A Blind Spot in the LVRT Current Requirements of Modern Grid Codes for Inverter-Based Resources

被引:20
作者
Azizi, Ali [1 ]
Banaiemoqadam, Amin [2 ]
Hooshyar, Ali [1 ]
Patel, Manish [3 ]
机构
[1] Univ Toronto, Dept Elect & Comp Engn, Toronto, ON M5S 3G4, Canada
[2] GE Renewable Energy, Markham, ON L6C 0M1, Canada
[3] Southern Co, Atlanta, GA 30308 USA
关键词
Inverters; Low voltage; Current measurement; Codes; Transformers; Renewable energy sources; Voltage; Fault current; grid codes (GCs); inverter-based resources (IBRs); low-voltage ride-through (LVRT); FAULT-RIDE-THROUGH; LIMITATION; STRATEGIES;
D O I
10.1109/TPWRD.2022.3187223
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Modern grid codes (GCs) require that inverter-based resources (IBRs) inject both positive- and negative-sequence currents during asymmetrical low-voltage ride through (LVRT) conditions. This GC provision prioritizes the reactive currents and also demands maximizing the active positive-sequence current if the IBR has unused current generation capacity when the required reactive current is generated. A variety of inverter control schemes are available to generate positive- and negative-sequence active/reactive currents, and satisfying these GCs seems to be straightforward. However, this paper reveals that the reference current generation methods of existing inverter control schemes fail to fulfil some important requirements of recent GCs. For example, they do not fully utilize the inverter capacity to generate the maximum active and/or reactive current. It is shown that these so-far hidden GC violations can result in a large untapped generation capacity during asymmetrical faults. This paper also develops an algorithm that satisfies recent GCs by deriving the positive- and negative-sequence currents that maximize the IBR's reactive and active currents while the reactive current is prioritized. The simulation of a grid with high IBR penetration verifies that this new algorithm can unlock the full potential of recent GCs by significantly increasing the power generated during LVRT.
引用
收藏
页码:319 / 334
页数:16
相关论文
共 20 条
  • [1] [Anonymous], 2018, German Standard: Technical Requirements for the Connection and Operation of Customer Installations to the Extra High Voltage Network
  • [2] [Anonymous], 2019, CLCTC 8X
  • [3] [Anonymous], 2021, 2800 IEEE
  • [4] [Anonymous], 2006, GRID CONN REG HIGH E
  • [5] [Anonymous], 2014, Tech. Rep.
  • [6] Resilience Enhancement of Microgrids With Inverter-Interfaced DGs by Enabling Faulty Phase Selection
    Azzouz, Maher Abdelkhalek
    Hooshyar, Ali
    El-Saadany, Ehab F.
    [J]. IEEE TRANSACTIONS ON SMART GRID, 2018, 9 (06) : 6578 - 6589
  • [7] bit.ly, 2013, 39 IEEE
  • [8] bit.ly, 2017, GRID COD
  • [9] Comparison of Current-Limiting Strategies During Fault Ride-Through of Inverters to Prevent Latch-Up and Wind-Up
    Bottrell, Nathaniel
    Green, Timothy C.
    [J]. IEEE TRANSACTIONS ON POWER ELECTRONICS, 2014, 29 (07) : 3786 - 3797
  • [10] Active and Reactive Power Injection Strategies for Three-Phase Four-Wire Inverters During Symmetrical/Asymmetrical Voltage Sags
    Brandao, Danilo Iglesias
    Mendes, Frederico E. G.
    Ferreira, Reginaldo Vagner
    Silva, Sidelmo Magalhaes
    Pires, Igor Amariz
    [J]. IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2019, 55 (03) : 2347 - 2355