen
    Chang, Tong
    Wang, Pengfei
    Wang, Tianping
    Wu, Changquan
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2024, 52 (10): : 11 - 20
  • [38] Disastrous Mechanism of Water Discharge in Abandoned Gob above the Stope in Mining Extra-Thick Coal Seam
    Lin, Haixiao
    Yang, Feng
    Cao, Zhengzheng
    Wang, Yue
    Jiao, Xiaojian
    GEOFLUIDS, 2021, 2021
  • [39] Effect of mining parameters on surface deformation and coal pillar stability under customized shortwall mining of deep extra-thick coal seams
    Jiang, Shuyin
    Fan, Gangwei
    Li, Qizhen
    Zhang, Shizhong
    Chen, Liang
    ENERGY REPORTS, 2021, 7 : 2138 - 2154
  • [40] Study on surrounding rock failure mechanism and rational coal pillar width of the gob-side coal roadway under influence of intense dynamic pressure
    Wang, Deqiu
    He, Fulian
    Wu, Yanhao
    Xu, Xuhui
    Zhang, Jianlong
    Lv, Kai
    Li, Liang
    Zhai, Wenli
    Song, Jiayu
    ENERGY SCIENCE & ENGINEERING, 2023, 11 (05) : 1716 - 1733