Peak operation optimization of cascade hydropower reservoirs and solar power plants considering output forecasting uncertainty

被引:13
|
作者
Feng, Zhong-kai [1 ,2 ]
Huang, Qing-qing [2 ]
Niu, Wen-jing [3 ]
Su, Hua-ying [4 ]
Li, Shu-shan [5 ]
Wu, Hui-jun [5 ]
Wang, Jia-yang [6 ]
机构
[1] Hohai Univ, Natl Key Lab Water Disaster Prevent, Nanjing 210098, Peoples R China
[2] Hohai Univ, Coll Hydrol & Water Resources, Nanjing 210098, Peoples R China
[3] ChangJiang Water Resources Commiss, Bur Hydrol, Wuhan 430010, Peoples R China
[4] Guizhou Power Grid Co Ltd, Power Dispatching Control Ctr, Guiyang 550499, Guizhou, Peoples R China
[5] China Southern Power Grid, Power Dispatching & Control Ctr, Guangzhou 510663, Peoples R China
[6] China Southern Power Grid, Power Res Inst, Guangzhou 510080, Peoples R China
基金
中国国家自然科学基金;
关键词
Hydropower-solar complementary operation; Solar output scenario generation; Principal component analysis; Cooperation search algorithm; SHAVING OPERATION; WIND; HYBRID; SYSTEM; MODEL; COMPLEMENTARITY;
D O I
10.1016/j.apenergy.2023.122533
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
With the rapid development and utilization of hydropower and photovoltaic energy, the complementary operation of hydropower and solar power has become one of the research hotspots in the electric power system. However, the uncertainty of photovoltaic energy output significantly increases the difficulty of the complementary operation. This study focuses on the peak operation optimization of cascade hydropower reservoirs and solar power plants considering output forecasting uncertainty. Firstly, through principal component analysis and pattern clustering, the forecasting errors of historical dataset are used to generate typical solar output scenarios. Secondly, an efficient cooperation search algorithm is used to minimize the variance of the residual load series, taking into account the occurrence probabilities of solar output scenarios. Finally, the maximum value, peakvalley difference, standard deviation and load rate of the residual load are selected as the performance evaluation indexes. The peak load regulation ability of the proposed method is tested under different typical solar output scenarios. The results demonstrate that the proposed method can scientifically find the scheduling plan of hydropower-solar complementary system, reducing the photovoltaic energy integration risk.
引用
收藏
页数:18
相关论文
共 24 条
  • [1] Cooperation Search Algorithm for Power Generation Production Operation Optimization of Cascade Hydropower Reservoirs
    Niu, Wen-jing
    Feng, Zhong-kai
    Li, Yu-rong
    Liu, Shuai
    WATER RESOURCES MANAGEMENT, 2021, 35 (08) : 2465 - 2485
  • [2] Cooperation Search Algorithm for Power Generation Production Operation Optimization of Cascade Hydropower Reservoirs
    Wen-jing Niu
    Zhong-kai Feng
    Yu-rong Li
    Shuai Liu
    Water Resources Management, 2021, 35 : 2465 - 2485
  • [3] Cascade hydropower plants operation considering comprehensive ecological water demands
    Zhang, Hongxue
    Chang, Jianxia
    Gao, Chao
    Wu, Hongshi
    Wang, Yimin
    Lei, Kaixuan
    Long, Ruihao
    Zhang, Lianpeng
    ENERGY CONVERSION AND MANAGEMENT, 2019, 180 : 119 - 133
  • [4] Short-term optimal scheduling of cascade hydropower plants shaving peak load for multiple power grids
    Wang, Peilin
    Yuan, Wenlin
    Su, Chengguo
    Wu, Yang
    Lu, Lu
    Yan, Denghua
    Wu, Zening
    RENEWABLE ENERGY, 2022, 184 : 68 - 79
  • [5] Optimal power peak shaving using hydropower to complement wind and solar power uncertainty
    Liu, Benxi
    Lund, Jay R.
    Liao, Shengli
    Jin, Xiaoyu
    Liu, Lingjun
    Cheng, Chuntian
    ENERGY CONVERSION AND MANAGEMENT, 2020, 209
  • [6] Multi-strategy gravitational search algorithm for constrained global optimization in coordinative operation of multiple hydropower reservoirs and solar photovoltaic power plants
    Niu, Wen-jing
    Feng, Zhong-kai
    Liu, Shuai
    APPLIED SOFT COMPUTING, 2021, 107
  • [7] Operation of pumped storage hydropower plants through optimization for power systems
    Alvarez, Gonzalo E.
    ENERGY, 2020, 202
  • [8] A multi-objective cooperation search algorithm for cascade reservoirs operation optimization considering power generation and ecological flows
    Feng, Zhong-kai
    Zhang, Li
    Mo, Li
    Wang, Yong-qiang
    Niu, Wen-jing
    APPLIED SOFT COMPUTING, 2024, 150
  • [9] Optimization of Operation Strategy of Virtual Power Plants Involved in Peak Shaving
    Yun, Qiuchen
    Gao, Wenzhong
    Zhang, Fang
    Cheng, Lin
    Tian, Liting
    PROCEEDINGS OF 2019 IEEE 3RD INTERNATIONAL ELECTRICAL AND ENERGY CONFERENCE (CIEEC), 2019, : 1786 - 1791
  • [10] Day-ahead forecasting of solar power output from photovoltaic plants in the American Southwest
    Larson, David P.
    Nonnenmacher, Lukas
    Coimbra, Carlos F. M.
    RENEWABLE ENERGY, 2016, 91 : 11 - 20