An efficient GRASP-like algorithm for the multi-product straight pipeline scheduling problem

被引:10
作者
Bamoumen, Meryem [1 ,2 ]
Elfirdoussi, Selwa [1 ]
Ren, Libo [2 ,3 ]
Tchernev, Nikolay [1 ,2 ]
机构
[1] Mohammed VI Polytech Univ, Scholl Ind Management, EMINES, Ben Guerir, Morocco
[2] Clermont Auvergne Univ, Lab Informat, UMR CNRS 6158, LIMOS, Aubiere, France
[3] Clermont Auvergne Univ, CLeRMa EA3849, Clermont Ferrand, France
关键词
Oil pipeline; Scheduling; Metaheuristic; Mixed integer linear programming; GRASP; DECOMPOSITION APPROACH; INVENTORY MANAGEMENT; MILP APPROACH; FORMULATION; MODEL;
D O I
10.1016/j.cor.2022.106082
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The present work deals with the multi-product straight pipeline scheduling problem. The considered straight pipeline system is used to transport refined petroleum products from a single source (refinery with storage tanks) to a single destination (distribution center). The main objective is to find a sequence of batches which aims to maximize the total volume to be transported via the pipeline, while meeting the daily customer demands over a fixed time horizon. Each batch contains only one product with a volume between its upper and lower bounds. Constraints related to inventory levels, batch settling periods and forbidden sequences between pairs of products must be respected, and pipeline stoppage periods should also be handled. A Mixed Integer Linear Programming (MILP) model and a Greedy Randomized Adaptive Search Procedure (GRASP)-like algorithm are proposed to tackle the problem under study. The MILP model is based on the discharging time axis with continuous repre-sentation for both time and volume formulation. The GRASP-like algorithm is composed of a construction method and an improvement procedure. The construction method generates a new sequence of batches in a random way with the use of a repair process to obtain an initial solution that satisfies all demands. Then, the improvement procedure is attempted to increase the fill rate of pipeline using volume optimization operators without change the sequence of products. A set of instances was generated from a real case study in order to validate the proposed approach. The performance of our approach is benchmarked against the MILP model (solved using Gurobi Solver), and the numerical experiments proved that the proposed approach obtains very competitive results both in term of solution quality and CPU time.
引用
收藏
页数:19
相关论文
共 50 条
  • [21] Scheduling of a multi-product polymer batch plant
    Schulz, C
    Engell, S
    Rudolf, R
    THIRD INTERNATIONAL CONFERENCE ON FOUNDATIONS OF COMPUTER-AIDED PROCESS OPERATIONS, 1998, 94 (320): : 224 - 230
  • [22] A mixed-integer linear programming for scheduling a multi-product pipeline with dual-purpose terminals
    Hossein Mostafaei
    Yagub Alipouri
    Javad Shokri
    Computational and Applied Mathematics, 2015, 34 : 979 - 1007
  • [23] Efficient reactive scheduling of multi-product batch plants under equipment failure uncertainty
    Zhu, Jin
    Gu, Xingsheng
    Gu, Wei
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT LOGISTICS SYSTEMS, 2008, : 292 - +
  • [24] Multi-product continuous plant scheduling: combination of decomposition, genetic algorithm, and constructive heuristic
    Borisovsky, Pavel
    Eremeev, Anton
    Kallrath, Josef
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (09) : 2677 - 2695
  • [25] A MILP model based on flowrate database for detailed scheduling of a multi-product pipeline with multiple pump stations
    Liao, Qi
    Zhang, Haoran
    Xu, Ning
    Liang, Yongtu
    Wang, Junao
    COMPUTERS & CHEMICAL ENGINEERING, 2018, 117 : 63 - 81
  • [26] An optimization framework for scheduling multi-period multi-product oil pipeline systems under belief degree-based uncertain parameters
    Goudarzi, F. Khalili
    Maleki, H. R.
    Niroomand, S.
    JOURNAL OF APPLIED MATHEMATICS AND COMPUTING, 2023, 69 (01) : 37 - 68
  • [27] A hybrid time MILP model for the pump scheduling of multi-product pipelines based on the rigorous description of the pipeline hydraulic loss changes
    Zhou, Xingyuan
    Zhang, Haoran
    Qiu, Rui
    Liang, Yongtu
    Wu, Guangming
    Xiang, Chengcheng
    Yan, Xiaohan
    COMPUTERS & CHEMICAL ENGINEERING, 2019, 121 : 174 - 199
  • [28] Scheduling of a multi-product batch process in the chemical industry
    Blomer, F
    Gunther, HO
    COMPUTERS IN INDUSTRY, 1998, 36 (03) : 245 - 259
  • [29] A MULTI-PRODUCT DYNAMIC INBOUND ORDERING AND SHIPMENT SCHEDULING PROBLEM AT A THIRD-PARTY WAREHOUSE
    Kim, B. S.
    Lee, W. S.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2013, 20 (1-2): : 36 - 46
  • [30] A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment
    Shanker, K
    Modi, BK
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (01) : 80 - 90