Risk analysis in underground tunnel construction with tunnel boring machines using the Best-Worst method and data envelopment analysis

被引:7
|
作者
Koohathongsumrit, Nitidetch [1 ]
Meethom, Warapoj [2 ]
机构
[1] Ramkhamhang Univ, Fac Sci, Dept Stat, 2086 Ramkhamhaeng Rd, Bangkok 10240, Thailand
[2] King Mongkuts Univ Technol North Bangkok, Fac Engn, Dept Ind Engn, 1518 Pracharat 1 Rd, Bangkok 10800, Thailand
关键词
Metro construction; Multiple criteria decision -making; Risk assessment; Tunnel boring machine; Underground work; FUZZY-LOGIC; SUSTAINABILITY; RANKING; CHINA;
D O I
10.1016/j.heliyon.2023.e23486
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Background: The use of tunnel boring machines is continuously increasing; however, this activity faces many risks, resulting in negative events.Methods: A novel approach using the best-worst method and a data envelopment analysis model was proposed to analyze the risks of underground tunnel construction with tunnel boring machines. The proposed approach was validated using a realistic case study of metro construction in Thailand.Results: The proposed approach efficiently analyzed the risks and produced more solid findings. The most critical and least affected risks can be identified according to risk scores in descending order. Implication: This study contributes a new method of risk analysis that benefits project managers and stakeholders who design risk management plans to reduce the occurrence and mitigate the severity of metro works.Originality: The new risk analysis can obtain the best compromise ranking of risks based on decision-makers' preferences, probabilities, and various consequences under different circumstances.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Embedding Best-Worst Method into Data Envelopment Analysis
    Yu, Yu
    Khezrimotlag, Dariush
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2024, 41 (01)
  • [2] Risk Analysis of Underground Tunnel Construction with Tunnel Boring Machine by Using Fault Tree Analysis and Fuzzy Analytic Hierarchy Process
    Koohathongsumrit, Nitidetch
    Chankham, Wasana
    SAFETY, 2024, 10 (03)
  • [3] A simplified 3D model for tunnel construction using tunnel boring machines
    Mroueh, H.
    Shahrour, I.
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2008, 23 (01) : 38 - 45
  • [4] Predicting the performance of tunnel boring machines using big operational data
    Zhang, Qianli
    Liu, Zhenyu
    Tan, Jianrong
    2020 IEEE SIXTH INTERNATIONAL CONFERENCE ON BIG DATA COMPUTING SERVICE AND APPLICATIONS (BIGDATASERVICE 2020), 2020, : 180 - 183
  • [5] A maturity model for assessing Industry 4.0 implementation using data envelopment analysis and best and worst method approaches
    Abdullah, Ahmad
    Saraswat, Shantanu
    Talib, Faisal
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2024,
  • [6] A rough-fuzzy approach integrating best-worst method and data envelopment analysis to multi-criteria selection of smart product service module
    Chen, Zhihua
    Ming, Xinguo
    APPLIED SOFT COMPUTING, 2020, 94
  • [7] Green operations management for sustainable development: An explicit analysis by using fuzzy best-worst method
    Gupta, Priyanshi
    Chawla, V. K.
    Jain, Vineet
    Angra, Surjit
    DECISION SCIENCE LETTERS, 2022, 11 (03) : 357 - 366
  • [8] A two-stage group stochastic preference analysis based on best-worst method
    Dai, Ning
    Zhou, Ligang
    Wu, Qun
    APPLIED INTELLIGENCE, 2024, 54 (22) : 11233 - 11247
  • [9] Reliability Analysis of Full-Face Tunnel Boring Machines with the Monte Carlo Simulation Technique
    Mikaeil, Reza
    Khoshalan, Hasel Amini
    Nasrollahi, Mohammad Hossein
    Esmaeilzadeh, Akbar
    RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2022, 37 (03): : 149 - 160
  • [10] Coupling Analysis of Tunnel Construction Risk in Complex Geology and Construction Factors
    Guo, Desai
    Song, Zhanping
    Xu, Tian
    Zhang, Yuwei
    Ding, Libo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (09)