A probabilistic framework for post-disaster recovery modeling of buildings and electric power networks in developing countries

被引:19
作者
Opabola, Eyitayo A. [1 ,2 ]
Galasso, Carmine [1 ]
机构
[1] UCL, Dept Civil Environm & Geomat Engn, London, England
[2] Univ Calif Berkeley, Dept Civil & Environm Engn, Berkeley, CA 94720 USA
基金
英国科研创新办公室;
关键词
Post-earthquake recovery; Developing countries; Resilience; Electric power networks; Decision support; CRITICAL INFRASTRUCTURE; FUNCTIONALITY RECOVERY; GROUND MOTION; RESILIENCE; PERFORMANCE; EARTHQUAKE; STRATEGY;
D O I
10.1016/j.ress.2023.109679
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Post-disaster recovery is a significant challenge, especially in developing countries. Various technical, environmental, socioeconomic, political, and cultural factors substantially influence post-disaster recovery. As a result, methodologies relevant in developed nations may not be directly applicable in Global South contexts. This study introduces a probabilistic framework for modeling the post-disaster recovery of buildings and electric power networks (EPNs) in developing countries. The proposed framework combines an asset-level assessment of individual buildings with a community-level assessment of EPNs to evaluate a building portfolio's post-event functionality state. As part of the framework, a stochastic network analysis is proposed to estimate the recovery time of damaged buildings while accounting for technical, environmental, socioeconomic, political, and cultural factors, quantified using empirical data gathered from past events. A probabilistic modeling approach is proposed to quantify the EPN's initial post-event outage levels. Empirical formulations for estimating the recovery time of an EPN as a function of its initial post-event outage levels are calibrated using post-event data from developing countries. A case study is presented to illustrate the application of the proposed framework to model the post-earthquake recovery of a synthetic low-income residential community. The analysis shows that negative technical, environmental, socioeconomic, political, and cultural factors could amplify the reconstruction time of damaged buildings by a factor of almost three. The proposed framework can support decision-makers in disaster planning and management strategies for vulnerable low-income communities.
引用
收藏
页数:15
相关论文
共 94 条
[1]  
ADB, 2007, Proposed Loan for the Reconstruction of the Cement Production Facility in Aceh
[2]  
ADB, 2009, Earthquake and Tsunami Emergency Support Project (ETESP) - Indonesia
[3]   Community resilience assessment via agent-based modeling approach [J].
Aghababaei, Mohammad ;
Koliou, Maria .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2023, 38 (07) :920-939
[4]   Validation of Time-Dependent Repair Recovery of the Building Stock Following the 2011 Joplin Tornado [J].
Aghababaei, Mohammad ;
Koliou, Maria ;
Pilkington, Stephanie ;
Mahmoud, Hussam ;
van de Lindt, John W. ;
Curtis, Andrew ;
Smith, Steve ;
Ajayakumar, Jayakrishnan ;
Watson, Maria .
NATURAL HAZARDS REVIEW, 2020, 21 (04)
[5]   On the December 26, 2003, southeastern Iran earthquake in Bam region [J].
Ahmadizadeh, M ;
Shakib, H .
ENGINEERING STRUCTURES, 2004, 26 (08) :1055-1070
[6]  
AIR, 2021, Demand Surge Perspective on European Extratropical Cyclones
[7]   Community structure recovery optimization for partial disruption, functionality, and restoration in interdependent networks* [J].
Almoghathawi, Yasser ;
Selim, Shokri ;
Barker, Kash .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 229
[8]  
Almufti I., 2013, The resilience-based earthquake design initiative (REDiTM) rating system, P1
[9]   A model for the seismic reliability assessment of electric power transmission systems [J].
Ang, AHS ;
Pires, JA ;
Villaverde, R .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1996, 51 (01) :7-22
[10]  
[Anonymous], 2012, SEISMIC PERFORMANCE