Unrelated parallel machine scheduling under machine availability and eligibility constraints to minimize the makespan of non-resumable jobs

被引:4
作者
Kurt, A. [1 ]
Cetinkaya, F. C. [2 ]
机构
[1] Alanya Alladdin Keykubat Univ, Ind Engn Dept, Antalya, Turkiye
[2] Cankaya Univ, Ind Engn Dept, Ankara, Turkiye
来源
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT | 2024年 / 15卷 / 01期
关键词
Scheduling; Unrelated parallel machines; Machine availability and eligibility constraints; Non-resumable jobs; Makespan; Mixed integer linear programming; PRECEDENCE CONSTRAINTS; MAINTENANCE; TIME;
D O I
10.24867/IJIEM-2024-1-345
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study considers the scheduling problem of multiple independent and non-resumable jobs on unrelated parallel machines subject to machine availability and eligibility constraints. For each machine, there is a maximum continuous working time due to an unavailable period required for maintenance or tool changeover so that multiple unavailable periods on each machine may occur. The start time of an unavailable period on each machine is flexible and depends on the sum of the processing times of all jobs completed before this unavailability period. The objective is to minimize the makespan, which is the time to complete the processing of all non-resumable jobs. We develop a mixed integer linear programming (MILP) model to solve the problem optimally and a heuristic algorithm to solve the problem instances for which the MILP model cannot achieve an optimal solution in a reasonable allowed solution time. Computational experiments are done to evaluate our solution approaches' performance in terms of quality and time. The results show that using a mixed integer linear programming model is not a practical alternative, especially for large -sized problem instances. However, the proposed heuristic algorithm finds near -optimal solutions in a very short time.
引用
收藏
页码:18 / 33
页数:16
相关论文
共 54 条
[1]   Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions [J].
Afzalirad, Mojtaba ;
Rezaeian, Javad .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 98 :40-52
[2]   Scheduling with tool changes to minimize total completion time: Basic results and SPT performance [J].
Akturk, MS ;
Ghosh, JB ;
Gunes, ED .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 157 (03) :784-790
[3]   Rescheduling of identical parallel machines under machine eligibility constraints [J].
Alagöz, O ;
Azizoglu, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (03) :523-532
[4]   Including preventive maintenance activities in an unrelated parallel machine environment with dependent setup times [J].
Avalos-Rosales, Oliver ;
Angel-Bello, Francisco ;
Alvarez, Ada ;
Cardona-Valdes, Yajaira .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 123 :364-377
[5]  
Baker K., 1974, INTRO SEQUENCING SCH
[6]   Single machine scheduling with preventive maintenances [J].
Batun, S. ;
Azizolu, M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (07) :1753-1771
[7]   Makespan minimization for parallel machine scheduling of semi-resumable and non-resumable jobs with multiple availability constraints [J].
Beaton, Clifford ;
Diallo, Claver ;
Gunn, Eldon .
INFOR, 2016, 54 (04) :305-316
[8]   Scheduling preemptable tasks on parallel processors with limited availability [J].
Blazewicz, J ;
Drozdowski, M ;
Formanowicz, P ;
Kubiak, W ;
Schmidt, G .
PARALLEL COMPUTING, 2000, 26 (09) :1195-1211
[9]   Parallel machine scheduling with release time and machine eligibility restrictions [J].
Centeno, G ;
Armacost, RL .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (1-2) :273-276
[10]   The worst-case analysis of the MULTIFIT algorithm for scheduling nonsimultaneous parallel machines [J].
Chang, SY ;
Hwang, HC .
DISCRETE APPLIED MATHEMATICS, 1999, 92 (2-3) :135-147