共 22 条
- [3] Rockburst Hazard Control Using the Excavation Compensation Method (ECM): A Case Study in the Qinling Water Conveyance Tunnel [J]. ENGINEERING, 2024, 34 : 154 - 163
- [4] BRITTLENESS DETERMINATION OF ROCKS BY DIFFERENT METHODS [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 1974, 11 (10): : 389 - 392