Mechanical behavior and track geometry evaluation of long-span cable-stayed bridges with ballastless tracks

被引:2
作者
Zhu, Zhihui [1 ,2 ]
Ren, Zengzhen [2 ]
Zheng, Weiqi [1 ,2 ]
Liu, Wenshuo [1 ,2 ]
Li, Diping [3 ]
Ma, Guang [4 ]
机构
[1] Cent South Univ, Natl Engn Res Ctr High Speed Railway Construct Tec, Changsha, Peoples R China
[2] Cent South Univ, Sch Civil Engn, Changsha, Peoples R China
[3] China Railway Siyuan Survey & Design Grp Co Ltd, Wuhan, Peoples R China
[4] Third Railway Survey & Design Inst Grp Corp, Tianjin, Peoples R China
基金
中国国家自然科学基金;
关键词
Ballastless track; cable-stayed bridge; high-speed railways; track-bridge interaction; track geometry; vehicle-bridge coupling vibration; COUPLING MODEL; SLAB;
D O I
10.1080/15732479.2024.2320694
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Ballastless tracks have been widely used in China's high-speed railways; however, they have only recently been laid on 300 m-class cable-stayed bridges. For cable-stayed bridges with a longer span, the mechanical behavior of ballastless tracks is unclear, and the track construction acceptance method is incomplete, restricting the development of cable-stayed bridges with ballastless tracks. Taking four 300-1000 m-class cable-stayed bridges as research objects, this study established static track-bridge interaction models and dynamic vehicle-bridge coupled models. By evaluating static and dynamic indices, the feasibility of laying ballastless tracks and operating high-speed trains at 350 km/h on cable-stayed bridges was analyzed. Based on the results of dynamic analysis and track geometry evaluation, a 40 m chord was proposed for track geometry acceptance on cable-stayed bridges. The accuracy of the simulation results was verified through the measured data from the Xi-Cheng Railway. The numerical results showed that the 300-1000 m-class cable-stayed bridges with ballastless tracks had good static and dynamic characteristics. The 300 m baseline was unsuitable for the long-wave irregularity evaluation of tracks on cable-stayed bridges, and the 60 m chord was easily affected by wavelengths above 200 m, leading to misjudgment of the evaluation results. The 5 mm limits of the 40 m chord could be used for track geometry acceptance on cable-stayed bridges. Finally, a comprehensive evaluation method for track geometry, namely 10 m chord, 40 m chord, and minimum vertical curve radius, was formed.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] A study of vibration reduction structural system of long-span cable-stayed bridges
    Xu, XL
    Liu, WQ
    Wang, RG
    Wang, ZF
    Wu, WS
    Wu, XL
    PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON EARTHQUAKE ENGINEERING: NEW FRONTIER AND RESEARCH TRANSFORMATION, 2004, : 529 - 534
  • [22] Safety assessment method of inclined cables for long-span cable-stayed bridges
    Huang, Juan
    Wang, Ronghui
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON HEALTH MONITORING OF STRUCTURE, MATERIALS AND ENVIRONMENT, VOLS 1 AND 2, 2007, : 253 - 257
  • [23] Study on The Mechanical and Economic Performance of Super Long-Span Cable-Stayed Bridges with UHPC-Girder
    Zubin Ai
    Hangjun Liu
    Jiaguo Zhang
    Chao Zhang
    Cong Wang
    Zuqian Jiang
    Rucheng Xiao
    KSCE Journal of Civil Engineering, 2023, 27 : 4744 - 4761
  • [24] Study on The Mechanical and Economic Performance of Super Long-Span Cable-Stayed Bridges with UHPC-Girder
    Ai, Zubin
    Liu, Hangjun
    Zhang, Jiaguo
    Zhang, Chao
    Wang, Cong
    Jiang, Zuqian
    Xiao, Rucheng
    KSCE JOURNAL OF CIVIL ENGINEERING, 2023, 27 (11) : 4744 - 4761
  • [25] Dynamic Characteristics of a Long-span Cable-stayed Bridge
    Hui, Liu
    MATERIALS ENGINEERING FOR ADVANCED TECHNOLOGIES, PTS 1 AND 2, 2011, 480-481 : 1496 - 1501
  • [26] Progressive Collapse Behavior of a Long-Span Cable-Stayed Bridge Induced by Cable Loss
    Chen, Qian
    Wang, Hongfan
    El-Tawil, Sherif
    Agrawal, Anil K.
    Bhattacharya, Baidurya
    Wong, Waider
    JOURNAL OF BRIDGE ENGINEERING, 2023, 28 (09)
  • [27] Damage Detection for Long-Span Cable-Stayed Bridge
    赵玲
    李爱群
    缪长青
    汪永兰
    Journal of Southwest Jiaotong University, 2006, (01) : 63 - 72
  • [28] Seismic Analysis of Long-Span Cable-Stayed Bridges by an Integrated Finite Strip Method
    Naderian, Hamidreza
    Cheung, Moe M. S.
    Shen, Zhenyuan
    Dragomirescu, Elena
    JOURNAL OF BRIDGE ENGINEERING, 2016, 21 (03)
  • [29] Practical countermeasures for the aerodynamic performance of long-span cable-stayed bridges with open decks
    Zhou, Rui
    Yang, Yongxin
    Ge, Yaojun
    Mendis, Priyan
    Mohotti, Damith
    WIND AND STRUCTURES, 2015, 21 (02) : 223 - 239
  • [30] Life-Cycle Cost Analysis of Long-Span CFRP Cable-Stayed Bridges
    Liu, Yue
    Gu, Mingyang
    Liu, Xiaogang
    Tafsirojjaman, T.
    POLYMERS, 2022, 14 (09)