Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)

被引:4
作者
Shim, Jae-Hyung [1 ]
Ham, Nam-Hyuk [2 ]
Kim, Jae-Jun [1 ]
机构
[1] Hanyang Univ, Dept Architectural Engn, 222 Wangsimni Ro, Seoul 04763, South Korea
[2] Hanyang Cyber Univ, Dept Digital Architecture & Urban Engn, 220 Wangsimni Ro, Seoul 04763, South Korea
基金
新加坡国家研究基金会;
关键词
Agile project management; Scrum framework; construction coordination; BIM; exCPM; PROJECT; VALIDATION; SIMULATION; IMPACT;
D O I
10.3390/buildings14020358
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Agile project management pursues repetitive and continuous management through an empirical process control method considering the complexity of the project. This study aimed to propose a collaborative Building Information Modeling (BIM)-based work process, focusing on construction coordination tasks among participants during the construction phase of a project. The theoretical framework chosen for this endeavor was the Scrum framework, selected after analyzing previous research to align with the specific characteristics of construction coordination. Using the Scrum framework as a foundation, the study employed the exCPM methodology to model the collaborative BIM-based construction coordination progress. To validate the model, it underwent a transformation into a Petri-Nets model through the marked graph building block (MGBB) along with established rules for model conversion. The converted model was then subjected to validation through reachability tree analysis. The findings of this study hold applicability to diverse collaboration processes that leverage BIM in the construction industry.
引用
收藏
页数:20
相关论文
共 54 条
[1]   Research in Modeling and Simulation for Improving Construction Engineering Operations [J].
AbouRizk, S. ;
Halpin, D. ;
Mohamed, Y. ;
Hermann, U. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2011, 137 (10) :843-852
[2]   From BIM to extended reality in AEC industry [J].
Alizadehsalehi, Sepehr ;
Hadavi, Ahmad ;
Huang, Joseph Chuenhuei .
AUTOMATION IN CONSTRUCTION, 2020, 116
[3]   Cloud-Based BIM Governance Platform Requirements and Specifications: Software Engineering Approach Using BPMN and UML [J].
Alreshidi, Eissa ;
Mourshed, Monjur ;
Rezgui, Yacine .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2016, 30 (04)
[4]  
Andreani M., 2019, Archit. Eng, V4, P3, DOI [10.23968/2500-0055-2019-4-2-3-12, DOI 10.23968/2500-0055-2019-4-2-3-12]
[5]  
[Anonymous], 2013, Proceedings IGLC-21, P761, DOI DOI 10.13140/RG.2.1.2362.5766
[6]  
BEETZ J, 2018, BUILDING INFORM MODE, P127, DOI DOI 10.1007/978-3-319-92862-3_6
[7]   Factors affecting the success of a construction project [J].
Chan, APC ;
Scott, D ;
Chan, APL .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (01) :153-155
[8]   Beyond the third dimension of BIM: A systematic review of literature and assessment of professional views [J].
Charef, Rabia ;
Alaka, Hafiz ;
Emmitt, Stephen .
JOURNAL OF BUILDING ENGINEERING, 2018, 19 :242-257
[9]   Suitability of the critical incident technique to measure quality of construction coordination [J].
De Saram, DD ;
Ahmed, SM ;
Anson, M .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2004, 20 (03) :97-109
[10]  
Eastman CM, 1999, DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS, P2139