A problem-specific knowledge based artificial bee colony algorithm for scheduling distributed permutation flowshop problems with peak power consumption

被引:8
作者
Li, Yuan-Zhen [1 ]
Gao, Kaizhou [2 ]
Meng, Lei-Lei [1 ]
Suganthan, Ponnuthurai Nagaratnam [3 ]
机构
[1] Liaocheng Univ, Sch Comp Sci, Liaocheng 252000, Peoples R China
[2] Macau Univ Sci & Technol, Inst Syst Engn, Taipa 999078, Macao, Peoples R China
[3] Qatar Univ, KINDI Ctr, Doha, Qatar
基金
中国国家自然科学基金;
关键词
Distributed permutation flowshop scheduling; Peak power consumption; Makespan; Artificial bee colony algorithm; MINIMIZING MAKESPAN; SEARCH ALGORITHM; TOTAL FLOWTIME; SHOP; OPTIMIZATION; METAHEURISTICS;
D O I
10.1016/j.engappai.2023.107011
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A distributed permutation flowshop scheduling problem (DPFSP) with peak power consumption is addressed in this work. The instantaneous energy consumption of each factory cannot exceed a threshold. First, a mathematical model is developed to describe the concerned problem. Second, an improved artificial bee colony (IABC) algorithm is proposed. Based on problem-specific knowledge, three new solution generation operators, e.g., shift, swap, and speed adjust, are designed for employ bees and onlooker bees. A local search operation is developed to improve the quality of current best-known solution in each iteration. 450 instances are solved to evaluate the performance of IABC via comparing to seven state-of-the-art algorithms. The average relative percentage increase (ARPI) of IABC ranks 1 among all compared algorithms. The results and discussions show that the proposed IABC algorithm has strong competitiveness for solving the DPFSP with peak power consumption.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] An effective fruit fly optimization algorithm for the distributed permutation flowshop scheduling problem with total flowtime
    Guo, Heng-Wei
    Sang, Hong-Yan
    Zhang, Xu-Jin
    Duan, Peng
    Li, Jun-Qing
    Han, Yu-Yan
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 123
  • [22] A cooperative population-based iterated greedy algorithm for distributed permutation flowshop group scheduling problem
    Zhao, Hui
    Pan, Quan-Ke
    Gao, Kai-Zhou
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 125
  • [23] Problem-specific knowledge MOEA/D for energy-efficient scheduling of distributed permutation flow shop in heterogeneous factories
    Luo, Cong
    Gong, Wenyin
    Li, Rui
    Lu, Chao
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 123
  • [24] A hybrid genetic algorithm for the distributed permutation flowshop scheduling problem
    Gao, Jian
    Chen, Rong
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2011, 4 (04) : 497 - 508
  • [25] Multi-Objective Home Health Care Routing and Scheduling With Sharing Service via a Problem-Specific Knowledge-Based Artificial Bee Colony Algorithm
    Fu, YaPing
    Ma, XiaoMeng
    Gao, KaiZhou
    Li, ZhiWu
    Dong, HongYu
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2024, 25 (02) : 1706 - 1719
  • [26] An improved iterated greedy algorithm for the distributed assembly permutation flowshop scheduling problem
    Huang, Ying-Ying
    Pan, Quan-Ke
    Huang, Jiang-Ping
    Suganthan, P. N.
    Gao, Liang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 152
  • [27] An improved artificial bee colony algorithm for distributed heterogeneous hybrid flowshop scheduling problem with sequence-dependent setup times
    Li, Yingli
    Li, Xinyu
    Gao, Liang
    Meng, Leilei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 147
  • [28] An efficient tabu search algorithm for the distributed permutation flowshop scheduling problem
    Gao, Jian
    Chen, Rong
    Deng, Wu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (03) : 641 - 651
  • [29] Artificial bee colony algorithm including some components of iterated greedy algorithm for permutation flow shop scheduling problems
    Arik, Oguzhan Ahmet
    NEURAL COMPUTING & APPLICATIONS, 2021, 33 (08) : 3469 - 3486
  • [30] A Hybrid Genetic Algorithm for the Distributed Permutation Flowshop Scheduling Problem
    Li, Yan
    Chen, Zhigang
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND MANAGEMENT INNOVATION, 2015, 28 : 843 - 847