Solution strategies for integrated distribution, production, and relocation problems arising in modular manufacturing

被引:10
作者
Allen, R. Cory [1 ,2 ,5 ]
Avraamidou, Styliani [2 ,3 ]
Butenko, Sergiy [4 ]
Pistikopoulos, Efstratios N. [1 ,2 ]
机构
[1] Texas A&M Univ, Artie McFerrin Dept Chem Engn, College Stn, TX 77843 USA
[2] Texas A&M Univ, Texas A&M Energy Inst, College Stn, TX 77843 USA
[3] Univ Wisconsin Madison, Dept Chem & Biol Engn, Madison, WI 53706 USA
[4] Texas A&M Univ, W Michael Barnes Dept Ind & Syst Engn, College Stn, TX 77843 USA
[5] ExxonMobil Upstream Res Co Spring, Houston, TX USA
基金
美国国家科学基金会;
关键词
Production; Scheduling; Heuristics; Large scale optimization; BRANCH-AND-PRICE; DYNAMIC FACILITY LOCATION; COLUMN GENERATION; HEURISTICS;
D O I
10.1016/j.ejor.2023.09.014
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Recently, there has been a paradigm shift by certain energy companies towards modular manufacturing, whereby transportable modular production units can be relocated between production facilities to meet the spatial and temporal changes in the availabilities, demands, and prices of the underlying commodities. We refer to the optimal distribution, production, and storage of commodities, including intermediary commodities, and the relocation and operation of the modular production units as the dynamic multiple commodity supply chain problem with modular production units. To this end, we present a "flow -based" and a "path -based" mixed -integer linear programming formulation to model the problem. In an effort to solve large-scale instances of the problem, we propose an iterative three -stage matheuristic for the "path -based" formulation. In the first stage of the matheuristic, a feasible solution to the problem is generated by an integrated column generation and Lagrangian relaxation based heuristic. In the second stage of the matheuristic, a path-relinking procedure is utilized as a local search heuristic to further improve the solution. And in the final stage of the matheuristic, the Lagrangian multipliers are updated via a subgradient method. The effectiveness of the matheuristic is illustrated through numerical experiments with a set of randomly generated test instances. For the large-scale test instances, the results show that the matheuristic produces quality solutions orders of magnitude faster than a "state-of-the-art" mixed -integer linear programming solver.
引用
收藏
页码:963 / 979
页数:17
相关论文
共 36 条
[1]   The production routing problem: A review of formulations and solution algorithms [J].
Adulyasak, Yossiri ;
Cordeau, Jean-Francois ;
Jans, Raf .
COMPUTERS & OPERATIONS RESEARCH, 2015, 55 :141-152
[2]   A Maritime Inventory Routing Problem: Discrete Time Formulations and Valid Inequalities [J].
Agra, Agostinho ;
Andersson, Henrik ;
Christiansen, Marielle ;
Wolsey, Laurence .
NETWORKS, 2013, 62 (04) :297-314
[3]   Modular and mobile facility location problems: A systematic review [J].
Alarcon-Gerbier, Eduardo ;
Buscher, Udo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 173
[4]   Improvements for decomposition based methods utilized in the development of multi-scale energy systems [J].
Allen, R. Cory ;
Iseri, Funda ;
Demirhan, C. Doga ;
Pappas, Iosif ;
Pistikopoulos, Efstratios N. .
COMPUTERS & CHEMICAL ENGINEERING, 2023, 170
[5]   Production Scheduling of Supply Chains Comprised of Modular Production Units [J].
Allen, R. Cory ;
Avraamidou, Styliani ;
Pistikopoulos, Efstratios N. .
IFAC PAPERSONLINE, 2020, 53 (02) :11452-11457
[6]   Capacity Planning for Modular and Transportable Infrastructure for Shale Gas Production and Processing [J].
Allen, R. Cory ;
Allaire, Douglas ;
El-Halwagi, Mahmoud M. .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2019, 58 (15) :5887-5897
[7]   Biomass waste-to-energy supply chain optimization with mobile production modules [J].
Allman, Andrew ;
Lee, Che ;
Martin, Mariano ;
Zhang, Qi .
COMPUTERS & CHEMICAL ENGINEERING, 2021, 150 (150)
[8]   Dynamic location of modular manufacturing facilities with relocation of individual modules [J].
Allman, Andrew ;
Zhang, Qi .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 286 (02) :494-507
[9]  
[Anonymous], GUROBI OPTIMIZER REF, P2021
[10]   Design standardization of unit operations for reducing the capital intensity and cost of small-scale chemical processes [J].
Arora, Akhil ;
Li, Jianping ;
Zantye, Manali S. ;
Hasan, M. Faruque .
AICHE JOURNAL, 2020, 66 (02)