Life Cycle Assessment of the Construction Process in a Mass Timber Structure

被引:6
|
作者
Hemmati, Mahboobeh [1 ]
Messadi, Tahar [2 ]
Gu, Hongmei [3 ]
机构
[1] Univ Arkansas, Environm Dynam PhD Program, Fayetteville, AR 72701 USA
[2] Univ Arkansas, Fay Jones Sch Architecture & Design, Fayetteville, AR 72701 USA
[3] US Forest Serv, USDA, Forest Prod Lab, Madison, WI 53726 USA
关键词
construction process; building; LCA; embodied carbon; mass timber; GREENHOUSE-GAS EMISSIONS; ENVIRONMENTAL IMPACTS; SUSTAINABILITY; ENERGY; BUILDINGS;
D O I
10.3390/su16010262
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Today, the application of green materials in the building industry is the norm rather than the exception and reflects an attempt to mitigate the sector's environmental impacts. Mass timber is growing rapidly in the construction field because of its long span, speed of installation, lightness and toughness, carbon sequestration capabilities, renewability, fire rating, acoustic isolation, and thermal resistance. Mass timber is close to overtaking steel and concrete as the preferred material. The endeavor of this research is to quantitatively assess the ability of this green material to leverage the abatement of carbon emissions. Life cycle assessment (LCA) is a leading method for assessing the environmental impacts of the building sector. The recently completed Adohi Hall mass timber building on the University of Arkansas campus was used as a case study in an investigation to quantify greenhouse gas (GHG) emissions throughout the construction phase only. The energy used in building operations is the most dominant source of emissions in the building industry and has galvanized research on increasing the efficiency of building operations, but reduced emissions have made the impacts of embodied carbon (EC) components more noticeable in the building life cycle. While most studies have focused on the manufacturing stage, only a few to date have focused on the construction process. Consequently, few data are available on the environmental impacts associated with the installation of mass timber as a new green material. The present study began with the quantification of the materials and an inventory of the equipment used for construction. Then, this study determined the EC associated with running the equipment for building construction. The GHG emissions resulting from the transportation of materials to the site were also quantified. Based on data collected from the construction site, the results of this study indicate that earthwork ranks first in carbon emissions, followed by mass timber installation and construction. In third place is ready-mix poured concrete and rebar installation, followed by Geopiers. A comparison of these results with those in the existing literature shows that the EC generally associated with the building construction phase has been underestimated to date. Furthermore, only emissions associated with the fuel usage of the main equipment were considered.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] Comparative life cycle assessment and life cycle costing of lodging in the Himalaya
    Bhochhibhoya, Silu
    Pizzol, Massimo
    Achten, Wouter M. J.
    Maskey, Ramesh Kumar
    Zanetti, Michela
    Cavalli, Raffaele
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2017, 22 (11) : 1851 - 1863
  • [42] Life cycle assessment of a residential building with cross-laminated timber structure in Granada-Spain
    Vidal, R.
    Sanchez-Pantoja, N.
    Martinez, G.
    INFORMES DE LA CONSTRUCCION, 2019, 71 (554)
  • [43] Life Cycle Assessment on Construction and Demolition Waste: A Systematic Literature Review
    Mesa, Jaime A.
    Fuquene-Retamoso, Carlos
    Maury-Ramirez, Anibal
    SUSTAINABILITY, 2021, 13 (14)
  • [44] Life cycle assessment of road construction alternative materials: A literature review
    Balaguera, Alejandra
    Isabel Carvajal, Gloria
    Alberti, Jaume
    Fullana-i-Palmer, Pere
    RESOURCES CONSERVATION AND RECYCLING, 2018, 132 : 37 - 48
  • [45] Scientometric analysis and panoramic review on life cycle assessment in the construction industry
    Aparna, Kamarthi
    Baskar, K.
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2024, 9 (04)
  • [46] A hybrid life cycle assessment of atomic layer deposition process
    Wang, Endong
    Yuan, Chris
    JOURNAL OF CLEANER PRODUCTION, 2014, 74 : 145 - 154
  • [47] Process-oriented life cycle assessment modelling in EASETECH
    Lodato, Concetta
    Zarrin, Bahram
    Damgaard, Anders
    Baumeister, Hubert
    Astrup, Thomas Fruergaard
    WASTE MANAGEMENT, 2021, 127 : 168 - 178
  • [48] Taxonomy of uncertainty in environmental life cycle assessment of infrastructure projects
    Saxe, Shoshanna
    Guven, Gursans
    Pereira, Lucas
    Arrigoni, Alessandro
    Opher, Tamar
    Roy, Adrien
    Arceo, Aldrick
    Von Raesfeld, Sofia Sampedro
    Duhamel, Mel
    McCabe, Brenda
    Panesar, Daman K.
    MacLean, Heather L.
    Posen, I. Daniel
    ENVIRONMENTAL RESEARCH LETTERS, 2020, 15 (08)
  • [49] Environmental life cycle assessment of corn production in tropical regions
    Hossein, Hekmat Younes
    Azizpanah, Amir
    Namdari, Majid
    Shirkhani, Hamidreza
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [50] Life Cycle Assessment of an On-Road Dynamic Charging Infrastructure
    Marmiroli, Benedetta
    Dotelli, Giovanni
    Spessa, Ezio
    APPLIED SCIENCES-BASEL, 2019, 9 (15):