On the summary measures for the resource-constrained project scheduling problem

被引:4
作者
Van Eynde, Rob [1 ,2 ]
Vanhoucke, Mario [1 ,3 ,4 ]
Coelho, Jose [1 ,5 ,6 ]
机构
[1] Univ Ghent, Fac Econ, Business Adm, Tweekerkenstr 2, B-9000 Ghent, Belgium
[2] Univ Barcelona, Fac Econ & Business, Diagonal 690, Barcelona 08014, Spain
[3] Vlerick Business Sch, Reep 1, B-9000 Ghent, Belgium
[4] UCL, UCL Sch Management, 1 Canada Sq, London E14, England
[5] Univ Aberta, Rua Escola Politecn 147, P-1269001 Lisbon, Portugal
[6] INESC TEC, Campus FEUP,Rua Escola Politecn, P-4200465 Porto, Portugal
关键词
Project scheduling; Summary measures; Datasets; Instance complexity; ALLOCATION; COMPLEXITY; DELAY;
D O I
10.1007/s10479-023-05470-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The resource-constrained project scheduling problem is a widely studied problem in the literature. The goal is to construct a schedule for a set of activities, such that precedence and resource constraints are respected and that an objective function is optimized. In project scheduling literature, summary measures are often used as a tool to evaluate the performance of algorithms and to analyze instances and datasets. They can be classified in two groups, network measures describe the precedence constraints of a project, while resource measures focus on the resource constraints of the instance. In this manuscript we make an exhaustive evaluation of the summary measures for project scheduling. We provide an overview of the most prevalent measures and also introduce some new ones. For our tests we combine different datasets from the literature and generate a new set with diverse characteristics. We evaluate the performance of the summary measures on three dimensions: consistency, instance complexity and algorithm selection. We conclude by providing an overview of which measures are best suited for each of the three investigated dimensions.
引用
收藏
页码:593 / 625
页数:33
相关论文
共 39 条
  • [1] OPTIMAL REDUCTION OF 2-TERMINAL DIRECTED ACYCLIC GRAPHS
    BEIN, WW
    KAMBUROWSKI, J
    STALLMANN, MFM
    [J]. SIAM JOURNAL ON COMPUTING, 1992, 21 (06) : 1112 - 1129
  • [2] Going to the core of hard resource-constrained project scheduling instances
    Coelho, Jose
    Vanhoucke, Mario
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2020, 121
  • [3] An exact composite lower bound strategy for the resource-constrained project scheduling problem
    Coelho, Jose
    Vanhoucke, Mario
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2018, 93 : 135 - 150
  • [4] HEURISTICS FOR SCHEDULING RESOURCE CONSTRAINED PROJECTS - EXPERIMENTAL INVESTIGATION
    COOPER, DF
    [J]. MANAGEMENT SCIENCE, 1976, 22 (11) : 1186 - 1194
  • [5] Dar-EL E. M., 1973, AIIE Transactions, V5, P343, DOI 10.1080/05695557308974922
  • [6] EXPERIMENTAL INVESTIGATION OF RESOURCE ALLOCATION IN MULTIACTIVITY PROJECTS
    DAVIES, EM
    [J]. OPERATIONAL RESEARCH QUARTERLY, 1973, 24 (04) : 587 - 591
  • [7] Davis E. W., 1975, AIIE Transactions, V7, P132, DOI 10.1080/05695557508974995
  • [8] De Reyck B., 1995, USE RESTRICTIVENESS
  • [9] RanGen: A random network generator for activity-on-the-node networks
    Demeulemeester, E
    Vanhoucke, M
    Herroelen, W
    [J]. JOURNAL OF SCHEDULING, 2003, 6 (01) : 17 - 38
  • [10] Optimal procedures for the discrete time cost trade-off problem in project networks
    Demeulemeester, EL
    Herroelen, WS
    Elmaghraby, SE
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (01) : 50 - 68