Production and energy mode control of a production-inventory system

被引:10
作者
Tan, Baris [1 ]
Karabag, Oktay [2 ,3 ]
Khayyati, Siamak [4 ]
机构
[1] Koc Univ, Coll Adm Sci & Econ, Coll Engn, Rumeli Feneri Yolu, TR-34450 Istanbul, Turkiye
[2] Erasmus Univ, Erasmus Sch Econ, Burgemeester Oudlaan 50, NL-3000 DR Rotterdam, Netherlands
[3] Yasar Univ, Dept Ind Engn, Univ Caddesi Agacli Yol 37-39, TR-35100 Izmir, Turkiye
[4] Univ Mannheim, Mannheim Business Sch, D-68161 Mannheim, Germany
基金
欧盟地平线“2020”;
关键词
Flexible manufacturing systems control; Markov processes; OR in energy; Dynamic programming; CONSUMPTION; EFFICIENCY; PARALLEL; POLICY;
D O I
10.1016/j.ejor.2022.12.021
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Energy efficiency in manufacturing can be improved by controlling energy modes and production dy-namically. We examine a production-inventory system that can operate in Working, Idle, and Off energy modes with mode-dependent energy costs. There can be a warm-up delay to switch between one mode to another. With random inter-arrival, production and warm-up times, we formulate the problem of de-termining in which mode the production resource should operate at a given time depending on the state of the system as a stochastic control problem under the long-run average profit criterion considering the sales revenue together with energy, inventory holding and backlog costs. The optimal solution of the problem for the exponential inter-arrival, production and warm-up times is determined by solving the Markov Decision Process with a linear programming approach. The structure of the optimal policy for the exponential case uses two thresholds to switch between the Working and Idle or Working and Off modes. We use the two-threshold policy as an approximate policy to control a system with correlated inter-event times with general distributions. This system is modelled as a Quasi Birth and Death Process and analyzed by using a matrix-geometric method. Our numerical experiments show that the joint pro-duction and energy control policy performs better compared to the pure production and energy control policies depending on the system parameters. In summary, we propose a joint energy and production control policy that improves energy efficiency by controlling the energy modes depending on the state of the system. (c) 2022 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY license ( http://creativecommons.org/licenses/by/4.0/ )
引用
收藏
页码:1176 / 1187
页数:12
相关论文
共 50 条
[31]   A two-stage sustainable production-inventory model with carbon credit demand [J].
Huang, Y. F. ;
Weng, M. W. ;
Fu, C. J. .
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2024, 15 (02) :96-108
[32]   Optimizing stochastic production-inventory systems: A heuristic based on simulation and regression analysis [J].
Arreola-Risa, Antonio ;
Gimenez-Garcia, Victor M. ;
Luis Martinez-Parra, Jose .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (01) :107-118
[33]   An integrated production-inventory model with defective item dependent stochastic credit period [J].
Das, Bibhas Chandra ;
Das, Barun ;
Mondal, Shyamal Kumar .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 110 :255-263
[34]   Joint production, inventory rationing, and order admission control of a stochastic manufacturing system with setups [J].
Ioannidis, Stratos ;
Xanthopoulos, Alexandros S. ;
Sarantis, Ioannis ;
Koulouriotis, Dimitrios E. .
OPERATIONAL RESEARCH, 2021, 21 (02) :827-855
[35]   OPTIMAL DRIFT RATE CONTROL AND IMPULSE CONTROL FOR A STOCHASTIC INVENTORY/PRODUCTION SYSTEM [J].
Cao, Ping ;
Yao, Dacheng .
SIAM JOURNAL ON CONTROL AND OPTIMIZATION, 2018, 56 (03) :1856-1883
[36]   ON THE LONG-RUN AVERAGE COST MINIMIZATION PROBLEM OF THE STOCHASTIC PRODUCTION-INVENTORY MODELS [J].
Xie, Bowen ;
Gao, Yijin .
JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2024, 20 (05) :1823-1844
[37]   Optimal transportation and business cycles in an integrated production-inventory model with a discrete credit period [J].
Das, Bibhas Chandra ;
Das, Barun ;
Mondal, Shyamal Kumar .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2014, 68 :1-13
[38]   A vendor-buyer integrated production-inventory model with normal distribution of lead time [J].
Hoque, M. A. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 144 (02) :409-417
[39]   Parallel service mode of production and inventory for spare part inventory optimization [J].
Zhang, Like ;
Deng, Qianwang ;
Miao, Bingxin ;
Liu, Xiaoyan ;
Shao, Haidong .
KNOWLEDGE-BASED SYSTEMS, 2022, 241
[40]   A production-inventory model with probabilistic deterioration in two-echelon supply chain management [J].
Sarkar, Biswajit .
APPLIED MATHEMATICAL MODELLING, 2013, 37 (05) :3138-3151