Case study on barriers to building information modelling implementation in Malaysia
被引:4
作者:
Munianday, Praveena
论文数: 0引用数: 0
h-index: 0
机构:
Univ Sains Malaysia, Sch Housing Bldg & Planning, George Town, MalaysiaUniv Sains Malaysia, Sch Housing Bldg & Planning, George Town, Malaysia
Munianday, Praveena
[1
]
Rahman, Rahimi A.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Malaysia Pahang, Fac Civil Engn Technol, Gambang, Malaysia
Daffodil Int Univ, Gen Educ Dept, Dhaka, BangladeshUniv Sains Malaysia, Sch Housing Bldg & Planning, George Town, Malaysia
Rahman, Rahimi A.
[2
,3
]
Esa, Muneera
论文数: 0引用数: 0
h-index: 0
机构:
Univ Sains Malaysia, Sch Housing Bldg & Planning, George Town, MalaysiaUniv Sains Malaysia, Sch Housing Bldg & Planning, George Town, Malaysia
Esa, Muneera
[1
]
机构:
[1] Univ Sains Malaysia, Sch Housing Bldg & Planning, George Town, Malaysia
[2] Univ Malaysia Pahang, Fac Civil Engn Technol, Gambang, Malaysia
[3] Daffodil Int Univ, Gen Educ Dept, Dhaka, Bangladesh
Construction industry;
Barriers;
Malaysia;
Case study;
Challenges;
Building information modelling (BIM);
BIM IMPLEMENTATION;
CONSTRUCTION;
ADOPTION;
D O I:
10.1108/JFM-10-2021-0132
中图分类号:
C93 [管理学];
学科分类号:
12 ;
1201 ;
1202 ;
120202 ;
摘要:
PurposeThere is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology's general advantages, disadvantages, issues and limitations. In addition, research on actual BIM projects that have integrated BIM throughout the project is necessary to increase the current low number of BIM users in Malaysia. Consequently, the purpose of this study is to examine the challenges BIM adopters experience while implementing BIM in their projects and how they overcome them. Design/methodology/approachAn in-depth interview session was used to collect data based on a case-study methodology. In Malaysia, three BIM projects were chosen, given the available resources. To evaluate the data in this qualitative study, NVivo was used. FindingsAccording to the findings, the most important elements influencing the adoption of new technology and innovation were people and capital. The most significant impediments to BIM adoption are the appraisal of time and finances, as well as the tolerance of changes in approach. Originality/valueCollaborative training and BIM education have been the most explored solutions for reducing BIM difficulties. As a result, these concerns and solutions should be investigated and implemented to ensure project success and fully use technological innovation.
机构:
Coventry Univ, Sch Energy Construct & Environm, Coventry, W Midlands, EnglandCoventry Univ, Sch Energy Construct & Environm, Coventry, W Midlands, England
Abu Awwad, Khaled
Shibani, Abdussalam
论文数: 0引用数: 0
h-index: 0
机构:
Coventry Univ, Sch Energy Construct & Environm, Coventry, W Midlands, EnglandCoventry Univ, Sch Energy Construct & Environm, Coventry, W Midlands, England
机构:
Hanyang Univ, ERICA, Sch Architecture & Architectural Engn, Ansan 426791, South KoreaHanyang Univ, ERICA, Sch Architecture & Architectural Engn, Ansan 426791, South Korea
Ahn, Yong Han
Kwak, Young Hoon
论文数: 0引用数: 0
h-index: 0
机构:
George Washington Univ, Sch Business, Dept Decis Sci, Washington, DC 20052 USAHanyang Univ, ERICA, Sch Architecture & Architectural Engn, Ansan 426791, South Korea
Kwak, Young Hoon
Suk, Sung Joon
论文数: 0引用数: 0
h-index: 0
机构:
Western Carolina Univ, Dept Construct Management, Cullowhee, NC 28723 USAHanyang Univ, ERICA, Sch Architecture & Architectural Engn, Ansan 426791, South Korea
机构:
King Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi ArabiaKing Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi Arabia
Almuntaser, Taqiadden
Sanni-Anibire, Muizz O.
论文数: 0引用数: 0
h-index: 0
机构:
King Fahd Univ Petr & Minerals, Dammam Community Coll, Dhahran, Saudi ArabiaKing Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi Arabia
Sanni-Anibire, Muizz O.
Hassanain, Mohammad A.
论文数: 0引用数: 0
h-index: 0
机构:
King Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi ArabiaKing Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi Arabia
机构:
Coventry Univ, Sch Energy Construct & Environm, Coventry, W Midlands, EnglandCoventry Univ, Sch Energy Construct & Environm, Coventry, W Midlands, England
Abu Awwad, Khaled
Shibani, Abdussalam
论文数: 0引用数: 0
h-index: 0
机构:
Coventry Univ, Sch Energy Construct & Environm, Coventry, W Midlands, EnglandCoventry Univ, Sch Energy Construct & Environm, Coventry, W Midlands, England
机构:
Hanyang Univ, ERICA, Sch Architecture & Architectural Engn, Ansan 426791, South KoreaHanyang Univ, ERICA, Sch Architecture & Architectural Engn, Ansan 426791, South Korea
Ahn, Yong Han
Kwak, Young Hoon
论文数: 0引用数: 0
h-index: 0
机构:
George Washington Univ, Sch Business, Dept Decis Sci, Washington, DC 20052 USAHanyang Univ, ERICA, Sch Architecture & Architectural Engn, Ansan 426791, South Korea
Kwak, Young Hoon
Suk, Sung Joon
论文数: 0引用数: 0
h-index: 0
机构:
Western Carolina Univ, Dept Construct Management, Cullowhee, NC 28723 USAHanyang Univ, ERICA, Sch Architecture & Architectural Engn, Ansan 426791, South Korea
机构:
King Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi ArabiaKing Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi Arabia
Almuntaser, Taqiadden
Sanni-Anibire, Muizz O.
论文数: 0引用数: 0
h-index: 0
机构:
King Fahd Univ Petr & Minerals, Dammam Community Coll, Dhahran, Saudi ArabiaKing Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi Arabia
Sanni-Anibire, Muizz O.
Hassanain, Mohammad A.
论文数: 0引用数: 0
h-index: 0
机构:
King Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi ArabiaKing Fahd Univ Petr & Minerals, Architectural Engn Dept, Dhahran, Saudi Arabia