共 50 条
- [31] 3D finite element analysis of a large-diameter pipe jacking during construction stage Zhenyu, G. (13631372837@126.com), 1600, E-Journal of Geotechnical Engineering (19 D): : 781 - 789
- [32] Research on key technology of pipe jacking drilling equipment for large-diameter rescue borehole of coal mine Meitiandizhi Yu Kantan/Coal Geology and Exploration, 2022, 50 (11): : 58 - 66
- [33] Study on calculation method of friction resistance of pipe jacking tunnel based on effective friction coefficient Journal of Railway Science and Engineering, 2022, 19 (11): : 3361 - 3371
- [36] Soil Layer Disturbance Caused by Pipe Jacking: Measurement and Simulation of a Case Study KSCE Journal of Civil Engineering, 2021, 25 : 1467 - 1478
- [37] Study on stability of soil around micro-tunnel construction using slurry pipe-jacking GEOTECHNICAL ENGINEERING MEETING SOCIETY'S NEEDS, VOLS 1 AND 2, PROCEEDINGS, 2001, : 425 - 429
- [40] Study on Transverse Seismic Response Characteristics of Large Diameter Vertical Double-Layer Overlapping Pipe Jacking in the Soil-Rock Composite Stratum APPLIED SCIENCES-BASEL, 2023, 13 (04):