Energy-efficient single-machine scheduling with release dates under time-of-use electricity tariffs

被引:9
作者
Wu, Peng [1 ]
Li, Nan [1 ]
Cheng, Junheng [2 ]
Chu, Chengbin [1 ]
机构
[1] Fuzhou Univ, Sch Econ & Management, Fuzhou 350108, Peoples R China
[2] Fujian Normal Univ, Sch Econ, Fuzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Single-machine scheduling; TOU electricity tariffs; Release dates; Mixed-integer linear programming; Two-stage heuristic algorithm; BI-OBJECTIVE OPTIMIZATION; COST; CONSUMPTION; ALGORITHM; MODEL;
D O I
10.1016/j.jclepro.2023.136228
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The global trend of increasing resource utilization in industry has drawn great attention from researchers and practitioners. Industrial managers are increasingly optimizing their production strategies based on time-of-use (TOU) electricity tariffs to reduce energy consumption costs. This study investigates a new energy-efficient single-machine scheduling problem with release dates under TOU electricity tariffs. It consists in sequencing a set of jobs with release dates to a machine under TOU pricing to minimize the total energy cost given a bounded maximum completion time. We first formulate the problem using the widely used time-indexed mixed-integer linear programming (T-MILP). Due to its time-consuming disadvantage, a new period-based MILP (P-MILP) model is developed based on the characteristics of the problem. Given the NP-hardness of the problem, a two -stage heuristic (TSH) algorithm is proposed to solve practical-sized problems. Specifically, in the first stage, a constructive heuristic is designed to obtain an initial solution, and in the second one, a tailored tabu search is devised to yield a better satisfactory solution. Numerical experiments are conducted on a real-life case and 1150 randomly generated instances with up to 1000 jobs. Computational results show that (i) the proposed models can save the total electricity cost by about 30% compared with an existing empirical scheduling method when solving small-sized instances; (ii) the efficiency of P-MILP is about 140.94% higher than that of T-MILP; and (iii) the proposed TSH algorithm can efficiently obtain high-quality solutions for practical-sized instances with gaps of less than 7% compared to the lower bounds, which can effectively support production managers to save the energy costs in practical production.
引用
收藏
页数:12
相关论文
共 49 条
[41]   Bi-objective identical parallel machine scheduling to minimize total energy consumption and makespan [J].
Wang, Shijin ;
Wang, Xiaodong ;
Yu, Jianbo ;
Ma, Shuan ;
Liu, Ming .
JOURNAL OF CLEANER PRODUCTION, 2018, 193 :424-440
[42]   Bi-objective optimization of a single machine batch scheduling problem with energy cost consideration [J].
Wang, Shijin ;
Liu, Ming ;
Chu, Feng ;
Chu, Chengbin .
JOURNAL OF CLEANER PRODUCTION, 2016, 137 :1205-1215
[43]   Two-stage parallel speed-scaling machine scheduling under time-of-use tariffs [J].
Zhang, Hongliang ;
Wu, Yujuan ;
Pan, Ruilin ;
Xu, Gongjie .
JOURNAL OF INTELLIGENT MANUFACTURING, 2021, 32 (01) :91-112
[44]   A New Energy-Aware Flexible Job Shop Scheduling Method Using Modified Biogeography-Based Optimization [J].
Zhang, Hua ;
Dai, Ziwei ;
Zhang, Wenyu ;
Zhang, Shuai ;
Wang, Yan ;
Liu, Rongyu .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2017, 2017
[45]   Optimization for energy-efficient flexible flow shop scheduling under time of use electricity tariffs [J].
Zhang, Mingyang ;
Yan, Jihong ;
Zhang, Yanling ;
Yan, Shenyi .
26TH CIRP CONFERENCE ON LIFE CYCLE ENGINEERING (LCE), 2019, 80 :251-256
[46]   Improved mixed-integer linear programming model and heuristics for bi-objective single-machine batch scheduling with energy cost consideration [J].
Zhang, Shibohua ;
Che, Ada ;
Wu, Xueqi ;
Chu, Chengbin .
ENGINEERING OPTIMIZATION, 2018, 50 (08) :1380-1394
[47]   A modified particle swarm optimization algorithm for a batch-processing machine scheduling problem with arbitrary release times and non-identical job sizes [J].
Zhou, Hongming ;
Pang, Jihong ;
Chen, Ping-Kuo ;
Chou, Fuh-Der .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 123 :67-81
[48]   Energy-efficient scheduling of a single batch processing machine with dynamic job arrival times [J].
Zhou, Shengchao ;
Jin, Mingzhou ;
Du, Ni .
ENERGY, 2020, 209
[49]   A multi-objective differential evolution algorithm for parallel batch processing machine scheduling considering electricity consumption cost [J].
Zhou, Shengchao ;
Li, Xiaolin ;
Du, Ni ;
Pang, Yan ;
Chen, Huaping .
COMPUTERS & OPERATIONS RESEARCH, 2018, 96 :55-68