Parallel Power System Restoration

被引:2
作者
Chopra, Sunil [1 ]
Qiu, Feng [2 ]
Shim, Sangho [3 ]
机构
[1] Northwestern Univ, Kellogg Sch Management, Evanston, IL 60208 USA
[2] Argonne Natl Lab, Energy Syst Div, Lemont, IL 60439 USA
[3] Robert Morris Univ, Sch Engn Math & Sci, Moon Township, PA 15108 USA
关键词
integer programming; randomized rounding; power system restoration; generator startup sequencing; centered network partition problem; SECTIONALIZING STRATEGIES; OPTIMIZATION;
D O I
10.1287/ijoc.2022.1258
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
After a blackout event, power system restoration is an essential activity for grid resilience; operators restart generators, re-establish transmission paths, and restore loads. With a goal of restoring electric service in the shortest time, the core decisions in restoration planning are to partition the grid into subnetworks, each of which has an initial power source for black-start (called sectionalization problem), and then restart all generators in each network (called generator startup sequencing (GSS) problem) as soon as possible. Due to their complexity, the sectionalization and GSS problems are usually solved separately, often resulting in a suboptimal solution. Our paper develops models and computational methods to solve the two problems simultaneously. We first study the computational com-plexity of the GSS problem and develop an efficient integer linear programming formula-tion. We then integrate the GSS problem with the sectionalization problem and develop an integer linear programming formulation for the parallel power system restoration (PPSR) problem to find exact optimal solutions. To solve larger systems, we then develop bounding approaches that find good upper and lower bounds efficiently. Finally, to address computa-tional challenges for very large power grids, we develop a randomized approach to find a high-quality feasible solution quickly. Our computational experiments demonstrate that the proposed approaches are able to find good solutions for PPSR in up to 2,000-bus systems.
引用
收藏
页码:233 / 247
页数:16
相关论文
共 50 条
  • [1] Power system observability enhancement for parallel restoration of subsystems considering renewable energy resources
    Khodabakhshian, Amin
    Amin, Mohammad Reza
    Hooshmand, Rahmat-allah
    Siano, Pierluigi
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2020, 30 (04)
  • [2] Blackstart capability planning for power system restoration
    Jiang, Yazhou
    Chen, Sijie
    Liu, Chen-Ching
    Sun, Wei
    Luo, Xiaochuan
    Liu, Shanshan
    Bhatt, Navin
    Uppalapati, Sunitha
    Forcum, David
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2017, 86 : 127 - 137
  • [3] A dynamic partitioning method for power system parallel restoration considering restoration-related uncertainties
    Li, Ze
    Xue, Yusheng
    Wang, Haohao
    Hao, Lili
    ENERGY REPORTS, 2020, 6 : 352 - 361
  • [4] Power system restoration: a literature review from 2006 to 2016
    Liu, Yutian
    Fan, Rui
    Terzija, Vladimir
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2016, 4 (03) : 332 - 341
  • [5] A MILP-based power system parallel restoration model with the support of mobile energy storage systems
    Xie, Yunyun
    Cai, Sheng
    Wang, Jie
    Chen, Yuhuan
    Qiu, Chenguang
    ELECTRIC POWER SYSTEMS RESEARCH, 2024, 234
  • [6] Optimal Placement of Phasor Measurement Units to Improve Parallel Power System Restoration
    Tortos, J. Quiros
    Valverde, G.
    Ding, L.
    Terzija, V.
    2011 2ND IEEE PES INTERNATIONAL CONFERENCE AND EXHIBITION ON INNOVATIVE SMART GRID TECHNOLOGIES (ISGT EUROPE), 2011,
  • [7] An Improved Label Propagation Algorithm-Based Method to Develop Sectionalizing Strategies for Parallel Power System Restoration
    Huang, Shujian
    Li, Changcheng
    Li, Zhicheng
    Xu, Wenwen
    Yang, Long
    IEEE ACCESS, 2020, 8 : 118497 - 118509
  • [8] Sectionalizing strategies for minimizing outage durations of critical loads in parallel power system restoration with bi-level programming
    Liu, Weijia
    Lin, Zhenzhi
    Wen, Fushuan
    Chung, C. Y.
    Xue, Yusheng
    Ledwich, Gerard
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 71 : 327 - 334
  • [9] Optimal Black Start Allocation for Power System Restoration
    Patsakis, Georgios
    Rajan, Deepak
    Aravena, Ignacio
    Rios, Jennifer
    Oren, Shmuel
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (06) : 6766 - 6776
  • [10] Power system restoration in restructured power industry
    Lin, Zhenzhi
    Wen, Fushuan
    2007 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-10, 2007, : 2628 - +