Predicting and measuring service disruption recovery time in railway gravity hump classification yards

被引:0
作者
Zhao, Jiaxi [1 ]
Dick, C. Tyler [1 ]
机构
[1] Univ Texas Austin, 301 E Dean Keeton St, Austin, TX 78712 USA
关键词
Freight; Microscopic simulation; Disruption recovery; Capacity; Resiliency; MANAGEMENT; ALGORITHM;
D O I
10.1016/j.jrtpm.2024.100433
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Planned maintenance and unplanned incidents cause service disruptions in freight railway classification yards, creating congestion, delaying railcars, and even impacting mainline operations. Understanding the recovery time and lingering performance impacts of yard disruptions is vital for the industry to plan disruption responses, promote efficient resource utilization, and improve resiliency. This paper compares two major types of yard disruptions (temporary closures of hump process and pulldown process) and quantifies the recovery pattern, measured by multiple performance metrics. The authors propose an analytical approach for estimating classification yard recovery time as a function of disruption duration and baseline capacity utilization. To validate the hypothetical approach, a series of experiments are conducted across a wide range of disruption durations and throughput volumes in a representative hump classification yard simulation model constructed using AnyLogic. The results indicate that recovery time is proportional to shutdown duration with a near constant recovery rate, and recovery rate increases approximately exponentially with throughput volume. These results are consistent with the hypothesized analytical relationships, suggesting that yard capacity may be estimated from disruption recovery rate. The methodology developed also enables future studies on interactions between yards and mainlines and developing planning-level parametric models of classification yard capacity and performance.
引用
收藏
页数:14
相关论文
共 57 条
  • [1] Solving large scale crew scheduling problems in practice
    Abbink E.J.W.
    Albino L.
    Dollevoet T.
    Huisman D.
    Roussado J.
    Saldanha R.L.
    [J]. Public Transport, 2011, 3 (2) : 149 - 164
  • [2] Albrecht T., 2011, P 2 INT C MOD TECHN
  • [3] On-line reschedule optimization for passenger railways in case of emergencies
    Almodovar, M.
    Garcia-Rodenas, R.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (03) : 725 - 736
  • [4] Armstrong J.H., 1998, RAILROAD WHAT IT IS, V4th
  • [5] A stochastic model for reliability analysis of periodic train timetables
    Artan, Mehmet Sirin
    Sahin, Ismail
    [J]. TRANSPORTMETRICA B-TRANSPORT DYNAMICS, 2023, 11 (01) : 572 - 589
  • [6] Disruption risk management in railroad networks: An optimization-based methodology and a case study
    Azad, Nader
    Hassini, Elkafi
    Verma, Manish
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2016, 85 : 70 - 88
  • [7] Baugher RogerW., 2015, Handbook of Operations Research Applications at Railroads, P219
  • [8] Resilience in railway transport systems: a literature review and research agenda
    Besinovic, Nikola
    [J]. TRANSPORT REVIEWS, 2020, 40 (04) : 457 - 478
  • [9] Rescheduling in passenger railways: the rolling stock rebalancing problem
    Budai, Gabriella
    Maroti, Gabor
    Dekker, Rommert
    Huisman, Dennis
    Kroon, Leo
    [J]. JOURNAL OF SCHEDULING, 2010, 13 (03) : 281 - 297
  • [10] An overview of recovery models and algorithms for real-time railway rescheduling
    Cacchiani, Valentina
    Huisman, Dennis
    Kidd, Martin
    Kroon, Leo
    Toth, Paolo
    Veelenturf, Lucas
    Wagenaar, Joris
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2014, 63 : 15 - 37