Bi-Objective Integrated Scheduling of Quay Cranes and Automated Guided Vehicles

被引:9
作者
Duan, Yating [1 ,2 ]
Ren, Hongxiang [1 ,2 ]
Xu, Fuquan [1 ,2 ]
Yang, Xiao [1 ]
Meng, Yao [1 ,2 ]
机构
[1] Dalian Maritime Univ, Navigat Coll, Dalian 116026, Peoples R China
[2] Dalian Maritime Univ, Key Lab Marine Simulat & Control, Dalian 116026, Peoples R China
基金
美国国家科学基金会;
关键词
multi-objective; NSGA-II algorithm; integrated scheduling; quay cranes; automated guided vehicles; CONTAINER; ASSIGNMENT; TRUCK; OPTIMIZATION; EQUIPMENT; ALGORITHM; BRANCH;
D O I
10.3390/jmse11081492
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
Operational efficiency is one of the key performance indicators of a port's service level. In the process of making scheduling plans for container terminals, different types of equipment are usually scheduled separately. The interaction between quay cranes (QCs) and automated guided vehicles (AGVs) is neglected, which results in low operational efficiency. This research explores the integrated scheduling problem of QCs and AGVs. Firstly, a multi-objective mixed integer programming model (MOMIP) is conducted, with the aim of minimizing the makespan of vessels and the unladen time of AGVs. Then, embedded with a new heuristic method, the non-dominated sorting genetic algorithm-II (NSGA-II) is designed for the scheduling problem. The heuristic method includes two parts: a bay-based QC allocation strategy and a container-based QC-AGV scheduling strategy. Finally, in order to test the performance of the proposed algorithm, differently sized benchmark tests are performed, and the results are compared to the multi-objective particle swarm optimization algorithm (MOPSO) and the weighted-sum method. The computational results indicate that the proposed algorithm can effectively solve the multi-objective integrated scheduling problem of QCs and AGVs. For large-scale problems, the NSGA-II algorithm has better performance and more obvious advantages compared to others. The proposed method has the capability of providing a theoretical reference for the QC and AGV scheduling of container terminals.
引用
收藏
页数:19
相关论文
共 43 条
[1]   Synchronized scheduling model for container terminals using simulated double-cycling strategy [J].
Ahmed, Essmeil ;
El-Abbasy, Mohammed S. ;
Zayed, Tarek ;
Alfalah, Ghasan ;
Alkass, Sabah .
COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 154
[2]   The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints [J].
Al-Dhaheri, Noura ;
Jebali, Aida ;
Diabat, Ali .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 94 :230-244
[3]   The Quay Crane Scheduling Problem [J].
Al-Dhaheri, Noura ;
Diabat, Ali .
JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 :87-94
[4]  
Cao Jinxin, 2010, Tsinghua Science and Technology, V15, P467, DOI 10.1016/S1007-0214(10)70089-4
[5]   Simulation-optimization for the management of the transshipment operations at maritime container terminals [J].
Castilla-Rodriguez, Ivan ;
Exposito-Izquierdo, Christopher ;
Melian-Batista, Belen ;
Aguilar, Rosa M. ;
Moreno-Vega, J. Marcos .
EXPERT SYSTEMS WITH APPLICATIONS, 2020, 139
[6]   The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion [J].
Chen, Jiang Hang ;
Bierlaire, Michel .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 260 (02) :613-624
[7]   A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal [J].
Chen, Lu ;
Bostel, Nathalie ;
Dejax, Pierre ;
Cai, Jianguo ;
Xi, Lifeng .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (01) :40-58
[8]   Integrated scheduling of crane handling and truck transportation in a maritime container terminal [J].
Chen, Lu ;
Langevin, Andre ;
Lu, Zhiqiang .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 225 (01) :142-152
[9]  
Czyzzak P., 1998, J MULTICRIT DECIS AN, V7, P34
[10]   THE CRANE SCHEDULING PROBLEM [J].
DAGANZO, CF .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1989, 23 (03) :159-175