A critical review of planning and scheduling in steel-making and continuous casting in the steel industry

被引:9
作者
Lee, Myungho [1 ]
Moon, Kyungduk [1 ]
Lee, Kangbok [1 ]
Hong, Juntaek [1 ]
Pinedo, Michael [2 ]
机构
[1] Pohang Univ Sci & Technol, Pohang, South Korea
[2] NYU, New York, NY USA
基金
新加坡国家研究基金会;
关键词
Steel-making; continuous casting; production planning; scheduling; survey; HYBRID FLOW-SHOP; LAGRANGIAN-RELAXATION APPROACH; VARIABLE NEIGHBORHOOD SEARCH; DECISION-SUPPORT-SYSTEM; CONTINUOUS SLAB CASTER; GENETIC ALGORITHM; COLUMN-GENERATION; INTEGRATED PRODUCTION; PROCESSING TIME; SINGLE-MACHINE;
D O I
10.1080/01605682.2023.2265416
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Steel-making and continuous casting (SCC) processes are considered the main bottlenecks in the steel industry. We consider planning and scheduling problems in SCC processes and provide an overview of the literature with our commentary. The planning problem has as goal to create out of customer orders production units for the various production processes. The scheduling problem assigns these production units to the production facilities over different time intervals. We review a large number of planning and scheduling papers and propose two basic models for the planning and the scheduling problems that incorporate the most common and essential features. We describe for each problem the respective constraints and objectives as well as the practical implications in an actual production environment. We also analyse the methodologies used in their solutions, including decomposition strategies. In the last section, we present the conclusions of our survey and propose new research directions.
引用
收藏
页码:1421 / 1455
页数:35
相关论文
共 218 条
  • [1] Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers
    Abyaneh, Sina Hakimzadeh
    Zandieh, M.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (1-4) : 309 - 325
  • [2] Optimization of ironmaking process for reducing CO2 emissions in the integrated steel works
    Ariyama, Tatsuro
    Sato, Michitaka
    [J]. ISIJ INTERNATIONAL, 2006, 46 (12) : 1736 - 1744
  • [3] Modeling and solving the steelmaking and casting scheduling problem
    Armellini, Davide
    Borzone, Paolo
    Ceschia, Sara
    Di Gaspero, Luca
    Schaerf, Andrea
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2020, 27 (01) : 57 - 90
  • [4] A novel hybrid algorithm for scheduling steel-making continuous casting production
    Atighehchian, Arezoo
    Bijari, Mehdi
    Tarkesh, Hamed
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (08) : 2450 - 2461
  • [5] Production planning with flexible product specifications: An application to specialty steel manufacturing
    Balakrishnan, A
    Geunes, J
    [J]. OPERATIONS RESEARCH, 2003, 51 (01) : 94 - 112
  • [6] A mixed-integer linear programming model for the continuous casting planning
    Bellabdaoui, A.
    Teghem, J.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 104 (02) : 260 - 270
  • [7] A SCHEDULING MODEL FOR LTV STEELS CLEVELAND WORKS TWIN STRAND CONTINUOUS SLAB CASTER
    BOX, RE
    HERBE, DG
    [J]. INTERFACES, 1988, 18 (01) : 42 - 56
  • [8] The Challenge of Digitalization in the Steel Sector
    Branca, Teresa Annunziata
    Fornai, Barbara
    Colla, Valentina
    Murri, Maria Maddalena
    Streppa, Eliana
    Schroeder, Antonius Johannes
    [J]. METALS, 2020, 10 (02)
  • [9] An efficient scheduling approach for an iron-steel plant equipped with self-generation equipment under time-of-use electricity tariffs
    Cao, Jianhua
    Pan, Ruilin
    Xia, Xue
    Shao, Xuemei
    Wang, Xuemin
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2021, 60
  • [10] Grouping products for the optimization of production processes: A case in the steel manufacturing industry
    Casado, Silvia
    Laguna, Manuel
    Pacheco, Joaquin
    Puche, Julio C.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 286 (01) : 190 - 202