Energy-efficient single-machine scheduling with release dates under time-of-use electricity tariffs

被引:9
作者
Wu, Peng [1 ]
Li, Nan [1 ]
Cheng, Junheng [2 ]
Chu, Chengbin [1 ]
机构
[1] Fuzhou Univ, Sch Econ & Management, Fuzhou 350108, Peoples R China
[2] Fujian Normal Univ, Sch Econ, Fuzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Single-machine scheduling; TOU electricity tariffs; Release dates; Mixed-integer linear programming; Two-stage heuristic algorithm; BI-OBJECTIVE OPTIMIZATION; COST; CONSUMPTION; ALGORITHM; MODEL;
D O I
10.1016/j.jclepro.2023.136228
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The global trend of increasing resource utilization in industry has drawn great attention from researchers and practitioners. Industrial managers are increasingly optimizing their production strategies based on time-of-use (TOU) electricity tariffs to reduce energy consumption costs. This study investigates a new energy-efficient single-machine scheduling problem with release dates under TOU electricity tariffs. It consists in sequencing a set of jobs with release dates to a machine under TOU pricing to minimize the total energy cost given a bounded maximum completion time. We first formulate the problem using the widely used time-indexed mixed-integer linear programming (T-MILP). Due to its time-consuming disadvantage, a new period-based MILP (P-MILP) model is developed based on the characteristics of the problem. Given the NP-hardness of the problem, a two -stage heuristic (TSH) algorithm is proposed to solve practical-sized problems. Specifically, in the first stage, a constructive heuristic is designed to obtain an initial solution, and in the second one, a tailored tabu search is devised to yield a better satisfactory solution. Numerical experiments are conducted on a real-life case and 1150 randomly generated instances with up to 1000 jobs. Computational results show that (i) the proposed models can save the total electricity cost by about 30% compared with an existing empirical scheduling method when solving small-sized instances; (ii) the efficiency of P-MILP is about 140.94% higher than that of T-MILP; and (iii) the proposed TSH algorithm can efficiently obtain high-quality solutions for practical-sized instances with gaps of less than 7% compared to the lower bounds, which can effectively support production managers to save the energy costs in practical production.
引用
收藏
页数:12
相关论文
共 49 条
[1]   Energy cost minimization for unrelated parallel machine scheduling under real time and demand charge pricing [J].
Abikarram, Jose Batista ;
McConky, Katie ;
Proano, Ruben .
JOURNAL OF CLEANER PRODUCTION, 2019, 208 :232-242
[2]   Energy efficient scheduling problems under Time-Of-Use tariffs with different energy consumption of the jobs [J].
Aghelinejad, MohammadMohsen ;
Ouazene, Yassine ;
Yalaoui, Alice .
IFAC PAPERSONLINE, 2018, 51 (11) :1053-1058
[3]  
[Anonymous], 2012, EFFECT SMART METERIN
[4]   OPTIMIZING ELECTRICITY COSTS DURING INTEGRATED SCHEDULING OF JOBS AND STOCHASTIC PREVENTIVE MAINTENANCE UNDER TIME-OF-USE ELECTRICITY TARIFFS [J].
Assia, Sadiqi ;
Ikram, El Abbassi ;
Abdellah, El Barkany ;
Moumen, Darcherif ;
Ahmed, El Biyaali .
MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2019, 10 (04) :123-132
[5]   Robust single machine makespan scheduling with release date uncertainty [J].
Bachtler, Oliver ;
Krumke, Sven O. ;
Huy Minh Le .
OPERATIONS RESEARCH LETTERS, 2020, 48 (06) :816-819
[6]   Effective algorithms for single-machine learning-effect scheduling to minimize completion-time-based criteria with release dates [J].
Bai, Danyu ;
Xue, Hanyu ;
Wang, Ling ;
Wu, Chin-Chia ;
Lin, Win-Chin ;
Abdulkadir, Danladi H. .
EXPERT SYSTEMS WITH APPLICATIONS, 2020, 156
[7]   Carbon Footprint and the Management of Supply Chains: Insights From Simple Models [J].
Benjaafar, Saif ;
Li, Yanzhi ;
Daskin, Mark .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2013, 10 (01) :99-116
[8]   Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs [J].
Che, Ada ;
Zhang, Shibohua ;
Wu, Xueqi .
JOURNAL OF CLEANER PRODUCTION, 2017, 156 :688-697
[9]   Energy-efficient bi-objective single-machine scheduling with power-down mechanism [J].
Che, Ada ;
Wu, Xueqi ;
Peng, Jing ;
Yan, Pengyu .
COMPUTERS & OPERATIONS RESEARCH, 2017, 85 :172-183
[10]   An efficient greedy insertion heuristic for energy-conscious single machine scheduling problem under time-of-use electricity tariffs [J].
Che, Ada ;
Zeng, Yizeng ;
Lyu, Ke .
JOURNAL OF CLEANER PRODUCTION, 2016, 129 :565-577