Risk response decisions for projects in project portfolios considering objective adjustments and project interdependencies

被引:5
作者
Zhang, Xu [1 ]
Goh, Mark [2 ,3 ]
Bai, Sijun [1 ]
Wang, Zonghan [1 ]
机构
[1] Northwestern Polytech Univ, Sch Management, Xian, Peoples R China
[2] Natl Univ Singapore, NUS Business Sch, Singapore, Singapore
[3] Natl Univ Singapore, Logist Inst Asia Pacific, Singapore, Singapore
关键词
Risk response decisions; Project interdependencies; SZFUCOM; QFD; OPTIMIZATION METHOD; FUZZY-QFD; SELECTION; STRATEGIES; MANAGEMENT; SUCCESS; DESIGN; METHODOLOGY; UNCERTAINTY; GOVERNANCE;
D O I
10.1108/K-09-2022-1344
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
PurposeRisk response decisions (RRDs) are vital for project risk mitigation. Although past research has focused on RRDs for independent single projects, it has scarcely explored how to make RRDs for single projects in project portfolios (SPPPs). Consequently, this study aims to bridge the gap in extant literature by developing an integrated approach to select risk response strategies (RRSs) for SPPPs considering objective adjustments and project interdependencies (PIs).Design/methodology/approachAn integrated quality function deployment (QFD) method was used throughout this study. More so, a balanced score card (BSC) and stratified-Z-numbers-full consistency method (SZFUCOM) was applied to identify SPPP success criteria (SP3SC) to determine their weights. In addition, a spherical fuzzy set-design structure matrix (SFDSM) was used to quantify the correlation between the risks and the relationship between the risks and the predecessor projects. Consequently, the relationships between the risks and SP3SC and RRSs were described by the spherical fuzzy set (SFS) and Z-numbers, respectively. Besides, the results are weaved into QFD to transform SP3SC into risks and then into RRSs, while a linear optimization model is used to obtain the optimal RRSs. Lastly, a construction project portfolio (PP) was used to test the veracity of the results to prove their validity.FindingsThe approach to RRDs for single projects is observed to be different from that of SPPPs. In addition, this study finds that project portfolio objective adjustments (PPOAs) and PIs have significant impacts on RRDs given that they influence the risk priorities of independent single projects and SPPPs. Moreover, the application of an integrated QFD effectively synthesized the results from the findings of this study, as well as enabled companies to determine robust RRSs. Finally, the consistency results of the SZFUCOM were better than those of the triangular fuzzy number-full consistency method.Originality/valueThe study innovatively explores the method of RRDs for SPPP, which has been ignored by past research. SP3SC highly compatible with PP success is determined. Z-numbers are first used to evaluate the effect of RRSs to enhance the robustness of RRDs. The study proposes a method of RRDs comprehensively considering PPOAs and PIs, which provides robust methodological guidance for SPPP managers to control risks.
引用
收藏
页码:2217 / 2246
页数:30
相关论文
共 50 条
  • [21] Project Portfolio Risk Identification and Analysis, Considering Project Risk Interactions and Using Bayesian Networks
    Ghasemi, Foroogh
    Sari, Mohammad Hossein Mahmoudi
    Yousefi, Vahidreza
    Falsafi, Reza
    Tamosaitiene, Jolanta
    SUSTAINABILITY, 2018, 10 (05)
  • [22] Towards a comprehensive framework for risk assessment of organizational development project portfolios
    Mican, Camilo
    Fernandes, Gabriela
    Araujo, Madalena
    IJISPM-INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND PROJECT MANAGEMENT, 2024, 12 (03):
  • [23] Analysis of project complexity factors and their interdependencies in metro rail projects
    Sruthilaya, Dara
    Vilventhan, Aneetha
    Gopal, P. R. C.
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2024, 14 (02) : 260 - 277
  • [24] New Methodology for Transportation Investment Decisions with Consideration of Project Interdependencies
    Li, Zongzhi
    Kaul, Hemanshu
    Kapoor, Sanjiv
    Veliou, Eirini
    Zhou, Bei
    Lee, Sang Hyuk
    TRANSPORTATION RESEARCH RECORD, 2012, (2285) : 36 - 46
  • [25] Risk Management in Project Portfolios Is More Than Managing Project Risks: A Contingency Perspective on Risk Management
    Teller, Juliane
    Kock, Alexander
    Gemuenden, Hans Georg
    PROJECT MANAGEMENT JOURNAL, 2014, 45 (04) : 67 - 80
  • [26] Improved simulated annealing based risk interaction network model for project risk response decisions
    Wang, Lei
    Goh, Mark
    Ding, Ronggui
    Pretorius, Leon
    DECISION SUPPORT SYSTEMS, 2019, 122
  • [27] Modeling and analyzing project interdependencies in project portfolios using an integrated social network analysis-fuzzy TOPSIS MICMAC approach
    Helal Al Zaabi
    Hamdi Bashir
    International Journal of System Assurance Engineering and Management, 2020, 11 : 1083 - 1106
  • [28] Project Portfolio Resource Risk Assessment considering Project Interdependency by the Fuzzy Bayesian Network
    Bai, Libiao
    Zhang, Kaimin
    Shi, Huijing
    An, Min
    Han, Xiao
    COMPLEXITY, 2020, 2020
  • [29] Project risk assessment: A holistic risk identification, analysis and evaluation approach, The case of EPC projects
    Bachari, Mohammad Senisel
    Iranfar, Mahdi
    JOURNAL OF PROJECT MANAGEMENT, 2025, 10 (02) : 283 - 300
  • [30] Application of reinforcement learning for integrating project risk analysis and risk response planning: A case study on construction projects
    Soltan, Sajad
    Ashrafi, Maryam
    JOURNAL OF PROJECT MANAGEMENT, 2025, 10 (01) : 71 - 86