Weighted Multi-Skill Resource Constrained Project Scheduling: A Greedy and Parallel Scheduling Approach

被引:3
作者
Akbar, Saeed [1 ]
Zubair, Muhammad [2 ]
Khan, Rizwan [1 ]
Ul Akbar, Ubaid [3 ]
Ullah, Rahmat [4 ]
Zheng, Zhonglong [1 ]
机构
[1] Zhejiang Normal Univ, Sch Comp Sci & Technol, Jinhua 321004, Peoples R China
[2] Lahore Garrison Univ, Dept Software Engn, Lahore 54000, Pakistan
[3] City Univ Sci & Informat Technol, Dept Comp Sci, Peshawar 44050, Pakistan
[4] Univ Essex, Sch Comp Sci & Elect Engn, Colchester CO4 3SQ, England
关键词
Task analysis; Global Positioning System; Job shop scheduling; Costs; Resource management; Software; Project management; Greedy and parallel scheduling; heterogeneous skill proficiency; parallel scheduling scheme; project scheduling; resource assignment; weighted multi-skilled resources; ALGORITHM;
D O I
10.1109/ACCESS.2024.3350440
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This study addresses the Weighted Multi-Skill Resource Constrained Project Scheduling Problem (W-MSRCSPSP) with the aim of minimizing software project makespan. Unlike previous works, our investigation regards heterogeneous resources characterized by varying skill proficiency levels. Another major problem with existing methodologies is the potential underutilization of human resources due to varying task durations. This work introduces an innovative scheduling approach known as the Greedy and Parallel Scheduling (GPS) algorithm to handle the said issues. GPS focuses on assigning the most suitable resources available to project activities at each scheduling point. The fundamental goal of our proposed approach is to reduce resource wastage while efficiently allocating surplus resources, if any, to project tasks, ultimately leading to a decrease in the makespan. To empirically evaluate the efficacy of the GPS algorithm, we conduct a comparative analysis against the Parallel Scheduling Scheme (PSS). The advantage of our proposed approach lies in its ability to optimize the utilization of available resources, resulting in accelerated project completion. Results from extensive simulations substantiate this claim, demonstrating that the GPS scheme outperforms the PSS approach in minimizing project duration.
引用
收藏
页码:29824 / 29836
页数:13
相关论文
共 50 条
  • [31] Program Scheduling With Multi-Skill and External Resource Coordination Consideration Using Improved NSGA-II: Case Study
    Zhang, Heng
    Zhou, Jingbo
    Ruan, Huaying
    Qin, Yixuan
    IEEE ACCESS, 2024, 12 : 177491 - 177503
  • [32] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [33] Reinforcement learning-based algorithm for multi-skill project scheduling problem
    Hu Z.-T.
    Cui N.-F.
    Hu X.-J.
    Lei X.-Q.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2024, 41 (03): : 502 - 511
  • [34] A branch-and-bound method for solving multi-skill project scheduling problem
    Bellenguez-Morineau, Odile
    Neron, Emmanuel
    RAIRO-OPERATIONS RESEARCH, 2007, 41 (02) : 155 - 170
  • [35] A Multi-objective Model for Multi-skill Project Scheduling Problem considering Perform Efficiency
    Zhu, Chong
    Xue, Yuan
    He, Zhijie
    Bao, Zhenqiang
    Zhang, Zhaoyue
    Hu, Kaixuan
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 719 - 724
  • [36] A matheuristic approach to the multi-mode resource constrained project scheduling problem
    Fernandes, Gustavo Alves
    de Souza, Sergio Ricardo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 162
  • [37] An improved MIP-based approach for a multi-skill workforce scheduling problem
    Firat, Murat
    Hurkens, C. A. J.
    JOURNAL OF SCHEDULING, 2012, 15 (03) : 363 - 380
  • [38] Resource Constrained Multi-project Scheduling: Application in Software Company
    Kurt, Pelin Akyil
    Kececi, Baris
    ADVANCES IN MANUFACTURING, PRODUCTION MANAGEMENT AND PROCESS CONTROL, 2019, 793 : 549 - 557
  • [39] An improved MIP-based approach for a multi-skill workforce scheduling problem
    Murat Fırat
    C. A. J. Hurkens
    Journal of Scheduling, 2012, 15 : 363 - 380
  • [40] The impact of fixed and variable costs in a multi-skill project scheduling problem: An empirical study
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 72 : 230 - 238