An AMOS-SEM approach to evaluating stakeholders' influence on construction project delivery performance

被引:6
作者
AL-Fadhali, Najib [1 ]
机构
[1] Univ Tun Hussein Onn Malaysia, Batu Pahat, Malaysia
关键词
Internal stakeholder; AMOS-SEM; Influencing factors; Project delivery performance; FACTORS IIFS MODEL; COMPLETION DELAY; MANAGEMENT; PANACEA;
D O I
10.1108/ECAM-09-2021-0780
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Construction project stakeholders can have a major effect on delivering projects on time. However, little attempt has been made to address the influence of internal stakeholders on delaying project delivery. This research aims to propose the internal stakeholders' influence as a solution to improving project delivery performance (PDP) in order to boost the value of investment in the construction industry's projects. Design/methodology/approach In Yemen, a structured questionnaire was distributed to owners, consultants and contractors, 283 of which were found usable after the data screening. A purposeful sampling technique was used and structural equation modelling (SEM) was adopted for analysis. The structural model was drawn up, based on seven categories of influencing factors: labour, supplier, designer, contractor, consultant, sub-contractor and owner. Findings The results of the structural model suggest that of these seven categories, designers, owners, suppliers and subcontractors have a significant p-value and impact on PDP, while the labour and consultant's impact was not substantiated. The findings support the proposal that internal stakeholders' influence contributes directly to construction PDP. Originality/value The influence of stakeholders on PDP is important. Nonetheless, few studies have focussed on their effectiveness, especially in developing countries. This paper's contribution is evaluating the cause-effect relationship between stakeholders' influence and construction PDP through analysis of moment structures (AMOS) analysis. The policy implications of the research are to encourage governments in general and construction companies in particular to take responsibility for improving PDP, as slow execution of construction projects leads to increased costs, failure and abandoning projects.
引用
收藏
页码:638 / 661
页数:24
相关论文
共 47 条
  • [1] The professionals' perspective on the causes of project delay in the construction industry
    Agyekum-Mensah, George
    Knight, Andrew David
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (05) : 828 - 841
  • [2] Al-Fadhali N., 2018, Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate, 2016, V209889, P927, DOI [10.1007/978-981-10-6190-584, DOI 10.1007/978-981-10-6190-584]
  • [3] Validation of an integrated influential factors (IIFs) model as a panacea to curb projects completion delay in Yemen
    Al-Fadhali, Najib
    Mansir, Dodo
    Zainal, Rozlin
    [J]. JOURNAL OF SCIENCE AND TECHNOLOGY POLICY MANAGEMENT, 2019, 10 (03) : 793 - 811
  • [4] The desirability of Integrated Influential Factors (IIFs) Model of internal stakeholder as a panacea to project completion delay in Yemen
    Al-Fadhali, Najib
    Zainal, Rozlin
    Kasim, Narimah
    Dodo, Mansir
    Soon, Ng Kim
    Hasaballah, Abdel Hafiz Ali
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (02) : 128 - 136
  • [5] Causes of delay in Saudi public construction projects
    Alsuliman, Jawad A.
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2019, 58 (02) : 801 - 808
  • [6] Anning D.K.O., 2021, THESIS TARKWA
  • [7] [Anonymous], 2013, GUIDE PROJECT MANAGE, V5
  • [8] Editorial: stakeholder management in construction
    Atkin, Brian
    Skitmore, Martin
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (06) : 549 - 552
  • [9] Awang Z., 2014, Bandar Baru Bangi, MPWS Rich Resources, V10, P32
  • [10] Exploring delay causes of road construction projects in Egypt
    Aziz, Remon F.
    Abdel-Hakam, Asmaa A.
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2016, 55 (02) : 1515 - 1539