Improving the scheduling of railway maintenance projects by minimizing passenger delays subject to event requests of railway operators

被引:2
作者
de Weert, Y. R. [1 ]
Gkiotsalitis, K. [2 ]
van Berkum, E. C. [3 ]
机构
[1] ProRail, Capac Management, POB 2038, NL-3500GA Utrecht, Netherlands
[2] Natl Tech Univ Athens, Lab Railways & Transport, 5 Iroon Polytech Str, Athens 15773, Greece
[3] Univ Twente, Fac Engn Technol, Dept Civil Engn, POB 217, NL-7500AE Enschede, Netherlands
关键词
Railway; Maintenance scheduling; Events; Passenger hindrance; TRACK MAINTENANCE; FLOW; OPTIMIZATION; NETWORK; FACETS; INEQUALITIES; POLYTOPE; MODEL; JOBS; TIME;
D O I
10.1016/j.cor.2024.106580
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In the Netherlands, it is expected that passenger activities on railway networks will double by 2050. To manage the passenger demand, railway capacity planning needs to be adapted. One fundamental aspect of the railway capacity planning is the scheduling of large maintenance projects. These maintenance requests should not be scheduled during major events to avoid the disruption of service. To do so, passenger operators can submit event request, i.e., a time period and location in which no maintenance project should be scheduled. Currently, these event requests are considered as hard constraints and the flexibility in maintenance scheduling decreases resulting in conflicts. In this study, the focus is on scheduling maintenance projects to minimize passenger delays while relaxing the hard constraints of event requests. This problem is addressed by introducing a Mixed Integer Linear Program (MILP) that minimizes passenger delays while scheduling maintenance projects, which includes capacity constraints for alternative services in event request areas during maintenance projects. The computational complexity of the proposed model is reduced by adding valid inequalities from the Single Machine Scheduling problem and using a simulated annealing meta -heuristic to find a favorable initial solution guess. Then, the MILP is solved to global optimality with Branch -and -Bound. A case study on the Dutch railway network shows improvements when event requests are not considered as hard constraints and an increase in the flexibility to schedule maintenance projects. This allows decision makers to choose from a set of optimal maintenance schedules with different characteristics.
引用
收藏
页数:15
相关论文
共 60 条
  • [1] Rescheduling rail networks with maintenance disruptions using Problem Space Search
    Albrecht, A. R.
    Panton, D. M.
    Lee, D. H.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (03) : 703 - 712
  • [2] [Anonymous], 2019, The Future of Rail
  • [3] INTERSECTION CUTS - NEW TYPE OF CUTTING PLANES FOR INTEGER PROGRAMMING
    BALAS, E
    [J]. OPERATIONS RESEARCH, 1971, 19 (01) : 19 - +
  • [4] Lift-and-project for mixed 0-1 programming: recent progress
    Balas, E
    Perregaard, M
    [J]. DISCRETE APPLIED MATHEMATICS, 2002, 123 (1-3) : 129 - 154
  • [5] Gomory cuts revisited
    Balas, E
    Ceria, S
    Cornuejols, G
    Natraj, N
    [J]. OPERATIONS RESEARCH LETTERS, 1996, 19 (01) : 1 - 9
  • [6] Bekke C, 2021, Corridorboek 2023
  • [7] Scheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time period
    Boland, Natashia
    Kalinowski, Thomas
    Kaur, Simranjit
    [J]. JOURNAL OF COMBINATORIAL OPTIMIZATION, 2016, 32 (03) : 885 - 905
  • [8] Scheduling arc maintenance jobs in a network to maximize total flow over time
    Boland, Natashia
    Kalinowski, Thomas
    Waterer, Hamish
    Zheng, Lanbo
    [J]. DISCRETE APPLIED MATHEMATICS, 2014, 163 : 34 - 52
  • [9] Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain
    Boland, Natashia
    Kalinowski, Thomas
    Waterer, Hamish
    Zheng, Lanbo
    [J]. JOURNAL OF SCHEDULING, 2013, 16 (06) : 649 - 659
  • [10] Bonami P, 2011, LECT NOTES COMPUT SC, V6655, P52, DOI 10.1007/978-3-642-20807-2_5