Energy-efficient single-machine scheduling with release dates under time-of-use electricity tariffs

被引:6
作者
Wu, Peng [1 ]
Li, Nan [1 ]
Cheng, Junheng [2 ]
Chu, Chengbin [1 ]
机构
[1] Fuzhou Univ, Sch Econ & Management, Fuzhou 350108, Peoples R China
[2] Fujian Normal Univ, Sch Econ, Fuzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Single-machine scheduling; TOU electricity tariffs; Release dates; Mixed-integer linear programming; Two-stage heuristic algorithm; BI-OBJECTIVE OPTIMIZATION; COST; CONSUMPTION; ALGORITHM; MODEL;
D O I
10.1016/j.jclepro.2023.136228
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The global trend of increasing resource utilization in industry has drawn great attention from researchers and practitioners. Industrial managers are increasingly optimizing their production strategies based on time-of-use (TOU) electricity tariffs to reduce energy consumption costs. This study investigates a new energy-efficient single-machine scheduling problem with release dates under TOU electricity tariffs. It consists in sequencing a set of jobs with release dates to a machine under TOU pricing to minimize the total energy cost given a bounded maximum completion time. We first formulate the problem using the widely used time-indexed mixed-integer linear programming (T-MILP). Due to its time-consuming disadvantage, a new period-based MILP (P-MILP) model is developed based on the characteristics of the problem. Given the NP-hardness of the problem, a two -stage heuristic (TSH) algorithm is proposed to solve practical-sized problems. Specifically, in the first stage, a constructive heuristic is designed to obtain an initial solution, and in the second one, a tailored tabu search is devised to yield a better satisfactory solution. Numerical experiments are conducted on a real-life case and 1150 randomly generated instances with up to 1000 jobs. Computational results show that (i) the proposed models can save the total electricity cost by about 30% compared with an existing empirical scheduling method when solving small-sized instances; (ii) the efficiency of P-MILP is about 140.94% higher than that of T-MILP; and (iii) the proposed TSH algorithm can efficiently obtain high-quality solutions for practical-sized instances with gaps of less than 7% compared to the lower bounds, which can effectively support production managers to save the energy costs in practical production.
引用
收藏
页数:12
相关论文
共 49 条
  • [1] Energy cost minimization for unrelated parallel machine scheduling under real time and demand charge pricing
    Abikarram, Jose Batista
    McConky, Katie
    Proano, Ruben
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 208 : 232 - 242
  • [2] Energy efficient scheduling problems under Time-Of-Use tariffs with different energy consumption of the jobs
    Aghelinejad, MohammadMohsen
    Ouazene, Yassine
    Yalaoui, Alice
    [J]. IFAC PAPERSONLINE, 2018, 51 (11): : 1053 - 1058
  • [3] [Anonymous], 2012, EFFECT SMART METERIN
  • [4] OPTIMIZING ELECTRICITY COSTS DURING INTEGRATED SCHEDULING OF JOBS AND STOCHASTIC PREVENTIVE MAINTENANCE UNDER TIME-OF-USE ELECTRICITY TARIFFS
    Assia, Sadiqi
    Ikram, El Abbassi
    Abdellah, El Barkany
    Moumen, Darcherif
    Ahmed, El Biyaali
    [J]. MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2019, 10 (04) : 123 - 132
  • [5] Robust single machine makespan scheduling with release date uncertainty
    Bachtler, Oliver
    Krumke, Sven O.
    Huy Minh Le
    [J]. OPERATIONS RESEARCH LETTERS, 2020, 48 (06) : 816 - 819
  • [6] Effective algorithms for single-machine learning-effect scheduling to minimize completion-time-based criteria with release dates
    Bai, Danyu
    Xue, Hanyu
    Wang, Ling
    Wu, Chin-Chia
    Lin, Win-Chin
    Abdulkadir, Danladi H.
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2020, 156
  • [7] Carbon Footprint and the Management of Supply Chains: Insights From Simple Models
    Benjaafar, Saif
    Li, Yanzhi
    Daskin, Mark
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2013, 10 (01) : 99 - 116
  • [8] Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs
    Che, Ada
    Zhang, Shibohua
    Wu, Xueqi
    [J]. JOURNAL OF CLEANER PRODUCTION, 2017, 156 : 688 - 697
  • [9] Energy-efficient bi-objective single-machine scheduling with power-down mechanism
    Che, Ada
    Wu, Xueqi
    Peng, Jing
    Yan, Pengyu
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2017, 85 : 172 - 183
  • [10] An efficient greedy insertion heuristic for energy-conscious single machine scheduling problem under time-of-use electricity tariffs
    Che, Ada
    Zeng, Yizeng
    Lyu, Ke
    [J]. JOURNAL OF CLEANER PRODUCTION, 2016, 129 : 565 - 577