Bi-Objective Integrated Scheduling of Quay Cranes and Automated Guided Vehicles

被引:12
作者
Duan, Yating [1 ,2 ]
Ren, Hongxiang [1 ,2 ]
Xu, Fuquan [1 ,2 ]
Yang, Xiao [1 ]
Meng, Yao [1 ,2 ]
机构
[1] Dalian Maritime Univ, Navigat Coll, Dalian 116026, Peoples R China
[2] Dalian Maritime Univ, Key Lab Marine Simulat & Control, Dalian 116026, Peoples R China
基金
美国国家科学基金会;
关键词
multi-objective; NSGA-II algorithm; integrated scheduling; quay cranes; automated guided vehicles; CONTAINER; ASSIGNMENT; TRUCK; OPTIMIZATION; EQUIPMENT; ALGORITHM; BRANCH;
D O I
10.3390/jmse11081492
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
Operational efficiency is one of the key performance indicators of a port's service level. In the process of making scheduling plans for container terminals, different types of equipment are usually scheduled separately. The interaction between quay cranes (QCs) and automated guided vehicles (AGVs) is neglected, which results in low operational efficiency. This research explores the integrated scheduling problem of QCs and AGVs. Firstly, a multi-objective mixed integer programming model (MOMIP) is conducted, with the aim of minimizing the makespan of vessels and the unladen time of AGVs. Then, embedded with a new heuristic method, the non-dominated sorting genetic algorithm-II (NSGA-II) is designed for the scheduling problem. The heuristic method includes two parts: a bay-based QC allocation strategy and a container-based QC-AGV scheduling strategy. Finally, in order to test the performance of the proposed algorithm, differently sized benchmark tests are performed, and the results are compared to the multi-objective particle swarm optimization algorithm (MOPSO) and the weighted-sum method. The computational results indicate that the proposed algorithm can effectively solve the multi-objective integrated scheduling problem of QCs and AGVs. For large-scale problems, the NSGA-II algorithm has better performance and more obvious advantages compared to others. The proposed method has the capability of providing a theoretical reference for the QC and AGV scheduling of container terminals.
引用
收藏
页数:19
相关论文
共 46 条
[11]  
3.0.CO
[12]  
2-6]
[13]   THE CRANE SCHEDULING PROBLEM [J].
DAGANZO, CF .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1989, 23 (03) :159-175
[14]   Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem [J].
Dang Cong Hop ;
Nguyen Van Hop ;
Truong Tran Mai Anh .
COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 153
[15]   Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption [J].
He, Junliang ;
Huan, Youfang ;
Yan, Wei ;
Wang, Shuaian .
EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (05) :2464-2487
[16]   A simulation optimization method for internal trucks sharing assignment among multiple container terminals [J].
He, Junliang ;
Zhang, Weimin ;
Huang, Youfang ;
Yan, Wei .
ADVANCED ENGINEERING INFORMATICS, 2013, 27 (04) :598-614
[17]  
Homayouni M., 2010, P 11 ASIA PACIFIC IN
[18]   A Hybrid Genetic-Heuristic Algorithm for Scheduling of Automated Guided Vehicles and Quay Cranes in Automated Container Terminals [J].
Homayouni, S. M. ;
Tang, S. H. ;
Ismail, N. ;
Ariffin, M. K. A. M. ;
Samin, R. .
CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, :96-101
[19]   Flexible ship loading problem with transfer vehicle assignment and scheduling [J].
Iris, Cagatay ;
Christensen, Jonas ;
Pacino, Dario ;
Ropke, Stefan .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2018, 111 :113-134
[20]  
Jiajuan Chen, 2020, IOP Conference Series: Materials Science and Engineering, V790, DOI 10.1088/1757-899X/790/1/012071