A VALUE-BAS ED NETWORK ANALYSIS FOR STAKEHOLDER ENGAGEMENT THROUGH PREFABRICATED CONSTRUCTION LIFE CYCLE: EVIDENCE FROM CHINA

被引:3
作者
Dang, Pei [1 ]
Geng, Linna [2 ]
Niu, Zhanwen [3 ]
Chan, Melissa [4 ,5 ]
Yang, Wei [6 ]
Gao, Shang [6 ]
机构
[1] Tianjin Chengjian Univ, Sch Econ & Management, 26 Jinjing Rd, Tianjin 300384, Peoples R China
[2] Western Sydney Univ, Sch Engn Design & Built Environm, Sydney 2150, Australia
[3] Tianjin Univ, Coll Management & Econ, 92 Weijin Rd, Tianjin, Peoples R China
[4] Victoria Univ, Coll Sport Hlth & Engn, Melbourne, Vic 3001, Australia
[5] Victoria Univ, Inst Sustainable Ind & Liveable Cities ISILC, Melbourne, Vic 3001, Australia
[6] Univ Melbourne, Fac Architecture Bldg & Planning, Melbourne, Vic 3010, Australia
关键词
prefabrication; stakeholder engagement; values; life cycle; OFF-SITE CONSTRUCTION; PROJECT-MANAGEMENT; HONG-KONG; MODEL; BARRIERS; SYSTEM; SUSTAINABILITY; ADVANTAGE; FRAMEWORK; DYNAMICS;
D O I
10.3846/jcem.2024.20726
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Over the past decade, prefabricated construction has increasingly gained popularity in addressing environmental concerns while meeting the high construction demand, particularly in developing countries. Accordingly, the concept of stakeholder engagement increasingly garnered attention as it is highly relevant for understanding and explaining the relationships among various stakeholders, like contractors, suppliers, and producers, especially within the fragmented context of prefabrication. To further the field, this study aims to provide a comprehensive qualitative and quantitative analysis for stakeholder engagement in the realm of prefabricated construction via a value-based network. This value-based network analysis is utilized to model multiple relationships between stakeholders as value exchanges, thus enabling to engage them though management with a focus. Specifically, A total of 110 values were identified and analyzed among 12 stakeholders throughout the whole lifecycle via an extensive literature review, interviews, and questionnaires directed at prefabrication practitioners in China. This data collection process garnered 194 valid responses with a 64.7% response rate. The findings show that enhancing stakeholder engagement requires improvements in both the abilities and experiences of developers, and in the collaborative relationships among key stakeholders. These improvements can be achieved by prioritizing the engagement of prefabrication consultants and encouraging the government to issue policies that support developers, producers, and consultants in fostering collaboration. This in-depth network analysis offers practical insights for decision-makers in the management of core stakeholders and value-based relationships, thereby improving stakeholder engagement. Additionally, it expands the current body of knowledge on stakeholder engagement by incorporating the value-based network analysis into the exploration of its stakeholders and relationships.
引用
收藏
页码:49 / 66
页数:18
相关论文
共 96 条
[1]   A lean construction framework with Six Sigma rating [J].
Al-Aomar, Raid .
INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2012, 3 (04) :299-314
[2]   How to assess stakeholders' influence in project management? A proposal based on the Analytic Network Process [J].
Aragones-Beltran, Pablo ;
Garcia-Melon, Monica ;
Montesinos-Valera, Jesus .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (03) :451-462
[3]  
Asamoah RO, 2016, Journal of Construction Engineering, V2016, P1, DOI [10.1155/2016/8785129, 10.1155/2016/8785129]
[4]   Novel Approach to Satisfying Stakeholders in Megaprojects: Balancing Mutual Values [J].
Bahadorestani, Amir ;
Karlsen, Jan Terje ;
Farimani, Nasser Motahari .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (02)
[5]   Planning for sustainable stakeholder engagement based on the assessment of conflicting interests in projects [J].
Bahadorestani, Amir ;
Naderpajouh, Nader ;
Sadiq, Rehan .
JOURNAL OF CLEANER PRODUCTION, 2020, 242
[6]   Stakeholder Engagement: Achieving Sustainability in the Construction Sector [J].
Bal, Menoka ;
Bryde, David ;
Fearon, Damian ;
Ochieng, Edward .
SUSTAINABILITY, 2013, 5 (02) :695-710
[7]  
Bao Ngoc Nguyen, 2020, IOP Conference Series: Materials Science and Engineering, V869, DOI [10.1088/1757-899x/869/6/062029, 10.1088/1757-899X/869/6/062029]
[8]  
Baumfield V. S, 2016, Australian Journal of Corporate Law, V187
[9]   Project relationship management and the Stakeholder Circle(TM) [J].
Bourne, Lynda ;
Walker, Derek H. T. .
INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2008, 1 (01) :125-130
[10]   Stakeholder Theory: The State of the Art [J].
Bowie, Norman E. .
BUSINESS ETHICS QUARTERLY, 2012, 22 (01) :179-185