Complexity-based risk decision framework for cost overrun using fuzzy Bayesian network

被引:1
作者
Afzal, Farman [1 ]
Afzal, Fahim [2 ]
Junaid, Danish [3 ]
Shah, Imran Ahmed [4 ]
Yunfei, Shao [5 ]
机构
[1] Univ Engn & Technol, Inst Business & Management, Lahore, Pakistan
[2] Hohai Univ, Business Sch, Nanjing, Peoples R China
[3] Bahria Univ, Bahria Business Sch, Islamabad, Pakistan
[4] Abdul Latif Univ, Dept Business Adm Shah, Khairpur, Pakistan
[5] Univ Elect Sci & Technol China, Sch Management & Econ, Chengdu, Peoples R China
基金
中国国家自然科学基金;
关键词
Risk assessment; Cost overrun; Complexity-risk interdependency; Fuzzy logic; Bayesian network; Construction projects; PROCESS MODEL; TRANSPORT INFRASTRUCTURE; CONSTRUCTION PROJECT; DELAY; MANAGEMENT; KNOWLEDGE; SAFETY; AHP; PRIORITIZATION; PERFORMANCE;
D O I
10.1007/s00500-023-07983-7
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This study adheres to find important complexity-risk interdependent causes of cost overrun in infrastructure transport projects rather considering an independent state of project risk. Aiming for addressing cost overrun problem to facilitate decision-makers, a hierarchical breakdown structure of complex elements and complexity-driven risk factors at different levels of severity is conceptualized along with their interdependency network of key relationships. In this work, an integrated approach of fuzzy logic with the Bayesian belief network is employed for cost-risk assessment while assuming linguistic scales of likelihood and consequences parameters. The simulated results of cost-risk decision framework imply that poor design issues, increase in material prices and delay in relocating facilities show higher complexity-risk dependency and increase the risk of cost overrun in complex projects. This study contributes to the body of knowledge by providing a practical hybrid risk decision framework to identify and evaluate the key complexity-risk interdependencies in underline relations to the cost overrun problem in construction.
引用
收藏
页码:6187 / 6203
页数:17
相关论文
共 50 条
  • [1] Complexity-based risk decision framework for cost overrun using fuzzy Bayesian network
    Farman Afzal
    Fahim Afzal
    Danish Junaid
    Imran Ahmed Shah
    Shao Yunfei
    Soft Computing, 2023, 27 : 6187 - 6203
  • [2] Cost-risk contingency framework for managing cost overrun in metropolitan projects: using fuzzy-AHP and simulation
    Afzal, Farman
    Shao, Yunfei
    Junaid, Danish
    Hanif, Muhammad Shehzad
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2020, 13 (05) : 1121 - 1139
  • [3] A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies Cost overrun in construction projects
    Afzal, Farman
    Shao Yunfei
    Nazir, Mubasher
    Bhatti, Saad Mahmood
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2021, 14 (02) : 300 - 328
  • [4] Cost Overrun Risk Assessment for Healthcare Projects: A Modified Fuzzy Group Decision-Making Approach
    Islam, Muhammad Saiful
    Salem, Mohamed
    Tantawy, Mohamed
    Salah, Mohamed
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (12)
  • [5] Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach
    Ashtari, Mohammad Amin
    Ansari, Ramin
    Hassannayebi, Erfan
    Jeong, Jaewook
    BUILDINGS, 2022, 12 (10)
  • [6] Modified Fuzzy Group Decision-Making Approach to Cost Overrun Risk Assessment of Power Plant Projects
    Islam, Muhammad Saiful
    Nepal, Madhav P.
    Skitmore, Martin
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (02)
  • [7] Risk assessment of cost overrun using fuzzy logic model
    Alekhya, G. B. S.
    Shashikanth, K.
    Prasad, M. Anjaneya
    MATERIALS TODAY-PROCEEDINGS, 2022, 62 : 1803 - 1810
  • [8] Revolutionizing steel building project cost overrun risk assessment by Bayesian network
    Leu, Sou-Sen
    Huang, Kuang-Jen
    Hung, Cathy Chang-Wei
    Wu, Pei-Lin
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (12) : 4975 - 4987
  • [9] Fuzzy Logic Based Determination of Cost Overrun of Hydro Power Plant
    Shaktawat, Anuja
    Vadhera, Shelly
    2016 INTERNATIONAL CONFERENCE ON ELECTRICAL POWER AND ENERGY SYSTEMS (ICEPES), 2016, : 301 - 304
  • [10] Dynamic-Bayesian-Network-Based Project Cost Overrun Prediction Model
    Leu, Sou-Sen
    Lu, Cheng-Yu
    Wu, Pei-Lin
    SUSTAINABILITY, 2023, 15 (05)