Sustainable production inventory management through bi-level greening performance in a three-echelon supply chain

被引:5
作者
Panja, Subrata [1 ,2 ]
Mondal, Shyamal Kumar [1 ]
机构
[1] Vidyasagar Univ, Dept Appl Math Oceanol & Comp Programming, Midnapore 721102, West Bengal, India
[2] Haldia Inst Technol, Sch Appl Sci & Humanities, Haldia, India
关键词
Bi-level greening; Imperfect production; Sustainability; Credit policy; Generalized type-2 fuzzy set; CREDIT PERIOD; TIME-VALUE; IMPERFECT QUALITY; DETERIORATING ITEM; MODEL; DEMAND; COORDINATION; INFLATION; COMPETITION; DECISIONS;
D O I
10.1007/s12351-023-00763-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Recently, different greening activities in various steps of a supply chain are being used to keep a system sustainable. As a result, it creates a terrific business opportunity for a business concern. In such a direction, the present study develops a supplier-manufacturer-retailer green supply chain model under a bi-level greening performance. The first level of a greening performance is in the raw-materials delivered by a supplier, while the second level is in the production process of the manufacturer's production house. The novelty of this model is that stocking decision has been taken on the basis of levels of these greening activities. Also, here the supplier offers a credit period to the manufacturer based on the quantity and quality of the raw-materials ordered by him/her, whereas the manufacturer forwards a credit period, which has been assumed as type-2 fuzzy in nature to tackle a non-random uncertainty, to the retailer. Under such a fuzzy uncertain environment, a new defuzzification process has been proposed to get the optimal solution of the model. Comparing different scenarios of the proposed model, our findings reveal that although bi-level greening performance is beneficial from the perspective of the whole supply chain, it is less profitable from the manufacturer's point of view. It also reveals that bi-level greening activity positively impacts the credit policy of supply chain members. On the sustainability issue, the imperfect production has a negative impact on economic and environmental performances. Finally, several practical managerial implications have been provided to make a decision on bi-level greening performance.
引用
收藏
页数:55
相关论文
共 56 条
[1]   A bi-objective multi-period series-parallel inventory-redundancy allocation problem with time value of money and inflation considerations [J].
Alikar, Najmeh ;
Mousavi, Seyed Mohsen ;
Ghazilla, Raja Ariffin Raja ;
Tavana, Madjid ;
Olugu, Ezutah Udoncy .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 104 :51-67
[2]   Green credit financing versus trade credit financing in a supply chain with carbon emission limits [J].
An, Simin ;
Li, Bo ;
Song, Dongping ;
Chen, Xue .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 292 (01) :125-142
[3]   Adjustment of credit period and stock-dependent demands in a supply chain model with variable imperfectness [J].
Banu, Ateka ;
Manna, Amalesh Kumar ;
Mondal, Shyamal Kumar .
RAIRO-OPERATIONS RESEARCH, 2021, 55 (03) :1291-1324
[4]   Analyzing an inventory model with two-level trade credit period including the effect of customers' credit on the demand function usingq-fuzzy number [J].
Banu, Ateka ;
Mondal, Shyamal Kumar .
OPERATIONAL RESEARCH, 2020, 20 (03) :1559-1587
[5]   A multi-objective transportation problem with cost dependent credit period policy under Gaussian fuzzy environment [J].
Bera, Raj Kumar ;
Mondal, Shyamal Kumar .
OPERATIONAL RESEARCH, 2022, 22 (04) :3147-3182
[6]   ECONOMIC ORDER QUANTITIES WITH INFLATION [J].
BUZACOTT, JA .
OPERATIONAL RESEARCH QUARTERLY, 1975, 26 (03) :553-558
[7]   Optimizing pricing, replenishment and rework decision for imperfect and deteriorating items in a manufacturer-retailer channel [J].
Chen, Tsung-Hui .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2017, 183 :539-550
[8]   Fuzzy multicycle manufacturing/remanufacturing production decisions considering inflation and the time value of money [J].
Chen, Weida ;
Wei, Li ;
Li, Yaguang .
JOURNAL OF CLEANER PRODUCTION, 2018, 198 :1494-1502
[9]  
Das B., 2017, Tkhne Revista de EstudosAplicadosemGesto, V15, P124, DOI [10.1016/j.tekhne.2017.10.001, DOI 10.1016/J.TEKHNE.2017.10.001]
[10]   An integrated production-inventory model with defective item dependent stochastic credit period [J].
Das, Bibhas Chandra ;
Das, Barun ;
Mondal, Shyamal Kumar .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 110 :255-263