Bi-objective optimization using an improved NSGA-II for energy-efficient scheduling of a distributed assembly blocking flowshop

被引:10
|
作者
Niu, Wei [1 ]
Li, Jun-qing [1 ,2 ]
Jin, Hui [1 ]
Qi, Rui [1 ]
Sang, Hong-yan [2 ]
机构
[1] Shandong Normal Univ, Sch Informat Sci & Engn, Jinan, Peoples R China
[2] Liaocheng Univ, Sch Comp, Liaocheng, Shandong, Peoples R China
基金
美国国家科学基金会;
关键词
Distributed permutation blocking flowshop; energy-efficient; Non-dominated Sorting Genetic Algorithm-II; multi-objective; ALGORITHM; MAKESPAN; EVOLUTION; MODEL;
D O I
10.1080/0305215X.2022.2032017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, an Energy-Efficient Distributed Assembly Blocking FlowShoP (EEDABFSP) is considered. An improved Non-dominated Sorting Genetic Algorithm-II (NSGA-II) is developed to solve it. Two objectives have been considered, i.e. minimizing the maximum completion time and total energy consumption. To begin, each feasible solution is encoded as a one-dimensional vector with the factory assignment, operation scheduling and speed setting assigned. Next, two initialization schemes are presented to improve both quality and diversity, which are based on distributed assembly attributes and the slowest allowable speed criterion, respectively. Then, to accelerate the convergence process, a novel Pareto-based crossover operator is designed. Because the populations have different initialization strategies, four different mutation operators are designed. In addition, a distributed local search is integrated to improve exploitation abilities. Finally, the experimental results demonstrate that the proposed algorithm is more efficient and effective for solving the EEDABFSP.
引用
收藏
页码:719 / 740
页数:22
相关论文
共 50 条
  • [41] Fuzzy correlation entropy-based NSGA-II for energy-efficient hybrid flow-shop scheduling problem
    Wang, Yi-Jian
    Li, Juan
    Wang, Gai-Ge
    KNOWLEDGE-BASED SYSTEMS, 2023, 277
  • [42] Multi-objective Task Scheduling to Minimize Energy Consumption and Makespan of Cloud Computing Using NSGA-II
    Sofia, A. Sathya
    GaneshKumar, P.
    JOURNAL OF NETWORK AND SYSTEMS MANAGEMENT, 2018, 26 (02) : 463 - 485
  • [43] Multi-objective control optimization of isolated bridge using replicator controller and NSGA-II
    Momeni, Zahrasadat
    Bagchi, Ashotush
    HELIYON, 2023, 9 (09)
  • [44] Distributed Energy-Efficient Assembly Scheduling Problem with Transportation Capacity
    Lei, Deming
    Li, Jinlin
    SYMMETRY-BASEL, 2022, 14 (11):
  • [45] Bi-objective carbon-efficient distributed flow-shop scheduling with multistep electricity pricing
    Yu, Xianyu
    Du, Hengte
    Zhou, Dequn
    Wang, Qunwei
    Lin, Guohui
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (18) : 6842 - 6858
  • [46] An improved NSGA-II with local search for multi-objective integrated production and inventory scheduling problem
    Lv, Lingling
    Shen, Weiming
    JOURNAL OF MANUFACTURING SYSTEMS, 2023, 68 : 99 - 116
  • [47] Cross-trained workers scheduling for field service using improved NSGA-II
    Xu, Zhitao
    Ming, X. G.
    Zheng, Maokuan
    Li, Miao
    He, Lina
    Song, Wenyan
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) : 1255 - 1272
  • [48] Bi-level optimization of shared manufacturing service composition based on improved NSGA-II
    Wang, Ying
    Liu, Peng
    PLOS ONE, 2024, 19 (06):
  • [49] Multi-objective optimization method using an improved NSGA-II algorithm for oil-gas production process
    Liu, Tan
    Gao, Xianwen
    Wang, Lina
    JOURNAL OF THE TAIWAN INSTITUTE OF CHEMICAL ENGINEERS, 2015, 57 : 42 - 53
  • [50] Multi-objective optimization for stochastic computer networks using NSGA-II and TOPSIS
    Lin, Yi-Kuei
    Yeh, Cheng-Ta
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 218 (03) : 735 - 746