Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost

被引:4
|
作者
Hassan, Abbas [1 ]
El-Rayes, Khaled [2 ]
Attalla, Mohamed [3 ]
机构
[1] Mil Tech Coll, Dept Civil Engn, Cairo, Egypt
[2] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL USA
[3] Univ Illinois, Facil & Serv, Urbana, IL USA
关键词
Repetitive construction projects; linear scheduling; Monte Carlo simulation; uncertainty; optimization; genetic algorithms; GENETIC ALGORITHM; MODEL; LOB;
D O I
10.1080/15623599.2021.1975078
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering risk and uncertainty during the scheduling optimization of repetitive construction projects is a challenging task. This article presents the development of a novel multi-objective stochastic scheduling optimization model for minimizing the expected project duration and cost of repetitive construction projects. The developed model integrated Monte Carlo simulation with a multi-objective genetic algorithm to: (1) consider uncertainties associated with the production rates of the construction crews; and (2) identify an optimal crew formation and crew deployment date for each activity that minimize the project duration and cost. The performance of the developed model was analyzed using a real-life case study that highlighted the novel model capabilities in generating a set of optimal trade-off solutions between expected project duration and cost while considering all uncertainties in crew production rates. These novel capabilities of the developed model enable construction planners to identify and implement an optimal resource utilization plan that account for inherent project risks.
引用
收藏
页码:1447 / 1456
页数:10
相关论文
共 50 条
  • [41] Scenario-oriented repetitive project scheduling optimization
    Hu, Zhiyuan
    Wang, Futian
    Tang, Yuanjie
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2023, 38 (10) : 1239 - 1273
  • [42] Influence of the Construction Risks on the Cost and Duration of a Project
    Lapidus, Azariy
    Topchiy, Dmitriy
    Kuzmina, Tatyana
    Chapidze, Otari
    BUILDINGS, 2022, 12 (04)
  • [43] Multi Objective Optimization for Scheduling Repetitive Projects using GA
    Mathew, Jeeno
    Paul, Brijesh
    Dileeplal, J.
    Mathew, Tinjumol
    1ST GLOBAL COLLOQUIUM ON RECENT ADVANCEMENTS AND EFFECTUAL RESEARCHES IN ENGINEERING, SCIENCE AND TECHNOLOGY - RAEREST 2016, 2016, 25 : 1072 - 1079
  • [44] A non-unit repetitive construction project scheduling with uncertainties
    Long, Luong Duc
    AUTOMATION IN CONSTRUCTION, 2024, 164
  • [45] A genetic algorithm-based method for scheduling repetitive construction projects
    Long, Luong Duc
    Ohsato, Ario
    AUTOMATION IN CONSTRUCTION, 2009, 18 (04) : 499 - 511
  • [46] Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty
    Hassan, Abbas
    El-Rayes, Khaled
    Attalla, Mohamed
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (06) : 1615 - 1634
  • [47] Non-unit-based planning and scheduling of repetitive construction projects
    Huang, Rong-Yau
    Sun, Kuo-Shun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 585 - 597
  • [48] Study on the optimization of Public Construction project duration
    Luo, Fuzhou
    Shang, Jingyu
    Zhou, Yan
    FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1589 - 1592
  • [49] An Inquiry into Optimization of Safety Cost for Construction Projects
    Zhang Xiaobing
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1871 - 1874
  • [50] SIMULATION AND OPTIMIZATION FOR CONSTRUCTION REPETITIVE PROJECTS USING PROMODEL AND SIMRUNNER
    Srisuwanrat, Chachrist
    Ioannou, Photios G.
    Tsimhoni, Omer
    2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 2402 - +