Analysis of the Disc Cutter Cutting Load and Performance during TBM Tunneling in Soft-Hard Varied Strata through Laboratory Cutting Test

被引:4
作者
Su, Weilin [1 ,2 ]
Niu, Fumin [1 ,3 ]
Yang, Fengwei [1 ,3 ]
Yang, Yi [2 ]
机构
[1] Yellow River Engn Consulting Co Ltd, 109 Jinshui Rd, Zhengzhou, Henan, Peoples R China
[2] Beijing Jiaotong Univ, Minist Educ Urban Underground Engn, Key Lab, 3 Shangyuan Village, Beijing, Peoples R China
[3] Minist Water Resources, Key Lab Water Management & Water Secur Yellow Rive, 109 Jinshui Rd, Zhengzhou, Henan, Peoples R China
来源
GEOTECHNICAL TESTING JOURNAL | 2023年 / 46卷 / 05期
基金
中国国家自然科学基金;
关键词
tunnel boring machine; disc cutter performance; laboratory cutting test; cutting load; fractal dimension; ROCK; PREDICTION;
D O I
10.1520/GTJ20230312
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Tunnel boring machine (TBM) disc cutters are specially designed for breaking hard rocks and always exhibit unsatisfactory performance during the soft-hard varied stratum tunneling process. To figure out the load and cutting performance of the disc cutter and avoid unsatisfying excavation face crushing effects, a soft-hard varied strata excavation face model was made and rotary cutting tests with full-scale disc cutters were conducted. The load and cutting performance of the disc cutter under different TBM operating conditions were monitored and analyzed based on the test. It was found that the variation of the disc cutter load did not meet the CSM model completely, and the tangential force of the disc cutters in the heterogeneous areas was only about 30-40 % of that in the uniform areas of the excavation face model. An ideal criterion for the excavation face to be crushed successfully was established and the unknown parameters in it were obtained by fitting the test data. The gradation information and fractal dimension of crushing debris were obtained by the sieved-and-weighed method, which can provide indicators for the crushing effect of the disc cutters. Three different disc cutter poor performance modes in the heterogeneous strata cutting process were analyzed: (1) rotating starting failure of the disc cutters caused by tangential load insufficiency, (2) excavation face crushing failure caused by low crack extending capacities of the materials being cut and improper operating parameters (too small cutting depths or too large disc cutter spacing), and (3) adverse excavation face crushing forms (large or powdery debris). These analyses can help with the performance evaluation of disc cutters and the tunneling parameter adoption of the TBM in soft-hard varied strata tunneling engineering.
引用
收藏
页码:712 / 730
页数:19
相关论文
共 32 条
[1]   Investigations into reliability, maintainability and availability of tunnel boring machine operating in mixed ground condition using Markov chains [J].
Agrawal, Anil Kumar ;
Murthy, V. M. S. R. ;
Chattopadhyaya, Somnath .
ENGINEERING FAILURE ANALYSIS, 2019, 105 :477-489
[2]   Simultaneous Effects of Joint Spacing and Orientation on TBM Cutting Efficiency in Jointed Rock Masses [J].
Bejari, Hadi ;
Hamidi, Jafar Khademi .
ROCK MECHANICS AND ROCK ENGINEERING, 2013, 46 (04) :897-907
[3]   EFFECT OF STRAIN RATES FROM 10-2 TO 10-SEC-1 IN TRIAXIAL COMPRESSION TESTS ON 3 ROCKS [J].
BLANTON, TL .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 1981, 18 (01) :47-62
[4]   Evaluation of cutting efficiency during TBM disc cutter excavation within a Korean granitic rock using linear-cutting-machine testing and photogrammetric measurement [J].
Cho, Jung-Woo ;
Jeon, Seokwon ;
Jeong, Ho-Young ;
Chang, Soo-Ho .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2013, 35 :37-54
[5]   Experimental and Numerical Investigations on Rock Breaking of TBM Disc Cutter Based on a Novel Platform with Rotational Cutting [J].
Deng, Long-Chuan ;
Zhang, Fu-Bing ;
Li, Xiao-Zhao ;
Zhang, Chi ;
Ji, Yu-Kun ;
Wu, Yun .
ROCK MECHANICS AND ROCK ENGINEERING, 2023, 56 (02) :1415-1436
[6]   Development and application of a full-scale mechanical rock-cutting platform for measuring the cutting performance of TBM cutter [J].
Deng, Long-Chuan ;
Chi-Zhang ;
Zhuang, Qian-Wei ;
Li, Xiao-Zhao ;
Yuan, Yi-Xiang .
MEASUREMENT, 2022, 204
[7]   Tunnel boring machine performance prediction with scaled rock cutting tests [J].
Entacher, Martin ;
Lorenz, Stefan ;
Galler, Robert .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2014, 70 :450-459
[8]  
Evans I., 1965, International Journal of Rock Mechanics and Mining Sciences Geomechanics Abstracts, V2, P1, DOI DOI 10.1016/0148-9062(65)90018-5
[9]   The performance of TBM disc cutter in soft strata: A numerical simulation using the three-dimensional RBD-DEM coupled method [J].
Fang, Yong ;
Yao, Zhigang ;
Xu, Wanghao ;
Tian, Qingfeng ;
He, Chuan ;
Liu, Sijin .
ENGINEERING FAILURE ANALYSIS, 2021, 119
[10]   An experimental research on the rock cutting process of the gage cutters for rock tunnel boring machine (TBM) [J].
Geng Qi ;
Wei Zhengying ;
Meng Hao .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 52 :182-191