Investigating the dynamic behaviour of a railway bridge subjected to over-height vehicle collision

被引:2
|
作者
Taghipour, Amirhesam [1 ]
Zakeri, Jabbar Ali [1 ]
Jahangiri, Meysam [2 ]
Mosayebi, Seyed Ali [1 ]
机构
[1] Iran Univ Sci & Technol, Sch Railway Engn, Tehran, Iran
[2] Univ Isfahan, Dept Civil Engn & Transportat, Esfahan, Iran
关键词
Railway bridge; vehicle collision; bridge superstructure; dynamic analysis; finite element method; SIMULATION; TRUCK;
D O I
10.1080/13287982.2023.2176972
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Full service without defects of railway bridges is more important than highway bridges because failure at a part of the bridge results in the blockage of the entire track and the stopping of the trains. In recent years, the problem of an over-height vehicle collision to the bridge superstructure has occurred more frequently. These collisions damage the bridge superstructure and affect the safety of the train causing many problems in railway transportation. In this study, first, a model of the concrete girder bridge was used to validate the effect of the collision load applied to the bottom of the concrete girder bridge. Then, the dynamic responses of the railway bridge simulated as concrete girders and bridge deck also track including rail, sleeper, and ballast are presented by using the finite element method. Finally, the different sensitivity analyses express that changing the bridge span length, and the value of collision loads affect the concrete girder lateral displacement at the contact area. The results show that the lateral displacements decrease with increasing the span length. Additionally, by increasing the collision forces due to increasing the velocity of the impacting object, the lateral displacement at the bottom of the girder reduces.
引用
收藏
页码:217 / 227
页数:11
相关论文
共 50 条
  • [21] Dynamic response of SRP-reinforced precast segmental bridge columns subjected to vehicle collision
    Li Q.-H.
    Zhang Y.-Y.
    Zhendong Gongcheng Xuebao/Journal of Vibration Engineering, 2021, 34 (05): : 959 - 968
  • [22] Dynamic responses of bridge pier subjected to vehicle collision considering pile-soil interaction
    Yue, Kaile
    Ji, Zhe
    Zhang, Shimeng
    Wang, Guichun
    Journal of Railway Science and Engineering, 2022, 19 (01) : 161 - 170
  • [23] Over-Height Vehicle Detection in Low Headroom Roads Using Digital Video Processing
    Khorramshahi, Vahid
    Behrad, Alireza
    Kanhere, Neeraj K.
    PROCEEDINGS OF WORLD ACADEMY OF SCIENCE, ENGINEERING AND TECHNOLOGY, VOL 29, 2008, 29 : 287 - +
  • [24] Visual Surveying of On-Road Vehicle Height for Over-Height Warning Using Deep Learning and View Geometry
    Lu, Linjun
    Dai, Fei
    CONSTRUCTION RESEARCH CONGRESS 2022: COMPUTER APPLICATIONS, AUTOMATION, AND DATA ANALYTICS, 2022, : 947 - 955
  • [25] DYNAMIC BEHAVIOUR OF A RAILWAY MINE VEHICLE.
    van Manen, P.
    Brickle, B.V.
    Mining Engineer London, 1983, 142 (261): : 653 - 656
  • [26] Real-time validation of vision-based over-height vehicle detection system
    Nguyen, Bella
    Brilakis, Ioannis
    ADVANCED ENGINEERING INFORMATICS, 2018, 38 : 67 - 80
  • [27] Computational modeling and dynamic response of highway bridge columns subjected to combined vehicle collision and air blast
    Fang, Chen
    Yosef, Tewodros Y.
    Linzell, Daniel G.
    Rasmussen, Jennifer D.
    ENGINEERING FAILURE ANALYSIS, 2021, 125
  • [28] Numerical investigation on the dynamic behavior of UHPFRC strengthened rocking concrete bridge piers subjected to vehicle collision
    Gholipour, Gholamreza
    Billah, A. H. M. Muntasir
    ENGINEERING STRUCTURES, 2023, 288
  • [29] Analysis on assessment of simplified compuational models for collision of over-height vehicles with box-girder flyovers
    Guo Y.
    Xi F.
    Tan Y.
    Hu Y.
    Liu F.
    Baozha Yu Chongji/Explosion and Shock Waves, 2023, 43 (03):
  • [30] Impact analysis of I-Lam sandwich system for over-height collision protection of highway bridges
    Qiao, PZ
    Yang, MJ
    Mosallam, AS
    ENGINEERING STRUCTURES, 2004, 26 (07) : 1003 - 1012