Critical risk factors for construction supply chain in China: a fuzzy synthetic evaluation analysis

被引:5
作者
Deng, Binchao [1 ]
Lv, Xindong [1 ]
Du, Yaling [1 ]
Li, Xiaoyu [1 ]
Yin, Yilin [1 ]
机构
[1] Tianjin Univ Technol, Sch Management, Tianjin, Peoples R China
基金
中国国家自然科学基金;
关键词
Risk management; Construction supply chain; Fuzzy synthetic evaluation; MANAGEMENT; PROJECTS; AHP; SUSTAINABILITY; INTEGRATION; CONTRACTORS; PERCEPTION; FRAMEWORK; KNOWLEDGE; SELECTION;
D O I
10.1108/ECAM-12-2022-1158
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeInefficiency dilemmas in project governance are caused by various risks arising from the characteristic of construction supply chain projects, such as poor project performance, conflicts between stakeholders and cost overrun. This research aims to establish a fuzzy synthetic evaluation (FSE) model to analyze construction supply chain risk factors. Corresponding risk mitigation strategies are provided to facilitate the improvement performance of ongoing construction supply chain projects.Design/methodology/approachA literature review is utilized to reveal the deficiencies of construction supply chain risk management. Thus, a total of five hundred (500) questionnaires are distributed to construction professionals, and four hundred and thirty-five (435) questionnaires are recovered to obtain the evaluation data of construction professionals on critical risk factors. Additionally, the FSE is used to analyze and rank the significance of critical risk factors. Finally, this research discusses nine critical risk factors with high weight in the model, and explains the reason for the significance of critical risk factors in the construction supply chain.FindingsThe questionnaire results show that the thirty-one (31) identified critical risk factors are verified by related practitioners (government departments, universities and research institutions, owners, construction units, financial institutions, design units, consulting firms). Thirty-one (31) identified critical risk factors are divided into common risks, risks from contractors and risks from owners. The most significant factors in the three categories, respectively, are "political risks," "owner's unprofessional" approach and "cash flow." Managing these risks can facilitate the development of the construction supply chain.Originality/valueThis paper expands the research perspective of construction supply chain risk management and complements the risks in the construction supply chain. For practitioners, the research result provides some corresponding measures to deal with these risks. For researchers, the research result provides the direction of construction supply chain risk treatment.
引用
收藏
页码:483 / 506
页数:24
相关论文
共 116 条
[11]  
Basu R., 2011, Journal of Social and Development Sciences, V1, P109, DOI [10.22610/jsds.v1i3.634, DOI 10.22610/JSDS.V1I3.634]
[12]  
Bavarsad B., 2014, International Journal of Operations and Logistics Management, V3, P192
[13]   Understanding Construction Supply Chain Management [J].
Behera, Panchanan ;
Mohanty, R. P. ;
Prakash, Anand .
PRODUCTION PLANNING & CONTROL, 2015, 26 (16) :1332-1350
[14]   A Natural Resource Scarcity Typology: Theoretical Foundations and Strategic Implications for Supply Chain Management [J].
Bell, John E. ;
Autry, Chad W. ;
Mollenkopf, Diane A. ;
Thornton, LaDonna M. .
JOURNAL OF BUSINESS LOGISTICS, 2012, 33 (02) :158-166
[15]   Supply chain risk management (SCRM): a case study on the automotive and electronic industries in Brazil [J].
Blos, Mauricio F. ;
Quaddus, Mohammed ;
Wee, H. M. ;
Watanabe, Kenji .
SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2009, 14 (04) :247-252
[16]   Identification of river water quality using the Fuzzy Synthetic Evaluation approach [J].
Chang, NB ;
Chen, HW ;
Ning, SK .
JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2001, 63 (03) :293-305
[17]   Integrating FSE and AHP to Identify Valuable Customer Needs by Service Quality Analysis [J].
Chang, Tien-Hsiang ;
Hsu, Kuei-Ying ;
Fu, Hsin-Pin ;
Teng, Ying-Hua ;
Li, Yi-Jhen .
SUSTAINABILITY, 2022, 14 (03)
[18]  
Chao-hui Wu, 2005, International Journal of Project Management, V23, P554, DOI 10.1016/j.ijproman.2004.07.010
[19]   Study on the Application of Lean Construction Supply Chain Management in EPC Project [J].
Chen, Yan .
ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION III, PTS 1 AND 2, 2012, 201-202 :1207-1212
[20]   Supply chain risk management: a new methodology for a systematic literature review [J].
Colicchia, Claudia ;
Strozzi, Fernanda .
SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2012, 17 (04) :403-418