Rescheduling Unreliable Service Providers in a Dynamic Multi-objective Cloud Manufacturing

被引:1
作者
Fazeli, M. M. [1 ]
Farjami, Y. [1 ]
Bidgoly, A. Jalaly [1 ]
机构
[1] Univ Qom, Dept Comp & IT, Qom, Iran
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2023年 / 36卷 / 07期
关键词
Cloud Manufacturing; Dynamic Rescheduling Problem; Multi-objective Optimization; Rescheduling Unreliable Service; OPTIMIZATION; ALGORITHM; RESOURCE; MODEL;
D O I
10.5829/ije.2023.36.07a.12
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Cloud manufacturing (CMfg) is a new advanced manucatring model developed with the help of enterprise information technologies under the support of cloud computing, Internet of Things and service-based technologies. CMfg compose multiple manufacturing resources to provide efficient and valuable services. CMfg has a highly dynamic environment. In this environment, many disruptions or events may occur that lead the system to unplanned situations. In CMfg, a series of service providers are scheduled for production. During the production operation, some of them may be damaged, stopped, and out of service. Therefore, rescheduling is necessary for the continuation of the production process according to the concluded contracts and initial schedule. When any disruptions or other events occurred, the rescheduling techniques used to updating the inital schedule. In this paper, the dynamic rescheduling problem in CMfg is analyzed. Then the multi-objective rescheduling in CMfg is modeled and defined as a multi-objective optimization problem. Defining this problem as a multi-objective optimization problem provides the possibility of applying, checking and comparing different algorithms. For solving this problem, previous optimization methods have improved and a multi-objective and elitist algorithm based on the Jaya algorithm, called advanced multi-objective elitist Jaya algorithm (AMEJ) is proposed. Several experiments have been conducted to verify the performance of the proposed algorithm. Computational results showed that the proposed algorithm performs better compared to other multi -objective optimization algorithms.
引用
收藏
页码:1310 / 1321
页数:12
相关论文
共 41 条
[11]   Workload-based multi-task scheduling in cloud manufacturing [J].
Liu, Yongkui ;
Xu, Xun ;
Zhang, Lin ;
Wang, Long ;
Zhong, Ray Y. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2017, 45 :3-20
[12]   A multi-objective service composition recommendation method for individualized customer: Hybrid MPA-GSO-DNN model [J].
Liu, Zhengchao ;
Guo, Shunsheng ;
Wang, Lei ;
Du, Baigang ;
Pang, Shibao .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 128 :122-134
[13]   Operating Room Scheduling Optimization Based on a Fuzzy Uncertainty Approach and Metaheuristic Algorithms [J].
Maghzi, P. ;
Mohammadi, M. ;
Pasandideh, S. H. R. ;
Naderi, B. .
INTERNATIONAL JOURNAL OF ENGINEERING, 2022, 35 (02) :258-275
[14]   A Constraint Programming Approach to Solve Multi-skill Resource-constrained Project Scheduling Problem with Calendars [J].
Nikaeen, R. ;
Najafi, A. A. .
INTERNATIONAL JOURNAL OF ENGINEERING, 2022, 35 (08) :1579-1587
[15]   Generator Scheduling Optimization Involving Emission to Determine Emission Reduction Costs [J].
Puspitasari, K. M. D. ;
Raharjo, J. ;
Sastrosubroto, A. S. ;
Rahmat, B. .
INTERNATIONAL JOURNAL OF ENGINEERING, 2022, 35 (08) :1-11
[16]   Reactive Scheduling Addressing Unexpected Disturbance in Cellular Manufacturing Systems [J].
Rahimi, V ;
Arkat, J. ;
Farughi, H. .
INTERNATIONAL JOURNAL OF ENGINEERING, 2021, 34 (01) :162-170
[17]   Teaching-learning-based optimization: A novel method for constrained mechanical design optimization problems [J].
Rao, R. V. ;
Savsani, V. J. ;
Vakharia, D. P. .
COMPUTER-AIDED DESIGN, 2011, 43 (03) :303-315
[18]  
Rao R.V., 2019, Jaya: An Advanced Optimization Algorithm and Its Engineering Applications
[19]   A multi-objective algorithm for optimization of modern machining processes [J].
Rao, R. Venkata ;
Rai, Dhiraj P. ;
Balic, Joze .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2017, 61 :103-125
[20]  
Rashidifar R., 2022, FLEXIBLE AUTOMATION, P197