Integrated planning of maintenance operations and workload allocation

被引:2
作者
Rodoplu, Melek [1 ]
Dauzere-Peres, Stephane [1 ,2 ]
Vialletelle, Philippe [3 ]
机构
[1] Univ Clermont Auvergne, Mines St Etienne, CNRS, UMR LIMOS 6158, Gardanne, France
[2] BI Norwegian Business Sch, Dept Accounting & Operat Management, Oslo, Norway
[3] STMicroelectronics, Crolles, France
关键词
Maintenance; workload allocation; planning; mathematical modelling; EXTENDED EMQ MODEL; PREVENTIVE MAINTENANCE; SAFETY STOCKS; PRODUCTION SYSTEM; MACHINE; SCHEDULE; OPTIMIZATION;
D O I
10.1080/00207543.2023.2168083
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Motivated by a practical problem, this paper investigates the integrated planning of maintenance operations and workload allocation on a set of machines in a workshop. Given quantities of products to be produced per period on a planning horizon must be processed on unrelated flexible machines. Moreover, each machine has to undergo one or more maintenance operations that must be planned within a given time window and impact products differently. The main goal is to find a feasible plan that satisfies the machine capacity by allocating the production quantities to machines and assigning maintenance operations as late as possible in their time windows. Various original mathematical models are presented. In particular, we propose models that allow maintenance operations and some production quantities to overlap two consecutive periods. Computational experiments based on industrial data show that allowing this overlapping helps the earliness of maintenance operations to be significantly reduced in the most difficult instances, going for example from a total of 14 periods to only 1 period, and by more than 35% on average.
引用
收藏
页码:8291 / 8308
页数:18
相关论文
共 41 条
[1]   A simple approximation of the EMQ model with Poisson machine failures [J].
Abboud, NE .
PRODUCTION PLANNING & CONTROL, 1997, 8 (04) :385-397
[2]   An integrated production and preventive maintenance planning model [J].
Aghezzaf, E. H. ;
Jamali, M. A. ;
Ait-Kadi, D. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (02) :679-685
[3]   Integrated production planning and preventive maintenance in deteriorating production systems [J].
Aghezzaf, El-Houssaine ;
Najid, Najib M. .
INFORMATION SCIENCES, 2008, 178 (17) :3382-3392
[4]   Lagrangian relaxation based heuristic for an integrated production and maintenance planning problem [J].
Alaoui-Selsouli, M. ;
Mohafid, A. ;
Najid, N. M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (13) :3630-3642
[5]   The economic production lot-sizing problem with imperfect production processes and imperfect maintenance [J].
Ben-Daya, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 76 (03) :257-264
[6]   Timed route approaches for large multi-product multi-step capacitated production planning problems [J].
Beraudy, Sebastien ;
Absi, Nabil ;
Dauzere-Peres, Stephane .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 300 (02) :602-614
[7]  
Budai G, 2008, SPRINGER SER RELIAB, P321, DOI 10.1007/978-1-84800-011-7_13
[8]   Optimal production, maintenance and lockout/tagout control policies in manufacturing systems [J].
Charlot, E. ;
Kenne, J. P. ;
Nadeau, S. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 107 (02) :435-450
[9]   Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system [J].
Chelbi, Anis ;
Rezg, Nidhal ;
Radhoui, Mehdi .
JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2008, 14 (02) :161-+
[10]  
Cheung KL, 1997, NAV RES LOG, V44, P257, DOI 10.1002/(SICI)1520-6750(199704)44:3<257::AID-NAV2>3.0.CO