Production planning approaches: a review from green perspective

被引:4
作者
Qasim, Muhammad [1 ,2 ]
Wong, Kuan Yew [1 ]
Saufi, Mohd Syahril Ramadhan Mohd [1 ]
机构
[1] Univ Teknol Malaysia, Fac Mech Engn, Skudai 81310, Malaysia
[2] Univ Engn & Technol, Dept Ind Engn, Jalozai Campus, Peshawar 25000, Pakistan
基金
英国科研创新办公室;
关键词
Production planning; Aggregate production planning; Optimization; Scheduling; Lot-sizing; Energy efficiency; Low carbon; Environmental-friendly production; SHOP SCHEDULING PROBLEM; FLEXIBLE JOB-SHOP; LOT-SIZING PROBLEM; MINIMIZING ENERGY-CONSUMPTION; TOTAL COMPLETION-TIME; BEE COLONY ALGORITHM; CARBON EMISSION; MULTIOBJECTIVE OPTIMIZATION; GENETIC ALGORITHM; TARDINESS PENALTY;
D O I
10.1007/s11356-022-24995-2
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
There is an increasing concern about incorporating green criteria into production planning approaches. Production planning models that ignore green parameters may generate outcomes that are unfriendly to the environment. The relevant literature has suggested a flourishing trend towards the integration of green parameters into production planning approaches. The earlier reviews have most commonly analyzed the green production planning approaches from an "energy efficiency" perspective. Literature on the integration of other green criteria is also available. However, such studies are rarely reviewed. Along with "energy efficiency," the study in hand reviews the production planning strategies from another green perspective which is "low-carbon emissions." The first objective of this study is to review the medium and short-term production planning approaches from the aforementioned green criteria and provide a classification scheme. Second, new research avenues are identified to facilitate researchers in incorporating green schemes in production planning approaches. This study explored various databases for articles published on green production planning approaches. Consequently, 84 articles published between 2011 and 2022 were considered for the review. This review pointed out that most of the studies on green production planning considered "energy efficiency" and studies on "carbon emissions" were overlooked. Furthermore, green concepts were mostly integrated into the short-term production planning level and comparatively few studies were found for the medium-term. This study will help researchers to analyze green production planning in terms of modeling approaches, objective functions, uncertainties, solution approaches, etc.
引用
收藏
页码:90024 / 90049
页数:26
相关论文
共 107 条
[81]   A two-stage optimization method for energy-saving flexible job-shop scheduling based on energy dynamic characterization [J].
Wang, Han ;
Jiang, Zhigang ;
Wang, Yan ;
Zhang, Hua ;
Wang, Yanhong .
JOURNAL OF CLEANER PRODUCTION, 2018, 188 :575-588
[82]   A novel multi-objective optimization algorithm for the integrated scheduling of flexible job shops considering preventive maintenance activities and transportation processes [J].
Wang, Hui ;
Sheng, Buyun ;
Lu, Qibing ;
Yin, Xiyan ;
Zhao, Feiyu ;
Lu, Xincheng ;
Luo, Ruiping ;
Fu, Gaocai .
SOFT COMPUTING, 2021, 25 (04) :2863-2889
[83]   Bi-objective identical parallel machine scheduling to minimize total energy consumption and makespan [J].
Wang, Shijin ;
Wang, Xiaodong ;
Yu, Jianbo ;
Ma, Shuan ;
Liu, Ming .
JOURNAL OF CLEANER PRODUCTION, 2018, 193 :424-440
[84]  
Wang W., 2022, Scientia Iranica, DOI [10.24200/sci.2022.58317.5665, DOI 10.24200/SCI.2022.58317.5665]
[85]   The green capacitated multi-item lot sizing problem with parallel machines [J].
Wu, Tao ;
Xiao, Fan ;
Zhang, Canrong ;
He, Yan ;
Liang, Zhe .
COMPUTERS & OPERATIONS RESEARCH, 2018, 98 :149-164
[86]   The flexible job-shop scheduling problem considering deterioration effect and energy consumption simultaneously [J].
Wu, Xiuli ;
Shen, Xianli ;
Li, Congbo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 135 :1004-1024
[87]   A green scheduling algorithm for flexible job shop with energy-saving measures [J].
Wu, Xiuli ;
Sun, Yangjun .
JOURNAL OF CLEANER PRODUCTION, 2018, 172 :3249-3264
[88]   A branch and bound algorithm for a parallel machine scheduling problem in green manufacturing industry considering time cost and power consumption [J].
Xiao, Yujie ;
Zheng, Yan ;
Yu, Yuantang ;
Zhang, Lianmin ;
Lin, Xiaowei ;
Li, Bin .
JOURNAL OF CLEANER PRODUCTION, 2021, 320
[89]   An Effective Multi-Objective Artificial Bee Colony Algorithm for Energy Efficient Distributed Job Shop Scheduling [J].
Xie, Jin ;
Gao, Liang ;
Pan, Quan-ke ;
Tasgetiren, M. Fatih .
25TH INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH MANUFACTURING INNOVATION: CYBER PHYSICAL MANUFACTURING, 2019, 39 :1194-1203
[90]   Production scheduling of off-site prefabricated construction components considering sequence dependent due dates [J].
Yazdani, Maziar ;
Kabirifar, Kamyar ;
Fathollahi-Fard, Amir M. ;
Mojtahedi, Mohammad .
ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021,