Mechanical behavior and track geometry evaluation of long-span cable-stayed bridges with ballastless tracks

被引:2
作者
Zhu, Zhihui [1 ,2 ]
Ren, Zengzhen [2 ]
Zheng, Weiqi [1 ,2 ]
Liu, Wenshuo [1 ,2 ]
Li, Diping [3 ]
Ma, Guang [4 ]
机构
[1] Cent South Univ, Natl Engn Res Ctr High Speed Railway Construct Tec, Changsha, Peoples R China
[2] Cent South Univ, Sch Civil Engn, Changsha, Peoples R China
[3] China Railway Siyuan Survey & Design Grp Co Ltd, Wuhan, Peoples R China
[4] Third Railway Survey & Design Inst Grp Corp, Tianjin, Peoples R China
基金
中国国家自然科学基金;
关键词
Ballastless track; cable-stayed bridge; high-speed railways; track-bridge interaction; track geometry; vehicle-bridge coupling vibration; COUPLING MODEL; SLAB;
D O I
10.1080/15732479.2024.2320694
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Ballastless tracks have been widely used in China's high-speed railways; however, they have only recently been laid on 300 m-class cable-stayed bridges. For cable-stayed bridges with a longer span, the mechanical behavior of ballastless tracks is unclear, and the track construction acceptance method is incomplete, restricting the development of cable-stayed bridges with ballastless tracks. Taking four 300-1000 m-class cable-stayed bridges as research objects, this study established static track-bridge interaction models and dynamic vehicle-bridge coupled models. By evaluating static and dynamic indices, the feasibility of laying ballastless tracks and operating high-speed trains at 350 km/h on cable-stayed bridges was analyzed. Based on the results of dynamic analysis and track geometry evaluation, a 40 m chord was proposed for track geometry acceptance on cable-stayed bridges. The accuracy of the simulation results was verified through the measured data from the Xi-Cheng Railway. The numerical results showed that the 300-1000 m-class cable-stayed bridges with ballastless tracks had good static and dynamic characteristics. The 300 m baseline was unsuitable for the long-wave irregularity evaluation of tracks on cable-stayed bridges, and the 60 m chord was easily affected by wavelengths above 200 m, leading to misjudgment of the evaluation results. The 5 mm limits of the 40 m chord could be used for track geometry acceptance on cable-stayed bridges. Finally, a comprehensive evaluation method for track geometry, namely 10 m chord, 40 m chord, and minimum vertical curve radius, was formed.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Mechanical Behaviors and Fatigue Performances of Ballastless Tracks Laid on Long-Span Cable-Stayed Bridges with Different Arrangements
    Sheng, Xingwang
    Zheng, Weiqi
    Zhu, Zhihui
    SENSORS, 2019, 19 (19)
  • [2] Vertical dynamic response of the ballastless track on long-span plate-truss cable-stayed bridges
    YongLe Li
    Yang Su
    FeiLong Xia
    Nan Zhang
    Science China Technological Sciences, 2015, 58 : 236 - 247
  • [3] Vertical dynamic response of the ballastless track on long-span plate-truss cable-stayed bridges
    LI Yong Le
    SU Yang
    XIA Fei Long
    ZHANG Nan
    Science China(Technological Sciences), 2015, (02) : 236 - 247
  • [4] Vertical dynamic response of the ballastless track on long-span plate-truss cable-stayed bridges
    Li YongLe
    Su Yang
    Xia FeiLong
    Zhang Nan
    SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2015, 58 (02) : 236 - 247
  • [5] Deformation Adaptability of Long-Span Cable-Stayed Bridge and Ballastless Track Structure
    Zhu Z.
    Yan M.
    Li X.
    Sheng X.
    Gao Y.
    Yu Z.
    Zhongguo Tiedao Kexue/China Railway Science, 2019, 40 (02): : 16 - 24
  • [6] Research on the Influence of Geotextile and Elastic Cushion on the Static Performance of Ballastless Track on Long-Span Cable-Stayed Bridges
    Cai, Jiasheng
    Chen, Jinjie
    Wang, Jianxi
    Shi, Xianfeng
    Wang, Rui
    Yang, Yadi
    APPLIED SCIENCES-BASEL, 2023, 13 (24):
  • [7] Deformation adaptability of ballastless track on highway and railway long-span cable-stayed bridge
    Sheng X.
    Guo S.
    Zheng W.
    Zhu Z.
    Hu H.
    Journal of Railway Science and Engineering, 2024, 21 (03) : 1058 - 1067
  • [9] Evaluation of Track Geometry on a Long Span Steel Trussed Cable-stayed Bridge
    Xu, Jinhui
    Wang, Biao
    Wang, Li
    Wang, Ping
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1403 - 1407
  • [10] CORROSION EFFECT ON CABLE STATE OF LONG-SPAN CABLE-STAYED BRIDGES
    Huang, Juan
    Tang, Li-Qun
    4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 366 - 371